Home / Browse projects / Pune, Maharashtra / R 47 -HIGHGARDENS

Registered No litigation declared Residential / Group Housing project

R 47 -HIGHGARDENS

By PARANJAPE SPACES AND SERVICES PVT LTD

RG-MH-64605 · RERA P52100053310 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 45%
110 of 213Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

R 47 -HIGHGARDENS is a Residential / Group Housing project by PARANJAPE SPACES AND SERVICES PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100053310 on 27 Oct 2023. Possession is promised by 31 Jul 2028. 103 of the 213 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameR 47 -HIGHGARDENS
  • TypeResidential / Group Housing
  • Location
    • Sector R-47
    • Forest Trail Township
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053310
  • ReraGenie IDRG-MH-64605

Builder

  • NamePARANJAPE SPACES AND SERVICES PVT LTD
  • Entity typeCompany
  • DirectorsSACHIN BHALCHANDRA HIRAP, Pushkar Pramod Apte, Uttam Sambhaji Redkar
  • Other registrations3 more →

Key dates

this monthRegisteredOct 2023PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

48%103 of 213 units booked
15.4%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Wing and B WingNA22222130213

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 45%.

A Wing and B Wing: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)45%
Podiums (if any)0%
Plinth45%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed538

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots538
Closed/Covered220
Open Space318

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,235 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority
Permissible FSI45456.9
Proposed, not sanctioned21,457 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaukik Apartments Ground Floor, Plot No 3, CTS No 870 Bhandarkar Road Pune-411004
Estimated costRs 114.87 cr
Cost incurredRs 17.65 cr
Work done15.37%
BuildingWingEstimatedIncurred
A Wing and B WingNARs 96.80 crRs 14.62 cr
-NARs 18.07 crRs 3.04 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP HARDIKAR & ASSOCIATES
EngineerDeepali Desai
EngineerSACHIN GITE
Chartered AccountantKapure & Kapure
PartnerRole in project
PARANJAPE SPACES AND SERVICES PVT LTD-

Litigation declared3

CaseCourtStatus
1480/2011Civil Judge Senior Division PuneMatter is kept for examination in chief
593/2018Civil Judge Senior Division PuneApplicant has taken steps for issue of Summons Report awaited
1120/2022Civil Judge Senior Division PuneMatter is kept for hearing Awaiting summons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-R47 June 25.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1-R47 Sept 25.pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1-R47 Dec 25.pdf29 Jun 2026
Withdrawal Update Form 2File: FORM 2 R47 HIGH GARDENS JUNE 25.pdf29 Jun 2026
Withdrawal Update Form 2File: Form 2 Sept 25 R47.pdf29 Jun 2026
Withdrawal Update Form 2File: Form 2-R47 Dec 25.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 R47 June25_compressed.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 R47 Sept 25_compressed.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 R47 Dec 25_compressed.pdf29 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-R-47Highgardens-Mar'25 uploaded.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2 R47 Highgardens March25 sign off-uploaded.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R-47 HIghgardens.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-R-47-Highgardens-June '24-uploded.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera form2 R47 Highgardens DEC 24 Signoff-compressed-uploaded.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-R-47 Highgardens-Dec'24-uplaoded.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-R-47-Highgardens-Sept'24-uploaded.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R47 Certificate M24-uploaded.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Forest Trails R-47-Sept'24-uploaded.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory-R47Highgardens-June'24-uploaded.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18 Form 2-R47-HG-June'24-uploaded.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 R47 Highgardens-FORM 1-June'24-uploaded.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 9 R-47-FORM 2A-June'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Report-Highgardens R47-Mar'24-uploaded.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-R47 Highgardens-Mar'24-uploaded.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 -R47 HIGHGARDENS-Mar'24-uploaded.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-R-47 Highgardens-Mar'24-uploaded.pdf1 Apr 2024
Copy of the legal title reportFile: R-47 Suppl Legal Title Report dated 23Feb2024.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrances Letter-Dues-R47 Highgardens-Feb'24.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrances Letter-Dues-R47 Highgardens-Feb'24.pdf23 Feb 2024
Proforma of Agreement for saleFile: 2 2 AFS-R47 Highgarden-Revised -PSSPL-Amit P-12Feb2024.pdf19 Feb 2024
Proforma of Agreement for saleFile: AFS-R47 Highgardens-02Feb24.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-R47 Highlands-Dec'23-uploaded.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- R47 Highgardens-uploaded.pdf12 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A-R47Highgardens-Dec'23-uploaded.pdf12 Jan 2024
Other - LegalFile: Declaration for -R47 Highgardens.pdf16 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- R 47.pdf11 Oct 2023
Other - LegalFile: 1 Other - Technical (2).pdf16 Sep 2023
Other - LegalFile: Land Ownership Declaration- R47- Final.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (11).pdf5 Sep 2023
Layout approvalFile: scan131.pdf4 Sep 2023
Building plan approvalFile: scan131.pdf4 Sep 2023
Building plan approvalFile: scan132.pdf4 Sep 2023
Building plan approvalFile: scan133.pdf4 Sep 2023
Building plan approvalFile: scan134.pdf4 Sep 2023
Building plan approvalFile: scan135.pdf4 Sep 2023
Building plan approvalFile: scan136.pdf4 Sep 2023
Building plan approvalFile: scan137.pdf4 Sep 2023
Copy of Layout Approval (in case of layout)File: scan131.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan131.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan132.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan133.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan134.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan135.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan136.pdf4 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: scan137.pdf4 Sep 2023
Other - LegalFile: Sale Deed Final-compressed.pdf4 Sep 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (13).pdf29 Aug 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (9).pdf29 Aug 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (4).pdf29 Aug 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (10)_11zon_11zon.pdf29 Aug 2023
Other - LegalFile: Declaration on landownership for Commencement.pdf26 Aug 2023
Other - TechnicalFile: Declaration for Survey No.pdf26 Aug 2023
PAN CardFile: 1 PAN Card (5).pdf25 Aug 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (4).pdf25 Aug 2023
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf25 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER Litigations.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER Litigations.pdf25 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Aug 2023
Declaration about Commencement CertificateFile: FORMAT D-Commencement Letter.pdf25 Aug 2023
Declaration in FORM BFile: FORM B-Affidavit.pdf25 Aug 2023
CERSAI detailsFile: Declaration of Cersai.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (9).pdf25 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow25 Aug 2023

How this compares with Pune

48%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep R 47 -HIGHGARDENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmR 47 -HIGHGARDENSCompleted 2Lapsed / revoked 4Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: PARANJAPE SPACES AND SERVICES PVT LTD

PARANJAPE SPACES AND SERVICES PVT LTD has 4 registrations on MahaRERA, including R 47 -HIGHGARDENS and PARANJAPE ATHENA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if R 47 -HIGHGARDENS is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of R 47 -HIGHGARDENS?

The registered promoter entity is PARANJAPE SPACES AND SERVICES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in R 47 -HIGHGARDENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for R 47 -HIGHGARDENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at R 47 -HIGHGARDENS?

The professionals named in the filing: Architect: SANDEEP HARDIKAR & ASSOCIATES; Engineer: Deepali Desai; Engineer: SACHIN GITE; Chartered Accountant: Kapure & Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in R 47 -HIGHGARDENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About R 47 -HIGHGARDENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save R 47 -HIGHGARDENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.