R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency
By Dhariwal And Chhoriya Developers LLP
RG-MH-02079 · RERA P51000024031 · Last updated on MahaRERA portal: 17 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Yavatmal registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency is a Plotted project by Dhariwal And Chhoriya Developers LLP in Yavatmal, Maharashtra, registered with MahaRERA as P51000024031 on 16 Jan 2020. Possession is promised by 30 Dec 2029. 26 of the 59 units on this registration are recorded sold or booked.
At a glance
Project
- NameR M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency
- TypePlotted
- Location
- Dhamangaon Bye pass Road
- Yavatmal
- Yavatmal (M Cl)
- 445001
- Pincode445001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51000024031
- ReraGenie IDRG-MH-02079
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Jan 2020
- Promised completion30 Dec 2029
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed94 files
Current status
Figures as on 17 Mar 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities17
As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Ent Gate and Compound Wall | Yes | 100% |
| CCTV Camera for layout Security | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 53.84 lakh | Rs 48.40 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Kunal P Patil |
| Engineer | IMPower Projects - Mr Manish Pande |
| Engineer | Avinash Wadgaonkar |
| Chartered Accountant | Ayush S. Kankariya |
| Partner | Role in project |
|---|---|
| Dhariwal And Chhoriya Developers LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Dec 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2029
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Yawatmal Phase 4 Form 1 Dec 2025.pdf | 17 Mar 2026 |
| Form 2File: Yawatmal Phase 4 Form 2 Dec 2025.pdf | 17 Mar 2026 |
| Form 3File: Yawatmal Phase 4 Form 3 Dec 2025.pdf | 17 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Yawatmal P4 Sold-Unsold Dec 2025.pdf | 17 Mar 2026 |
| Form 1File: Yawatmal Phase 4 Form 1 Sept 2025.pdf | 17 Jan 2026 |
| Form 2File: Yawatmal Phase 4 Form 2 Sept 2025.pdf | 17 Jan 2026 |
| Form 3File: Yawatmal Phase 4 Form 3 Sept 2025.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Yavatmal Ph-4.pdf | 17 Jan 2026 |
| Form 1File: Yawatmal P4 Form 1 June 25.pdf | 28 Aug 2025 |
| Form 2File: Yawatmal P4 Form 2 June 25.pdf | 28 Aug 2025 |
| Form 3File: Yawatmal P4 Form 3 June 25.pdf | 28 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Yawatmal Phase 4 Sold & Unsold June 2025.pdf | 28 Aug 2025 |
| Form 1File: Yavatmal P4 Form 1 March 2025.pdf | 25 Jun 2025 |
| Form 2File: Yavatmal P4 Form 2 March 2025.pdf | 25 Jun 2025 |
| Form 3File: Yawatmal P4 Form 3 March 2025.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Yawatmal P4 Sold & Unsold.pdf | 25 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yawatmal Phase 4 Form 3 Dec 2024.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yawatmal Phase 4 Form 1 Dec 2024.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yawatmal Phase 4 Form 2 Dec 2024.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dhariwal Yavtamal P4 Sept24.pdf | 26 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dhariwal Yavtamal P4 Sept24.pdf | 26 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Dhariwal Yavtamal P4 Sept24.pdf | 26 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dhariwal Yavatmal P4 June24.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Dhariwal Yavatmal P4 June24.pdf | 12 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dhariwal Yavatmal P4 June24.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dhariwal Greens Yavatmal P4 March24.pdf | 5 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Dhariwal Greens Yavatmal P4 March24.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Dhariwal Greens Yavatmal P4 March24.pdf | 5 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F5 CA Yawatmal (P-4) 20-21.pdf | 5 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: F5 CA Yawatmal (P-4) 22-23.pdf | 5 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F5 CA Yawatmal (P-4) 21-22.pdf | 5 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F5 CA Yawatmal (P-4) 23-24.pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Yavatmal Phase 4.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Dhariwal Green P4 Dec23 Oakwood residency.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Dhariwal Greens P4 Dec23 Oakwood residency.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Yavatmal Phase 4.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA yavatmal P3 Dec23_compressed.pdf | 14 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dhariwal Greens Phase 4 Sep23.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Dhariwal Greens Phase 4 Sep23.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yavtmal P4 sept23.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dhariwal Greens Phase 4 Sep23.pdf | 23 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Dhariwal Greens Phase 4 Sep23.pdf | 23 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yawatmal P2 March 2023.pdf | 16 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Oakwood P4 march 2023.pdf | 16 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Oakwood P4 march 2023.pdf | 16 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Oakwood P4 march 2023.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Yavatmal P4 June23.pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Oakwood P4 March 2023.pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yawatmal P4 ER June2023.pdf | 21 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yawatmal phase 4 Dec2022_compressed.pdf | 21 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Yavatmal Phase 4.pdf | 1 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Yavatmal Phase 4.pdf | 1 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Er 2A Yavatmal P4 21-22.pdf | 31 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Er 2A Yavatmal P4 22-23.pdf | 31 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 4 Architect's certificate.pdf | 23 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 4 Engineer's certificate.pdf | 23 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yawatmal phase 4.pdf | 23 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar yavatmal p4 site.pdf | 30 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er yavatmal phase 4.pdf | 30 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA yavatmal p4_11zon.pdf | 30 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Yavatmal Phase 4.pdf | 28 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yavatmal P4_11zon.pdf | 28 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Yavatamal Phase 4.pdf | 27 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar yavatmal p4.pdf | 23 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: er Yavatmal p4.pdf | 23 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Cert R M Dhariwal phase 4 oakwood residency.pdf | 6 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cert R M Dhariwal greens phase 4 oakwood residency.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert R M Dhariwal greens yavatmal phase 4 oakwood Residency.pdf | 6 Jul 2022 |
| CERSAI detailsFile: CERSAI YAVATMAL PH-4.pdf | 13 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 yavatmal phase 4 jan 22.pdf | 1 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 YAVATMALphase 4 jan 22.pdf | 1 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yavatmal p4 ca certificate_compressed.pdf | 1 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YAVATMAL PH 4.pdf | 9 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YAVATMAL PH 4.pdf | 9 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: YAVATMAL PHASE 4.pdf | 22 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA YAVATMAL PHASE 4_compressed.pdf | 30 Dec 2021 |
| Declaration about Commencement CertificateFile: YAVATMAL PH 4 DECLARARTION.pdf | 22 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 YAVATMAL PHASE 4 2019.pdf | 27 Oct 2021 |
| Declaration in FORM BFile: Form B Yavatmal phase - 4.pdf | 23 Dec 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PHASE -4.pdf | 23 Dec 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| R M Dhariwal Township Tembhurni Plotting | Post - Tembhurni Tal - madha Dist - solapur | 193 | Completed | Dec 2019 | Dec 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Yavatmal
Computed across the 67 Yavatmal projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep R M Dhariwal Greens Yavatmal Phase 4 - Oakwo on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Yavatmal67 in Yavatmal
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
dwarka city
M/s 3 M INFRA
Ishwar Nagar
Deepak Mandokar And Mahesh Batra
NEW MATA NAGAR
Mahesh K. Batra & 1 Other
GOKULDHAM GREENS
Swastik Infra
LOK8 GRANDEUR
LOK8 INFRA PRIVATE LIMITED
GOLD SUKH
RADHAY INFRA
See every Yavatmal project, with the district possession charts
Builder: Dhariwal And Chhoriya Developers LLP
Dhariwal And Chhoriya Developers LLP has 11 registrations on MahaRERA, including R M Dhariwal Greens Yavatmal Phase 1 and R M Dhariwal Greens Yavatmal Phase - 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Yavatmal district page.
Frequently asked questions
What are my rights if R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency is delayed beyond 30 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency?
The registered promoter entity is Dhariwal And Chhoriya Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency?
The professionals named in the filing: Architect: Mr Kunal P Patil; Engineer: IMPower Projects - Mr Manish Pande; Engineer: Avinash Wadgaonkar; Chartered Accountant: Ayush S. Kankariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in R M Dhariwal Greens Yavatmal Phase 4 - Oakwood Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.