Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Yavatmal registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 9Construction stages donefurthest along: Slabs of Super Structure, 44%
42 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 9 documents Report an error

GOKULDHAM GREENS is a Residential / Group Housing project by Swastik Infra in Yavatmal, Maharashtra, registered with MahaRERA as PR1360002501794 on 15 Dec 2025. Possession is promised by 31 Dec 2028. 0 of the 42 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.

At a glance

Project

  • NameGOKULDHAM GREENS
  • TypeResidential / Group Housing
  • Location
    • Plot No. 35
    • Survey No. 1/1
    • Sheet No. 45A
    • Mouza - Yavatmal
    • Tq. - Distt. - Yavatmal
    • Yavatmal
    • Yavatmal (M Cl)
    • 445001
  • Pincode445001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1360002501794
  • ReraGenie IDRG-MH-54497

Builder

  • NameSwastik Infra
  • Entity typePartnership
  • GSTIN27AFNFS5276C1ZN
  • PartnerAmol Ashokrao Yerawar
  • PartnersVijay Meghraj Mundhada, Ramkumar Rameshchandra Jaju
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed9 files

Current status

0%0 of 42 units booked
30.0%Work done, per cost certificate

Figures as on 14 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Flat Scheme Plot no. 35NA8742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 44%.

Flat Scheme Plot no. 35: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure44%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks44%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered87

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,980 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Nov 2025

Approvals and building plan

Sanctioning authorityYavatmal Municipal Corporation
Permissible FSI10816.46
Proposed, not sanctioned8,012 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDATT CHOWKTILAK WADI YAVATMAL
Estimated costRs 13.50 cr
Cost incurredRs 4.05 cr
Work done30.04%
BuildingWingEstimatedIncurred
Flat Scheme Plot no. 35NARs 13.50 crRs 4.05 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Satpute
EngineerDipakkumar Raut
Chartered AccountantAkhil Darda & Co.
PartnerRole in project
Swastik Infra-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Nov 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed9

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 001 Form No 01 Gokuldham Greens March 2026.pdf14 May 2026
Withdrawal Update Form 2File: 002 Form No 02 Gokuldham Greens March 2026.pdf14 May 2026
Withdrawal Update Form 3File: 003 Form No 03 Gokuldham Greens March 2026.pdf14 May 2026
Form 2A (FY 2025-2026)File: 004 Form No 2A Gokuldham Greens March 2026.pdf14 May 2026
Withdrawal Update Form 1File: Form No 01 Gokuldham Greens Dec 2025.pdf26 Feb 2026
Withdrawal Update Form 2File: Form No 02 Gokuldham Greens Dec 2025.pdf26 Feb 2026
Withdrawal Update Form 3File: Form No 03 Gokuldham Greens Dec 2025.pdf26 Feb 2026
Declaration and undertaking (Annexure A)File: Order 50.pdf8 Nov 2025
Building plan approvalFile: Building Sanction Plan Plot No 35.pdf8 Nov 2025

How this compares with Yavatmal

0%of this project is bookeddistrict median 0%
11%of Yavatmal projects moved their completion datethis one has not
32%of Yavatmal registrations have lapsed or been cancelledthis one is on the register

Computed across the 67 Yavatmal projects on ReraGenie, from their own filings.

Keep GOKULDHAM GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yavatmal67 in Yavatmal

2 kmGOKULDHAM GREENSCompleted 2Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: Swastik Infra

SWASTIK INFRA has 8 registrations on MahaRERA, including SWASTIK MANAS and SWASTIK IRIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Yavatmal district page.

Frequently asked questions

What are my rights if GOKULDHAM GREENS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKULDHAM GREENS?

The registered promoter entity is Swastik Infra, a partnership as per the filing. Its GSTIN 27AFNFS5276C1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKULDHAM GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKULDHAM GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKULDHAM GREENS?

The professionals named in the filing: Architect: Prashant Satpute; Engineer: Dipakkumar Raut; Chartered Accountant: Akhil Darda & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULDHAM GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULDHAM GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULDHAM GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.