R M Dhariwal Greens Yavatmal Phase 1
By Dhariwal And Chhoriya Developers LLP
RG-MH-00366 · RERA P51000009219 · Last updated on MahaRERA portal: 16 Feb 2023
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Yavatmal registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
R M Dhariwal Greens Yavatmal Phase 1 is a Residential / Group Housing project by Dhariwal And Chhoriya Developers LLP in Yavatmal, Maharashtra, registered with MahaRERA as P51000009219 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameR M Dhariwal Greens Yavatmal Phase 1
- TypeResidential / Group Housing
- Location
- Dhamangaon Road Bye - Pass
- Yavatmal
- Yavatmal (M Cl)
- 445001
- Pincode445001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51000009219
- ReraGenie IDRG-MH-00366
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion30 Dec 2021
- Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
- Buildings48 building records
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PB -2 | NA | 2 | 0 | 0 | 0 | 0 |
| PB -3 | NA | 2 | 0 | 0 | 0 | 0 |
| PB -4 | NA | 2 | 0 | 0 | 0 | 0 |
| PB - 5 | NA | 2 | 0 | 0 | 0 | 0 |
| LV - 6 | NA | 2 | 0 | 0 | 0 | 0 |
| LV - 7 | NA | 2 | 0 | 0 | 0 | 0 |
| LV - 8 | NA | 2 | 0 | 0 | 0 | 0 |
| LV - 9 | NA | 2 | 0 | 0 | 0 | 0 |
| R H No - 10 to 14 | NA | 2 | 0 | 0 | 0 | 0 |
| RH No - 15 To 20 | NA | 2 | 0 | 0 | 0 | 0 |
| R H 21 To 26 | NA | 2 | 0 | 0 | 0 | 0 |
| R H No - 27 To 31 | NA | 2 | 0 | 0 | 0 | 0 |
| R H No - 43 To 48 | NA | 2 | 0 | 0 | 0 | 0 |
| R H No - 49 To 53 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 65 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 66 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 67 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 68 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 69 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 70 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 71 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 72 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 73 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 74 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 75 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 76 | NA | 2 | 0 | 0 | 0 | 0 |
| R H No - 77 To 82 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 118 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 119 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 120 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 121 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 122 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 123 | NA | 2 | 0 | 0 | 0 | 0 |
| P B -124 | NA | 2 | 0 | 0 | 0 | 0 |
| PB - 125 | NA | 2 | 0 | 0 | 0 | 0 |
| P B - 126 | NA | 2 | 0 | 0 | 0 | 0 |
| P B - 127 | NA | 2 | 0 | 0 | 0 | 0 |
| P B - 128 | NA | 2 | 0 | 0 | 0 | 0 |
| P B - 129 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 153 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 154 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 155 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 156 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 157 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 158 | NA | 2 | 0 | 0 | 0 | 0 |
| L V - 159 | NA | 2 | 0 | 0 | 0 | 0 |
| Central Building | NA | 3 | 0 | 0 | 0 | 0 |
| PB1 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 16 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 48 buildings; the table lists the first 20.
400 of 528 construction stages are filed complete across 48 buildings. The stage furthest along is Slabs of Super Structure, at 50%.
PB -273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PB -382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PB -433%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PB - 573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LV - 682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LV - 782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LV - 882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LV - 982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
R H No - 10 to 1482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
RH No - 15 To 2082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
R H 21 To 2682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
R H No - 27 To 3182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
R H No - 43 To 4882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
R H No - 49 To 5382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L V - 6582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L V - 6682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L V - 6782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L V - 6882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L V - 6982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
L V - 7082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 16 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| CCTV Camera For Layout Security | Yes | 100% |
| Ent Gate and Compound Wall | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Kunal P Patil |
| Architect | ANAND JAIN & ASSOCIATES |
| Engineer | RAKESH JAIN & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Dhariwal And Chhoriya Developers LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNote for State of development work - a) Proposed infrastructure in this proposed Phase-1 like Concrete Road, Drainage, STP, water line, Transformer and street light, Entrance gate, Compound wall, Security cabin, Garden and landscaping, Children Play Park, Vermiculture Pit, Rainwater harvesting, Solid Waste Management System etc are completed and amenities like Yoga hall, Garden-2 are almost 85%+ completed and work in progress. Only amenities like CCTV surveillance system, EPbex telephone system, Cricket Pitch, Skating Ring, Basket Ball Court are in progress and shall be completed soon. b) Out
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Rev4715/Case No5/J-9/Case No 102-10-/2015/2015 | Principal Secretary Executive Officer Revenue And Forest Department Mantralay Mumbai | Case Dismissed with Cost dated thirteenth June two thousand seventeen |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC002000000010047 | Rajesh Janraoji Khadse | Dhariwal and Chhoriya Developers LLP | 03/05/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Feb 2023
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 R M Dhariwal Greens Yavatmal Phase 1.pdf | 16 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 R M Dhariwal Greens Yavatmal Phase 1.pdf | 16 Feb 2023 |
| OtherFile: Yavatmal Aminities Completed RERA Upload_11zon.pdf | 5 Sep 2022 |
| CERSAI detailsFile: CERSAI YAVATMAL PH-1.pdf | 13 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Yavatmal phase 1 Ca certificate(3)_compressed.pdf | 21 Mar 2022 |
| Certificates of CA (Form 3)File: Yavatmal phase 1 Ca certificate(3)_compressed.pdf | 21 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Yavatmal phase 1 Jan 22_compressed.pdf | 19 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: YAVATMAL PHASE 1 FORM I ARC CERTIFICATE.pdf | 8 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: YAVATMAL PHASE 1 FORM 2 ENG CERTIFICATE.pdf | 8 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Yavatmal Phase 1 sold unsold sep 2021.pdf | 31 Dec 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Yavatmal phase 1 CA certificate.pdf | 31 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 YAVATMAL PHASE 1 2018.pdf | 27 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 YAVATMAL PHASE 1 2019.pdf | 27 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate Up To June - 19 (Part - 1).pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate Up To June - 19 (Part - 2).pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Yavatmal Archi certi_ Part 2 Sep - 19.pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Yavatmal Archi certi_part 1 Sep - 19.pdf | 21 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Up To June - 19 1.pdf | 21 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Yavatmal engineer certi.pdf | 21 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance June - 19.pdf | 21 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certi Yavatmal Ph - 1.pdf | 21 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate -Sep - 19.pdf | 21 Jan 2020 |
| Certificates of CA (Form 3)File: CA Certificate Up To June - 19.pdf | 21 Jan 2020 |
| Certificates of CA (Form 3)File: Yavatmal CA certificate.pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase -1 Up To Dec -18 Part - 1.pdf | 23 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase -1 Up To Dec -18 Part - 2.pdf | 23 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Up March - 19 Part - 1.pdf | 23 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Up March - 19 Part - 2.pdf | 23 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certi yavatmal ph 1 Up to Dec - 18.pdf | 23 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi Yavatmal Ph - 1.pdf | 23 Aug 2019 |
| Certificates of CA (Form 3)File: Ca Certi yavatmal ph 1 Up to Dec - 18.pdf | 23 Aug 2019 |
| Certificates of CA (Form 3)File: Ca Certificate Up March - 19.pdf | 23 Aug 2019 |
| Certificates of CA (Form 5)File: Yavatmal Phase 1 - Form -5.pdf | 19 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Yavatmal Ph 1 up To Sep - 18.pdf | 11 Jan 2019 |
| Certificates of CA (Form 3)File: Ca certificate Yavatmal Ph 1 up To Jun - 18.pdf | 11 Jan 2019 |
| Certificates of CA (Form 3)File: Ca certificate Yavatmal Ph 1 up To Sep - 18.pdf | 11 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Yavatmal Phase - 1 Up To Dec - 2018.pdf | 5 Jul 2018 |
| Certificates of CA (Form 3)File: CA Cer Yavatmal Phase - 1 Up To Dec - 2018.pdf | 5 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cer Yavatmal Phase - 1 Up To Dec - 2017 (1).pdf | 25 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cer Yavatmal Phase - 1 Up To Dec - 2017 (2).pdf | 25 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Yavatmal Phase - 2 Up To Dec - 2017.pdf | 25 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Yavatmal Phase - 1 Up To Dec - 2017.pdf | 25 Jun 2018 |
| Certificates of CA (Form 3)File: CA Cer Yavatmal Phase - 1 Up To Dec - 2017.pdf | 23 Jun 2018 |
| Building plan approvalFile: Layout Phase - 3 Updated Changes 1.pdf | 3 Apr 2018 |
| Building Plan Approval (IOD)File: Layout Phase - 3 Updated Changes 1.pdf | 3 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Camensment Phase - 3.pdf | 3 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: yavatmal -NA order.pdf | 27 Mar 2018 |
| Layout approvalFile: Yavatmal Phase Wise layout - date- 1-7-17-Model.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Yavatmal Phase Wise layout - date- 1-7-17-Model.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Yevatmal Phase 1 1.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Yevatmal Phase 1 2.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Yevatmal Phase 1 3.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Yevatmal Phase 1 4.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Yevatmal Phase 1 5.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Yevatmal Phase 1.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: Ca Yevatmal Phase - 1.pdf | 30 Jul 2017 |
| Layout approvalFile: YAWATMAL Dem.pdf | 22 Jul 2017 |
| Building plan approvalFile: LAYOUT PLAN PLOT NO 1 SHEET NO 1.pdf | 22 Jul 2017 |
| Building plan approvalFile: P B L V R H MD PLOT NO 1 SHEET NO 2.pdf | 22 Jul 2017 |
| Building plan approvalFile: CENTER CLUB HOUSE PLOT NO 1 SHEET NO 3.pdf | 22 Jul 2017 |
| PAN CardFile: D and C LLP Pan Card.pdf | 22 Jul 2017 |
| Copy of the legal title reportFile: Yewatmal Ploted Search Report.pdf | 22 Jul 2017 |
| Details of encumbrancesFile: Yewatmal Encumbrance Certificate.pdf | 22 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: YAWATMAL Dem.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: LAYOUT PLAN PLOT NO 1 SHEET NO 1.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: P B L V R H MD PLOT NO 1 SHEET NO 2.pdf | 22 Jul 2017 |
| Building Plan Approval (IOD)File: CENTER CLUB HOUSE PLOT NO 1 SHEET NO 3.pdf | 22 Jul 2017 |
| Declaration in FORM BFile: yevatmal p1 Declerartion Form - B.pdf | 22 Jul 2017 |
| Proforma of Allotment letterFile: ATS and Allotment Yawatmal.pdf | 22 Jul 2017 |
| OtherFile: yavatmal -NA order.pdf | 22 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| R M Dhariwal Township Tembhurni Plotting | Post - Tembhurni Tal - madha Dist - solapur | 193 | Completed | Dec 2019 | Dec 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Yavatmal
Computed across the 67 Yavatmal projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep R M Dhariwal Greens Yavatmal Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Yavatmal67 in Yavatmal
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
dwarka city
M/s 3 M INFRA
Ishwar Nagar
Deepak Mandokar And Mahesh Batra
NEW MATA NAGAR
Mahesh K. Batra & 1 Other
R M Dhariwal Greens Yavatmal Phase 4 - Oakwood
Dhariwal And Chhoriya Developers LLP
GOKULDHAM GREENS
Swastik Infra
LOK8 GRANDEUR
LOK8 INFRA PRIVATE LIMITED
See every Yavatmal project, with the district possession charts
Builder: Dhariwal And Chhoriya Developers LLP
Dhariwal And Chhoriya Developers LLP has 11 registrations on MahaRERA, including R M Dhariwal Greens Yavatmal Phase 1 and R M Dhariwal Greens Yavatmal Phase - 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Yavatmal district page.
Frequently asked questions
What are my rights if R M Dhariwal Greens Yavatmal Phase 1 is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of R M Dhariwal Greens Yavatmal Phase 1?
The registered promoter entity is Dhariwal And Chhoriya Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in R M Dhariwal Greens Yavatmal Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against R M Dhariwal Greens Yavatmal Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for R M Dhariwal Greens Yavatmal Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at R M Dhariwal Greens Yavatmal Phase 1?
The professionals named in the filing: Architect: Mr Kunal P Patil; Architect: ANAND JAIN & ASSOCIATES; Engineer: RAKESH JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in R M Dhariwal Greens Yavatmal Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.