ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / radhe enclave

Registration lapsed No litigation declared Others project

radhe enclave

By radhe builcon

RG-MH-44415 · RERA P50500026010 · Last updated on MahaRERA portal: 22 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

radhe enclave is a Others project by radhe builcon in Nagpur, Maharashtra, registered with MahaRERA as P50500026010 on 9 Aug 2020. Possession was promised by 25 Jun 2024 and is now 28 months past that date.

At a glance

Project

  • Nameradhe enclave
  • TypeOthers
  • Location
    • shivajinagar gandhinagar road
    • gandhinagar
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • RERA no.P50500026010
  • ReraGenie IDRG-MH-44415

Builder

  • Nameradhe builcon
  • Entity typePartnership
  • PartnersBRAJESH MURARKA, ARVIND PATIL

Key dates

28 months past promisethis monthRegisteredAug 2020PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2020
  • Promised completion25 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RADHE BUILDCONNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

RADHE BUILDCON: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area395 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI789.4
Proposed, not sanctioned789 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANDHIBAG SAHAKARI BANK LTDMAHAL NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLOKESH KADU
EngineerVIRENDRA CHAUHAN
Chartered AccountantBRAJESH MURARKA
PartnerRole in project
RADHE BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Radhe Enclave Form 1.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Mar-25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Mar 25.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_Radhe Enclave_Mar-25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_DEC-24.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: D-24.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Dec-24.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Dec-24.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 RADHE ENCLAVE 02-01-2025.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radhe Enlave Form 5.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM-2A_MAR-21.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: JUNE-23.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_SEP-24.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD SEP-24.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: SEP-24.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: JUNE-24.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: MARCH-24.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: DEC-23.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: SEP-23.pdf29 Nov 2024
Disclosure of sold/ booked inventoryFile: MARCH-23.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A_MAR-22.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A_MAR-23.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A_MAR-24.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Radhe Enclave_Mar-24.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_mar 23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Sept 24.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_June 24.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Mar 24.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Dec 23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Sept 23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_June 23.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Dec-22.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Sept-22.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Mar-22.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Dec-21.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Sept-21.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_June-21.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Mar-21.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Dec-20.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_Sept-20.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_Radhe Enclave_Engineers Certificate_june-22.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_June-24.pdf31 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_MAR-24.pdf31 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Dec-23.pdf31 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Sep-23.pdf31 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_June-23.pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 RADHE ENCLAVE 08-10-2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 RADHE ENCLAVE 05-07-2024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Mar-23.pdf25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Radhe Buildcon Form 5' 2022-23.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Radhe Enclave Form 1.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Radhe Enclave_Form-1- Architect Certificate_Mar-23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Radhe Enclave_Form-1- Architect Certificate_June-23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Radhe Enclave_Form-1- Architect Certificate_Sept-23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Radhe Enclave_Form-1- Architect Certificate_Dec-23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_SEPT-20.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_DEC-20.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_MAR-21.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_JUNE-21.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_SEPT-21.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_DEC-21.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_MAR-22.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_JUNE-22.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_SEPT-22.pdf22 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_RADHE ENCLAVE_DEC-22.pdf22 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_Radhe Enclave_June-22.pdf20 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_Radhe Enclave_Sep-22.pdf20 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_Radhe Enclave_Dec-22.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_June-22.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Sept-22.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Radhe Enclave_Dec-22.pdf20 Mar 2023
Disclosure of sold/ booked inventoryFile: RADHE BUILDCON_JUNE-21.pdf21 Feb 2023
Disclosure of sold/ booked inventoryFile: RADHE BUILDCON_SEPT-21.pdf21 Feb 2023
Disclosure of sold/ booked inventoryFile: RADHE BUILDCON_DEC-21.pdf21 Feb 2023
Disclosure of sold/ booked inventoryFile: RADHE BUILDCON_MAR-22.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_RADHE ENCLAVE_SEPT-20.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_RADHE ENCLAVE_DEC-20.pdf17 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_RADHE ENCLAVE_MAR-21.pdf17 Feb 2023

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep radhe enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near gandhinagar2,800+ in Nagpur

Builder: radhe builcon

radhe builcon has 1 registration on MahaRERA, including radhe enclave. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that radhe enclave shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if radhe enclave is delayed beyond 25 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of radhe enclave?

The registered promoter entity is radhe builcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in radhe enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for radhe enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at radhe enclave?

The professionals named in the filing: Architect: LOKESH KADU; Engineer: VIRENDRA CHAUHAN; Chartered Accountant: BRAJESH MURARKA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in radhe enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About radhe enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save radhe enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.