Completed No litigation declared Residential / Group Housing project

Q Residences R1

By Aurum RealEstate Developers Limited

RG-MH-10835 · RERA P51700001722 · Last updated on MahaRERA portal: 13 Jun 2023

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 90%
4Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Q Residences R1 is a Residential / Group Housing project by Aurum RealEstate Developers Limited in Thane, Maharashtra, registered with MahaRERA as P51700001722 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 4 complaints are on record with the regulator.

At a glance

Project

  • NameQ Residences R1
  • TypeResidential / Group Housing
  • Location
    • Thane Belapur Road
    • Ghansoli
    • Navi Mumbai (M Corp.)
    • Thane
    • 400710
  • Pincode400710
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001722
  • ReraGenie IDRG-MH-10835

Builder

  • NameAurum RealEstate Developers Limited
  • Entity typeCompany
  • CINU45400MH2007FLC174767
  • GSTIN27AABCL3669A1ZP
  • DirectorsSaurabh Sangekar, Srirang Athalye
  • Other registrations7 more →
  • Completed5 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
R1NA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

R1: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises76%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 13 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes10%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed317

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots317
Closed/Covered317

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,558 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI13243.8
Proposed, not sanctioned13,244 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, SHOP NO 1, GRD FLOOR, TECHNOCITY, PLOT NO - X4/5, TTC INDUSTRIAL AREA , MAHAPE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNiral Patel
EngineerDesignage Consulting Structural Engineers
PartnerRole in project
Aurum RealEstate Developers Limited-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000199150SACHIN KUMAR BADAJE KAVYA SACHIN SHETTYSAURAB SANGEKAR27/11/2021
CC006000000198804parvez chougleaurum platz it private limited26/10/2021
CC006000000303291Pragya SinghAurum Platz IT Private Limited11/11/2022
CC006000000303368Pragya SinghAurum Platz IT Private Limited19/11/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jun 2021

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: R1 Form 4 Architect Certificate.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 C ENGINEERS CERTIFICATE R1 on OC.pdf29 Jun 2021
Certificates of CA (Form 3)File: Form 3 R1 on OC.pdf29 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: R1 Occupancy Certificate.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 R1 FY 19-20.pdf25 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 Qtr ended 31122020.pdf24 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R1 for Qtr ended 31122020.pdf24 Mar 2021
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATEc R1 for Qtr ended 31122020.pdf24 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 Qtr ended 31092020.pdf8 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R1 for Qtr ended 30092020.pdf8 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: R1 - FORM 2A - July to Sep 2020.pdf8 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R1 APRIL TO JUNE 2020.pdf8 Jan 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate R1 Qtr ended 30092020.pdf8 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 Qtr ended 31062020.pdf3 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R1 for Qtr ended 30062020.pdf3 Nov 2020
Certificates of CA (Form 3)File: Form 3 Opt CA Certificate R1 30062020.pdf3 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate R1 31032020.pdf10 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R1 for Qtr ended 31032020.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R1 April to June 2019.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R1 July to Sep 2019.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R1 Oct to Dec 2019.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R1 Jan to March 2020.pdf10 Aug 2020
Certificates of CA (Form 3)File: Form 3 CA certificate c R1 31032020.pdf10 Aug 2020
Proforma of Allotment letterFile: Proforma Agreement for Sale R1.pdf14 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 06012020.pdf14 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate FORM 2 ENGINEERS CERTIFICATE 06012020 R1.pdf14 Jan 2020
Certificates of CA (Form 3)File: Form 3 CA Certificate R1 Jan 2020.pdf14 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 29072017 to 31032018 R1.pdf25 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: April 2018 To March 2019 R1.pdf25 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 03102019.pdf14 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE 05102019 R1.pdf14 Oct 2019
Certificates of CA (Form 3)File: FORM 3 CA Certificate R1 14102019.pdf14 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 as on 30062009.pdf27 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate R1 as on 30062019.pdf27 Jul 2019
Certificates of CA (Form 3)File: Form 3 CA Certificate R1 as on 30062019.pdf27 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 20032019.pdf8 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE 20032019 R1.pdf3 May 2019
Certificates of CA (Form 3)File: Form - 3 CA Certificate R1.pdf29 Apr 2019
Proforma of Allotment letterFile: Proforma Agreement for Sale R1.pdf29 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R1 02012019.pdf22 Feb 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: R1 Society Registration Certificate.pdf22 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE 02012019 R1.pdf20 Feb 2019
Certificates of CA (Form 3)File: Form 3 CA Certificate R1 31122018.pdf20 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Achitect Certificate R1 03102018.pdf26 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R1 03102018.pdf26 Dec 2018
Certificates of CA (Form 3)File: Form 3 CA certificate R1 03102018.pdf26 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Intimation of CHS forming to MahaRERA.pdf29 Aug 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Applicaton form for Q Residences R1 CHS Name Reservation.pdf29 Aug 2018
Proforma of Allotment letterFile: R1 Agreement for Sale 03082018.pdf4 Aug 2018
PAN CardFile: PAN Aurum IT.pdf16 Jul 2018
Copy of the legal title reportFile: Title Certificate 13072018.pdf16 Jul 2018
Details of encumbrancesFile: Encumbrance Declaration R1.pdf16 Jul 2018
OtherFile: Certificate of Incorporation.pdf16 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 29062018.pdf7 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineers Certificate 29062018.pdf7 Jul 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate 29062018.pdf7 Jul 2018
Layout approvalFile: Approved Master Plan.pdf21 Jul 2017
Building plan approvalFile: R1 Approved Plan.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved Master Plan.pdf21 Jul 2017
Building Plan Approval (IOD)File: R1 Approved Plan.pdf21 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf21 Jul 2017
Proforma of Allotment letterFile: Proforma of Allotment Letter and Agreement for Sale.pdf20 Jul 2017
Copy of the legal title reportFile: Title Report.pdf19 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf19 Jul 2017
Declaration in FORM BFile: Form B.pdf19 Jul 2017
PAN CardFile: LOMA-PAN card.PDF15 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Q Islands R4P51700023775Ghansoli, Thane-Jan 2020CompletedDec 2024Oct 2024
Q Residences R3Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2023Jul 2022
Q Residences R2UP51700017305Ghansoli, Thane240Jul 2018CompletedDec 2022Jan 1970
Q Residences R2Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2022Apr 2022
Q Residences R1Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2020Dec 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Q Residences R1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghansoli7,600+ in Thane

2 kmQ Residences R1Completed 27Lapsed / revoked 4Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Aurum RealEstate Developers Limited

Aurum RealEstate Developers Limited has 8 registrations on MahaRERA, including Q Residences R1 and Q Residences R2. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Q Residences R1 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Q Residences R1?

The registered promoter entity is Aurum RealEstate Developers Limited, a company as per the filing. Its CIN U45400MH2007FLC174767 and GSTIN 27AABCL3669A1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Q Residences R1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Q Residences R1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Q Residences R1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Q Residences R1?

The professionals named in the filing: Architect: Niral Patel; Engineer: Designage Consulting Structural Engineers. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Q Residences R1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Q Residences R1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Q Residences R1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.