Home / Browse projects / Nagpur, Maharashtra / RACHANA EKAA

Completed No litigation declared Residential / Group Housing project

RACHANA EKAA

By Rachana construction Co. (Nagpur) Pvt. Ltd.

RG-MH-04065 · RERA P50500034119 · Last updated on MahaRERA portal: 4 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jan 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

RACHANA EKAA is a Residential / Group Housing project by Rachana construction Co. (Nagpur) Pvt. Ltd. in Nagpur, Maharashtra, registered with MahaRERA as P50500034119 on 24 Mar 2022. The registration is recorded completed; possession was promised by 31 Jan 2025. The completion date has moved by 10 months from the original filing.

At a glance

Project

  • NameRACHANA EKAA
  • TypeResidential / Group Housing
  • Location
    • MOUZA CHINCHBHUVAN
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500034119
  • ReraGenie IDRG-MH-04065

Builder

  • NameRachana construction Co. (Nagpur) Pvt. Ltd.
  • Entity typeCompany
  • CINU45201MH2001PTC131790
  • GSTIN27AACCR1666C1ZL
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorShishir Shanakarrao Diote
  • DirectorsRonak Shishir Diote, Nilima Shishir Diote
  • Other registrations6 more →
  • Completed5 of 7
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2022First promiseMar 2024Revised toJan 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Mar 2022
  • Promised completion31 Jan 2025
  • Revised completionRevised to 31 Jan 2025 (originally 31 Mar 2024)
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RACHANA EKAANA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

RACHANA EKAA: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 4 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots199
Closed/Covered188
Open Space11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,206 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI7381.35
Proposed, not sanctioned7,381 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKAR NAGAR NAGPUR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR ULHAS MUDE
EngineerMR PRANIL KACHOLE
Chartered AccountantMR S W BHAGAT
Chartered AccountantUrja Shekhar Jain
PartnerRole in project
Rachana construction Co. (Nagpur) Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500017857Mar 2024 → Jan 2025

Reason as filed by the promoterThe Heavy Rainfall And Issue In Civil Contractorship

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2025

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archirtect Certificate EKAA March 25.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 4 Architect Completion Certificate- Ekaa March 25.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OC EKAA.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Ekaa March 2025.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Ekaa March 25.pdf4 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC EKAA.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ekaa March 25.pdf4 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer quality certificate Ekaa March 25.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA EKAA Dec 2024 final.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ekaa Dec 2024 final.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ekaa Dec 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect EKAA Dec 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA EKAA Dec 2024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: EKAA sold unsold Dec 2024.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality Ekaa Dec 2024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: EKAA sold unsold Sep 2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EKAA ARchitect Certificate September 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA EKAA Sep 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EKAA Engineer Sep 24.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A EKAA quality.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EKAA Architect Certificate June 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ekaa Form 2 Engineer Certificate June 2024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ekaa Form 2A Quality Engineer Certificate June 2024.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Ekaa Sold unsold report June 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EKAA CA CERTIFICATE June 2024.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EKAA FORM 1 MARCH 2024.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EKAA FORM 2 MARCH 2024.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form - 2A EKAA MARCH 2024.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: EKAA SOLD REPORT MARCH 2024.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EKAA FORM 3 MARCH 2024_compressed.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate ekaa.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rachana ekaa 2 (1).pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf26 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ssd exp006.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ekka Arch certificate Sept 23_compressed.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form 1 Ekaa Sept 2023.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rachana Ekka.pdf9 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EKAA FORM 2_compressed.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ekaa form 2A.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: ekaa sold.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ssd exp082_compressed.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EKAA FORM 1.pdf27 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EKAA FORM 2.pdf27 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: EKAA FORM 2 A.pdf27 Jun 2023
Disclosure of sold/ booked inventoryFile: SOLD REPOT EKAA.pdf27 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EKAA FORM 3_compressed.pdf27 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rachana Ekaa.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EKAA FORM 1 MARCH 2023.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Cert.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EKAA FORM 2A MARCH 2023 (1).pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EKAA FORM 2A MARCH 2023 (1).pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: EKAA SOLD REPORT MARCH 2023.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 EKAA.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1EKAA ARCHITECT CERTIFICATE.pdf12 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EKKA ENGINEER CERTIFICATE.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A EKAA.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOOD EKAA.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EKKA.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: EKAA SOLD UNSOLD INVNTERY.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form 1 30092022 (1).pdf17 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE EKAA.pdf17 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE EKAA_compressed.pdf17 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE EKAA.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RERA EKAA_compressed.pdf17 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form 1 30062022.pdf8 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate_compressed.pdf8 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality assurance certificat.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: disscloser ekka.pdf8 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate rachana pvt ltd_compressed.pdf8 Jul 2022
Copy of the legal title reportFile: LEGAL TITAL REPORT_compressed.pdf23 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 - rACHANAA EKAA.pdf19 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200232824278_For_Asset_Based_Search_19_03_2022_13_57_48_924.pdf19 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf19 Mar 2022
Layout approvalFile: 1 (1)_compressed_compressed.pdf17 Mar 2022
Layout approvalFile: 2_compressed_compressed.pdf17 Mar 2022
Building plan approvalFile: 3_compressed_compressed.pdf17 Mar 2022
Building plan approvalFile: 4_compressed_compressed.pdf17 Mar 2022
PAN CardFile: pan card rachana constructions co pvt ltd.pdf17 Mar 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rachana NityaRachana Nitya mouza bhamti landon street road nagpur 44002246CompletedSep 2017Jun 2017
Rachana MeghsparshRachana Meghsparsh mouza bhamti london street road Nagpur 440022146CompletedMar 2016Late, Apr 2016
Rachana Madhukosh BRachana Madhukosh Apartment Plot no 1 to 5 Patil Layout Indraprastha nagar Jaitala Road nagpur 44002224CompletedMay 2014Late, Jun 2014

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 10 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RACHANA EKAA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA CHINCHBHUVAN2,800+ in Nagpur

2 kmRACHANA EKAACompleted 41Lapsed / revoked 19Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: Rachana construction Co. (Nagpur) Pvt. Ltd.

Rachana construction Co. (Nagpur) Pvt. Ltd. has 7 registrations on MahaRERA, including Rachana 24 Carat and Rachana Sahira Wing A. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if RACHANA EKAA is delayed beyond 31 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RACHANA EKAA?

The registered promoter entity is Rachana construction Co. (Nagpur) Pvt. Ltd., a company as per the filing. Its CIN U45201MH2001PTC131790 and GSTIN 27AACCR1666C1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RACHANA EKAA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RACHANA EKAA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RACHANA EKAA?

The professionals named in the filing: Architect: MR ULHAS MUDE; Engineer: MR PRANIL KACHOLE; Chartered Accountant: MR S W BHAGAT; Chartered Accountant: Urja Shekhar Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RACHANA EKAA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RACHANA EKAA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RACHANA EKAA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.