Home / Browse projects / Thane, Maharashtra / RACHANA GREEN

Registration lapsed No litigation declared Residential / Group Housing project

RACHANA GREEN

By RACHANA INFRASTRUCTURE

RG-MH-15705 · RERA P51700024382 · Last updated on MahaRERA portal: 17 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

RACHANA GREEN is a Residential / Group Housing project by RACHANA INFRASTRUCTURE in Thane, Maharashtra, registered with MahaRERA as P51700024382 on 10 Feb 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameRACHANA GREEN
  • TypeResidential / Group Housing
  • Location
    • Old Agra Road
    • Behind Shete Marriage Hall
    • Cherpoli
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • RERA no.P51700024382
  • ReraGenie IDRG-MH-15705

Builder

  • NameRACHANA INFRASTRUCTURE
  • Entity typePartnership
  • PartnersAshok Laxman Bhoir, Riitu Vijaykumar Poddar, Ananta Vishnnu Bhere, Fatema Suber Bohari Attarwala, Atul Ramesh Tupe

Key dates

10 months past promisethis monthRegisteredFeb 2020PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Feb 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings5 building records
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RACHANA GREEN- Building No 1NA50000
RACHANA GREEN- Building No 2NA280000
RACHANA GREEN - Building No 3NA50000
RACHANA GREEN- Building 4NA350000
RACHANA GREEN- Amenity plotNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 17 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

RACHANA GREEN- Building No 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RACHANA GREEN- Building No 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RACHANA GREEN - Building No 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RACHANA GREEN- Building 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RACHANA GREEN- Amenity plot91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,980 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Shantaram Vishnu BhereCherpoliThane
Ananta Vishnu BhereCherpoliThane
Sujata Sunil NichiteShahapur (CT)Thane
Pramila Prakash BhereCherpoliThane
Jagruti Prakash BhereCherpoliThane

Approvals and building plan

Permissible FSI4979.68
Proposed, not sanctioned4,980 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThakkar Building, Thakkar Compound, Shahapur, Dist-Thane 421601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKala Vastu
EngineerAtul Kudtarkar & Associates
Chartered AccountantSuber Bohari & Associates
PartnerRole in project
RACHANA INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Dec 2024

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form-4 dated 17-12-2024- Revised.pdf17 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form-4 dated 05-09-2024.pdf15 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate.pdf15 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC for the project_compressed.pdf15 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Rachana Green OC copy compressed.pdf9 Nov 2024
Layout approvalFile: Sanction Map_01_05- Layout upload.pdf9 Dec 2023
Building plan approvalFile: Sanction Map_02_05 (2)- Bldg 1 and 3 Upload.pdf9 Dec 2023
Building plan approvalFile: Sanction Map_04_05- Bldg 4 Upload.pdf9 Dec 2023
Building plan approvalFile: Sanction Map_05_05- Bldg 4 Upload.pdf9 Dec 2023
Building plan approvalFile: Sanction Map_GR_2UP- Aminity Upload.pdf9 Dec 2023
Copy of Layout Approval (in case of layout)File: Sanction Map_01_05- Layout upload.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map_02_05 (2)- Bldg 1 and 3 Upload.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map_04_05- Bldg 4 Upload.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map_05_05- Bldg 4 Upload.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map_GR_2UP- Aminity Upload.pdf9 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Dec 2023
Details of encumbrances concerned to FinanceFile: Non Encumbrance Legal.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: Non Encumbrance Legal.pdf2 Nov 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf2 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sale.pdf2 Nov 2023
Copy of the legal title reportFile: SEARCH REPORT-NEW.pdf5 Dec 2019
Copy of the legal title reportFile: TITLE REPORT-NEW.pdf5 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - NEW.pdf5 Dec 2019
OtherFile: Rachna Greens-brochure details.pdf5 Dec 2019
Layout approvalFile: PROJECT LAYOUT 1.pdf21 Nov 2019
Layout approvalFile: PROJECT LAYOUT 2.pdf21 Nov 2019
Layout approvalFile: PROJECT LAYOUT 3.pdf21 Nov 2019
Layout approvalFile: PROJECT LAYOUT 4.pdf21 Nov 2019
Layout approvalFile: PROJECT LAYOUT 5.pdf21 Nov 2019
Building plan approvalFile: NA ORDER1.pdf21 Nov 2019
PAN CardFile: PAN CARD.pdf21 Nov 2019
Copy of the legal title reportFile: TITLE REPORT.pdf21 Nov 2019
Copy of the legal title reportFile: SEARCH REPORT.pdf21 Nov 2019
Details of encumbrancesFile: DECLARATION OF NO ENCUMBRANCES.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT 1.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT 2.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT 3.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT 4.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT 5.pdf21 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER1.pdf21 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER1.pdf21 Nov 2019
Declaration in FORM BFile: Form B new.pdf21 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - ARCHITECT CERTIFICATE.pdf21 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - CA CERTIFICATE.pdf21 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure A.pdf21 Nov 2019
Proforma of Allotment letterFile: Agreement flat -As Per Rera Rachana Infrastructure.pdf21 Nov 2019
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf21 Nov 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RACHANA GREEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Behind Shete Marriage Hall7,600+ in Thane

Builder: RACHANA INFRASTRUCTURE

RACHANA INFRASTRUCTURE has 1 registration on MahaRERA, including RACHANA GREEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that RACHANA GREEN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RACHANA GREEN is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RACHANA GREEN?

The registered promoter entity is RACHANA INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RACHANA GREEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RACHANA GREEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RACHANA GREEN?

The professionals named in the filing: Architect: Kala Vastu; Engineer: Atul Kudtarkar & Associates; Chartered Accountant: Suber Bohari & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RACHANA GREEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RACHANA GREEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RACHANA GREEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.