Home / Browse projects / Nagpur, Maharashtra / R SANDESH HINDUSTAN ESTATE
R SANDESH HINDUSTAN ESTATE
RG-MH-64298 · RERA P50500055005 · Last updated on MahaRERA portal: 19 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
R SANDESH HINDUSTAN ESTATE is a Plotted project by GROWMORE VENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500055005 on 26 Feb 2024. Possession is promised by 31 Dec 2026. 20 of the 187 units on this registration are recorded sold or booked.
At a glance
Project
- NameR SANDESH HINDUSTAN ESTATE
- TypePlotted
- Location
- Kanhan (pipri)
- Mouza Kanhan (PIPRI)
- Parseoni
- Nagpur
- 441401
- Pincode441401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500055005
- ReraGenie IDRG-MH-64298
Builder
- NameGROWMORE VENTURES
- Entity typePartnership
- PartnersSumeet Sunil Agrawal, SAURABH NANDKISHOR SHARMA, DILIP PRALHADRAI AGRAWAL, ABHISHEK MANOJ VIJAYVARGI, AMAR MOHAN GURBAXANI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Feb 2024
- Promised completion31 Dec 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed86 files
Current status
Figures as on 19 Apr 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 52% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 88% |
| Storm Water Drains | Yes | 71% |
| Landscaping & Tree Planting | Yes | 29% |
| Street Lighting | Yes | 67% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 46% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 41% |
| Aggregate area of recreational Open Space | Yes | 76% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH M LAMGE |
| Architect | AR KALYANI ADHAU |
| Engineer | SANJAY BIRLA |
| Chartered Accountant | ANKIT TALREJA |
| Chartered Accountant | UTSAV SUMIT & ASSOCIATES |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GROWMORE VENTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Nov 2024
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 19 Apr 2026 |
| Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 SCANNED.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM-3.pdf | 20 Jan 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 R Sandesh Hindustan Estates_March-2025.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_Dec-24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R Sandesh Hindustan Estate_Form-2-Engineers Certificate_Dec-24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_Dec-24.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_GROWMORE.pdf | 6 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_SEP-24.pdf | 17 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R Sandesh Hindustan Estate Form 5.pdf | 9 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13-1 RL of 18 Plots.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13 RL Plots 1-98 order copy NA_compressed.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13-1 RL of 18 Plots.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13 RL Plots 1-98 order copy NA_compressed.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_Sep-24.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_ sept 24.pdf | 10 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R Sandesh Hindustan Estate_Form-2-Engineers Certificate_JUNE-24.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A_MAR-24.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A_MAR-24.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_MAR-24.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_June-24.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_June-24.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GROWMORE VENTURES ENGINEER'S CERTIFICATE_0001.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R Sandesh Hindustan Estate_Form-1- Architect Certificate-JUNE-24.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE R SANDESH HINDUSTAN ESTATE_MAR-24_compressed.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 R SANDESH HINDUSTAN ESTATE 31-03-2024.pdf | 20 Apr 2024 |
| Copy of the legal title reportFile: Search Report - GROW MORE VENTURES.pdf | 14 Feb 2024 |
| Other - TechnicalFile: CC Mail.pdf | 14 Feb 2024 |
| Building plan approval or NA orderFile: 1 Building Plan Approval _ NA Order for plotted development (48).pdf | 2 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (48).pdf | 2 Feb 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200295586270_For_Asset_Based_Search_02_02_2024_17_39_57_432.pdf | 2 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 2 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement to Sale -GrowMore Ventures.pdf | 2 Feb 2024 |
| Other - LegalFile: PARTNERSHIP DEED_compressed.pdf | 2 Feb 2024 |
| Other - LegalFile: 281A sale deed_compressed-1.pdf | 2 Feb 2024 |
| Other - LegalFile: 281A sale deed_compressed-2.pdf | 2 Feb 2024 |
| Other - LegalFile: 281A sale deed_compressed-3.pdf | 2 Feb 2024 |
| Other - LegalFile: 281B sale deed_1.pdf | 2 Feb 2024 |
| Other - LegalFile: 281B sale deed_2.pdf | 2 Feb 2024 |
| Other - LegalFile: 281B sale deed_3.pdf | 2 Feb 2024 |
| Other - LegalFile: 281B sale deed_4.pdf | 2 Feb 2024 |
| Other - LegalFile: QUALITY ANNEXURE.pdf | 2 Feb 2024 |
| Other - FinanceFile: QUALITY ANNEXURE.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281A sale deed_compressed-1.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281A sale deed_compressed-2.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281A sale deed_compressed-3.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281B sale deed_1.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281B sale deed_2.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281B sale deed_3.pdf | 2 Feb 2024 |
| Other - TechnicalFile: 281B sale deed_4.pdf | 2 Feb 2024 |
| Other - TechnicalFile: QUALITY ANNEXURE.pdf | 2 Feb 2024 |
| Layout approvalFile: TENTATIVE MAP.pdf | 1 Feb 2024 |
| PAN CardFile: PAN GROWMORE VENTURE.pdf | 1 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: EBCUMBRABCE FINANCE.pdf | 1 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LEGAL.pdf | 1 Feb 2024 |
| Details of encumbrances concerned to LegalFile: EBCUMBRABCE FINANCE.pdf | 1 Feb 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE LEGAL.pdf | 1 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: TENTATIVE MAP.pdf | 1 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Tentative Permission letter.pdf | 1 Feb 2024 |
| Declaration about Commencement CertificateFile: form d (2) _R SANDESH HINDUSTAN ESTATE.pdf | 1 Feb 2024 |
| Declaration in FORM BFile: FORM B _R SANDESH HINDUSTAN ESTATE.pdf | 1 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST DEC_DILIP AGRAWAL.pdf | 1 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST DEC_SUMEET AGRAWAL.pdf | 1 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST DEC_SAURABH SHARMA.pdf | 1 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep R SANDESH HINDUSTAN ESTATE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mouza Kanhan (PIPRI)2,800+ in Nagpur
DEV RESIDENCY
SHREE TAJ CONSTRUCTION, MATOSHREE PRABHA B
Bhartia Meadows
BHARTIA MEADOWS
GALAXY PARK
SHAKTI BUILDERS AND DEVELOPERS
Chatterjee Layout- Ranala
Arunabh Santoshkumar Chatterjee
SHIVTHIRTH NAGAR 3
ASHISH KALODE & OTHERS
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
See every Nagpur project, with the district possession charts
Builder: GROWMORE VENTURES
GROWMORE VENTURES has 1 registration on MahaRERA, including R SANDESH HINDUSTAN ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if R SANDESH HINDUSTAN ESTATE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of R SANDESH HINDUSTAN ESTATE?
The registered promoter entity is GROWMORE VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in R SANDESH HINDUSTAN ESTATE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for R SANDESH HINDUSTAN ESTATE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at R SANDESH HINDUSTAN ESTATE?
The professionals named in the filing: Architect: UMESH M LAMGE; Architect: AR KALYANI ADHAU; Engineer: SANJAY BIRLA; Chartered Accountant: ANKIT TALREJA; Chartered Accountant: UTSAV SUMIT & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in R SANDESH HINDUSTAN ESTATE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback