Registered No litigation declared Plotted project

R SANDESH HINDUSTAN ESTATE

By GROWMORE VENTURES

RG-MH-64298 · RERA P50500055005 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
167 of 187Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

R SANDESH HINDUSTAN ESTATE is a Plotted project by GROWMORE VENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500055005 on 26 Feb 2024. Possession is promised by 31 Dec 2026. 20 of the 187 units on this registration are recorded sold or booked.

At a glance

Project

  • NameR SANDESH HINDUSTAN ESTATE
  • TypePlotted
  • Location
    • Kanhan (pipri)
    • Mouza Kanhan (PIPRI)
    • Parseoni
    • Nagpur
    • 441401
  • Pincode441401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055005
  • ReraGenie IDRG-MH-64298

Builder

  • NameGROWMORE VENTURES
  • Entity typePartnership
  • PartnersSumeet Sunil Agrawal, SAURABH NANDKISHOR SHARMA, DILIP PRALHADRAI AGRAWAL, ABHISHEK MANOJ VIJAYVARGI, AMAR MOHAN GURBAXANI

Key dates

this monthRegisteredFeb 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Feb 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed86 files

Current status

11%20 of 187 units booked

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes52%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes88%
Storm Water DrainsYes71%
Landscaping & Tree PlantingYes29%
Street LightingYes67%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes46%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes41%
Aggregate area of recreational Open SpaceYes76%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area41,719 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityMunicipal Council Kanhan-Pipri

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRajmahal 267, Central Avenue Road, Nagpur East 440008

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH M LAMGE
ArchitectAR KALYANI ADHAU
EngineerSANJAY BIRLA
Chartered AccountantANKIT TALREJA
Chartered AccountantUTSAV SUMIT & ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
GROWMORE VENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Nov 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-3.pdf19 Apr 2026
Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 SCANNED.pdf27 Jan 2026
Withdrawal Update Form 1File: FORM-1.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3.pdf20 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 R Sandesh Hindustan Estates_March-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_Dec-24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R Sandesh Hindustan Estate_Form-2-Engineers Certificate_Dec-24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_Dec-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_GROWMORE.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_SEP-24.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R Sandesh Hindustan Estate Form 5.pdf9 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13-1 RL of 18 Plots.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13 RL Plots 1-98 order copy NA_compressed.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13-1 RL of 18 Plots.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13 RL Plots 1-98 order copy NA_compressed.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_Sep-24.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_ sept 24.pdf10 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R Sandesh Hindustan Estate_Form-2-Engineers Certificate_JUNE-24.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A_MAR-24.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A_MAR-24.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_MAR-24.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_June-24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_June-24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GROWMORE VENTURES ENGINEER'S CERTIFICATE_0001.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R Sandesh Hindustan Estate_Form-1- Architect Certificate-JUNE-24.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_MAR-24_compressed.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 R SANDESH HINDUSTAN ESTATE 31-03-2024.pdf20 Apr 2024
Copy of the legal title reportFile: Search Report - GROW MORE VENTURES.pdf14 Feb 2024
Other - TechnicalFile: CC Mail.pdf14 Feb 2024
Building plan approval or NA orderFile: 1 Building Plan Approval _ NA Order for plotted development (48).pdf2 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (48).pdf2 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200295586270_For_Asset_Based_Search_02_02_2024_17_39_57_432.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf2 Feb 2024
Proforma of Agreement for saleFile: Agreement to Sale -GrowMore Ventures.pdf2 Feb 2024
Other - LegalFile: PARTNERSHIP DEED_compressed.pdf2 Feb 2024
Other - LegalFile: 281A sale deed_compressed-1.pdf2 Feb 2024
Other - LegalFile: 281A sale deed_compressed-2.pdf2 Feb 2024
Other - LegalFile: 281A sale deed_compressed-3.pdf2 Feb 2024
Other - LegalFile: 281B sale deed_1.pdf2 Feb 2024
Other - LegalFile: 281B sale deed_2.pdf2 Feb 2024
Other - LegalFile: 281B sale deed_3.pdf2 Feb 2024
Other - LegalFile: 281B sale deed_4.pdf2 Feb 2024
Other - LegalFile: QUALITY ANNEXURE.pdf2 Feb 2024
Other - FinanceFile: QUALITY ANNEXURE.pdf2 Feb 2024
Other - TechnicalFile: 281A sale deed_compressed-1.pdf2 Feb 2024
Other - TechnicalFile: 281A sale deed_compressed-2.pdf2 Feb 2024
Other - TechnicalFile: 281A sale deed_compressed-3.pdf2 Feb 2024
Other - TechnicalFile: 281B sale deed_1.pdf2 Feb 2024
Other - TechnicalFile: 281B sale deed_2.pdf2 Feb 2024
Other - TechnicalFile: 281B sale deed_3.pdf2 Feb 2024
Other - TechnicalFile: 281B sale deed_4.pdf2 Feb 2024
Other - TechnicalFile: QUALITY ANNEXURE.pdf2 Feb 2024
Layout approvalFile: TENTATIVE MAP.pdf1 Feb 2024
PAN CardFile: PAN GROWMORE VENTURE.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: EBCUMBRABCE FINANCE.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LEGAL.pdf1 Feb 2024
Details of encumbrances concerned to LegalFile: EBCUMBRABCE FINANCE.pdf1 Feb 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LEGAL.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: TENTATIVE MAP.pdf1 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Tentative Permission letter.pdf1 Feb 2024
Declaration about Commencement CertificateFile: form d (2) _R SANDESH HINDUSTAN ESTATE.pdf1 Feb 2024
Declaration in FORM BFile: FORM B _R SANDESH HINDUSTAN ESTATE.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST DEC_DILIP AGRAWAL.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST DEC_SUMEET AGRAWAL.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST DEC_SAURABH SHARMA.pdf1 Feb 2024

How this compares with Nagpur

11%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep R SANDESH HINDUSTAN ESTATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza Kanhan (PIPRI)2,800+ in Nagpur

Builder: GROWMORE VENTURES

GROWMORE VENTURES has 1 registration on MahaRERA, including R SANDESH HINDUSTAN ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if R SANDESH HINDUSTAN ESTATE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of R SANDESH HINDUSTAN ESTATE?

The registered promoter entity is GROWMORE VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in R SANDESH HINDUSTAN ESTATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for R SANDESH HINDUSTAN ESTATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at R SANDESH HINDUSTAN ESTATE?

The professionals named in the filing: Architect: UMESH M LAMGE; Architect: AR KALYANI ADHAU; Engineer: SANJAY BIRLA; Chartered Accountant: ANKIT TALREJA; Chartered Accountant: UTSAV SUMIT & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in R SANDESH HINDUSTAN ESTATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About R SANDESH HINDUSTAN ESTATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save R SANDESH HINDUSTAN ESTATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.