RADHA HEIGHTS
By K M DEVELOPERS AND BUILDERS
RG-MH-17540 · RERA P53000029539 · Last updated on MahaRERA portal: 10 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 15 months past the filed date
- Completion date moved by 12 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RADHA HEIGHTS is a Residential / Group Housing project by K M DEVELOPERS AND BUILDERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000029539 on 4 Jun 2021. Possession was promised by 11 Jul 2025 and is now 15 months past that date. The completion date has moved by 12 months from the original filing. 22 of the 26 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameRADHA HEIGHTS
- TypeResidential / Group Housing
- Location
- E WARD
- KADAMAWADI
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- RERA no.P53000029539
- ReraGenie IDRG-MH-17540
Builder
- NameK M DEVELOPERS AND BUILDERS
- Entity typePartnership
- PartnersSHASHIKANT SHIVAJIRAO KADAM, SATYAJEET SHIVAJIRAO KADAM, SANTHOSH SHIVAJIRAO KADAM, BHARAT SHIVAJIRAO KADAM
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Jun 2021
- Promised completion11 Jul 2025
- Revised completionRevised to 11 Jul 2025 (originally 31 Jul 2024)
- Buildings1 building record
- Documents filed65 files
Current status
Figures as on 10 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RADHA HEIGHTS | NA | 9 | 7 | 24 | 2 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
RADHA HEIGHTS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed44
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| KM DEVELOPERS AND BUILDERS | Kolhapur (M Corp.) | Kolhapur |
| AMOL SAMBHAJI JAGDALE | Kolhapur (M Corp.) | Kolhapur |
| SHIVAJIRAO MARUTRAO KADAM | Kolhapur (M Corp.) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RADHA HEIGHTS | NA | Rs 4.39 cr | Rs 4.39 cr |
| - | NA | Rs 7.66 lakh | Rs 7.66 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAJENDRA SABALE |
| Engineer | AMOL SAMBHAJI JAGDALE SAMBHAJI JAGDALE |
| Chartered Accountant | SHANKAR VITTHAL PATIL VITTHAL PATIL |
| Partner | Role in project |
|---|---|
| K M DEVELOPERS AND BUILDERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, K M Developer, a partnership firm registered under MahaRERA (Registration No. P5300029539), are writing to request an extension of our project completion date from 31/03/2027 to 31/03/2025 due to unforeseen delays. We have planned to construct two additional flats. The necessary Transferable Development Rights (TDR) were delayed and only received on 17/01/2024.Despite applying for the revised plan sanction on 28/02/2024, the approval is still pending with the Municipal Corporation. These unforeseen delays have significantly impacted our project timeline. Therefore, we kindly request an ext
Reason as filed by the promoterThe original date of completion of the project "Radha Residency" as registered with MahaRERA was 31/03/2025. The construction and development work of the project were completed well within the stipulated time. However, due to procedural delays in obtaining the Occupancy Certificate (OC) from the competent authority, the OC could not be secured before the original completion date. To comply with MahaRERA requirements and ensure that all statutory approvals are in place before marking the project as completed on the portal, we applied for an extension of the project registration up to 11/07/2025
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A (1).pdf | 10 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form_5_2024_25 K M_ Developers.pdf | 8 Aug 2026 |
| Withdrawal Update Form 1File: Arch Form 1.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: Arch Form 1.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate Form 2.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate Form 2.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: Form_3_KM Developers_30062025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: Form_3_KM Developers_11072025.pdf | 21 Feb 2026 |
| Form 1File: Arch Form 1.pdf | 25 Jun 2025 |
| Form 2File: Engineers Certificate 2.pdf | 25 Jun 2025 |
| Form 3File: CA Certificate Form 3.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory Disclosure.pdf | 25 Jun 2025 |
| Building plan approvalFile: BUILDING PLAN.pdf | 26 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Bandhkam parvana.pdf | 26 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 26 Feb 2025 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 26 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 15022025.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_3112204.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineer _Certificate.pdf | 17 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form_5_KM_Developers_31032024.pdf | 29 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Self Declaration Legal Encumbrances.pdf | 26 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Self Declaration Legal Encumbrances.pdf | 26 Jul 2024 |
| Declaration about Commencement CertificateFile: Commencement Cert.pdf | 26 Jul 2024 |
| CERSAI detailsFile: Self declaration no security interest.pdf | 26 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other firm.pdf | 26 Jul 2024 |
| Proforma of Agreement for saleFile: agreement to sales.pdf | 26 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about separate Bank accounts.pdf | 26 Jul 2024 |
| Deviation Report with respect to Allotment letterFile: deviation Model copy of Allotment letter.pdf | 26 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation model copy of agreement to sales.pdf | 26 Jul 2024 |
| Declaration in FORM BFile: Stamp.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Radha_Heights_30062024.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold_Inventory_Certificate_31032024.pdf | 27 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_ 2_ Engineers Certificate 31032024.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Radha_Heights_31032024.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate Q3_merged_compressed.pdf | 6 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Radha_Heights_30092023.pdf | 30 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_KM_Developers.pdf | 16 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_KM_Developers_31032023_11zon.pdf | 10 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate.pdf | 8 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 8 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form_5_KM_Developers_31032022.pdf | 30 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate sept 22.pdf | 24 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SEPT 22.pdf | 24 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate2022.pdf | 6 Sep 2022 |
| Layout approvalFile: plan.pdf | 12 May 2021 |
| Building plan approvalFile: plan.pdf | 12 May 2021 |
| PAN CardFile: pan card firm and partner.pdf | 12 May 2021 |
| Copy of the legal title reportFile: power of attorney.pdf | 12 May 2021 |
| Details of encumbrancesFile: encumberance certificate.pdf | 12 May 2021 |
| Copy of Layout Approval (in case of layout)File: plan.pdf | 12 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan.pdf | 12 May 2021 |
| Declaration in FORM BFile: form b- km developers.pdf | 12 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 12 May 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 12 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 12 May 2021 |
| OtherFile: authorised signature.pdf | 12 May 2021 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 6 May 2021 |
| Copy of the legal title reportFile: development agreement.pdf | 6 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: construction permission.pdf | 6 May 2021 |
| Proforma of Allotment letterFile: performa allotment letter.pdf | 6 May 2021 |
| Proforma of Allotment letterFile: AGREEMENT TO SALES PERFORMA.pdf | 6 May 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GANESH PLAZA | C S NO 510A E WARD KADAM WADI TAL KARVIR DIST KOLHAPUR | 3 | Completed | Jan 2020 | Late, Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RADHA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KADAMAWADI880+ in Kolhapur
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: K M DEVELOPERS AND BUILDERS
K M DEVELOPERS AND BUILDERS has 1 registration on MahaRERA, including RADHA HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that RADHA HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RADHA HEIGHTS is delayed beyond 11 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RADHA HEIGHTS?
The registered promoter entity is K M DEVELOPERS AND BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RADHA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RADHA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RADHA HEIGHTS?
The professionals named in the filing: Architect: GAJENDRA SABALE; Engineer: AMOL SAMBHAJI JAGDALE SAMBHAJI JAGDALE; Chartered Accountant: SHANKAR VITTHAL PATIL VITTHAL PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RADHA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback