Home / Browse projects / Thane, Maharashtra / Q Residences R2 U

Completed No litigation declared Residential / Group Housing project

Q Residences R2 U

By Aurum RealEstate Developers Limited

RG-MH-52225 · RERA P51700017305 · Last updated on MahaRERA portal: 19 Jul 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Q Residences R2 U is a Residential / Group Housing project by Aurum RealEstate Developers Limited in Thane, Maharashtra, registered with MahaRERA as P51700017305 on 31 Jul 2018. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameQ Residences R2 U
  • TypeResidential / Group Housing
  • Location
    • Thane Belapur Road
    • Ghansoli
    • Navi Mumbai (M Corp.)
    • Thane
    • 400710
  • Pincode400710
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700017305
  • ReraGenie IDRG-MH-52225

Builder

  • NameAurum RealEstate Developers Limited
  • Entity typeCompany
  • CINU45400MH2007FLC174767
  • GSTIN27AABCL3669A1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSaurabh Sangekar, Srirang Athalye
  • Other registrations7 more →
  • Completed5 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
R2NA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

R2: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 19 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Covered ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,873 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6876.68
Proposed, not sanctioned6,877 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 and 2 ,Ground Floor, Technocity, Plot No X/4-5,TTC Industrial Area, Mahape

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNiral Patel
EngineerDesignage Consulting Structural Engineers
PartnerRole in project
Aurum RealEstate Developers Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jul 2023

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate For R1 R2 R2A.pdf19 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_R2.pdf6 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: R2 SOCIETY R.pdf13 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate R2 and R2U.pdf26 Jun 2022
Disclosure of sold/ booked inventoryFile: R2 and R2U Inventories disclosure 31032022.pdf17 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr ended 31032022.pdf6 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 31032022.pdf6 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A R2U qtr ended 31032022.pdf6 Jun 2022
Certificates of CA (Form 3)File: Form 3 R2U Certificate as on 31 03 2022.pdf6 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 R2 R2U.pdf6 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr Ended 30092021.pdf22 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 30092021.pdf22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R2U July to Sep 2021.pdf22 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 3 CA Certificate R2U 30092021.pdf22 Oct 2021
Disclosure of sold/ booked inventoryFile: Diclosure of Inventory R2 and R2U 30092021.pdf22 Oct 2021
Disclosure of sold/ booked inventoryFile: Diclosure of Inventory R2 and R2U 30092021.pdf22 Oct 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U 30092021.pdf22 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr Ended 30062021.pdf9 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 30062021.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - R2U - Apr to Jun 2021.pdf9 Aug 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U 30062021.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr Ended 31122020.pdf19 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr Ended 31032021.pdf19 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U Qtr ended 31122020.pdf19 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 31032021.pdf19 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - R2U - Oct to Dec 2020.pdf19 Jun 2021
Certificates of CA (Form 3)File: Form 3 R2 U 31122020.pdf19 Jun 2021
Certificates of CA (Form 3)File: Form 3-R2 U Qtr ended 31032021.pdf19 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 R2 FY 19-20.pdf25 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr Ended 30092020.pdf8 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 30092020.pdf8 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: R2U - FORM 2A - July to Sep 2020.pdf8 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R2-APRIL TO JUNE 2020.pdf8 Jan 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U Qtr ended 30092020.pdf8 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U Qtr Ended 30062020.pdf3 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 30062020.pdf3 Nov 2020
Certificates of CA (Form 3)File: Form 3 OPT CA Certificate R2U 30062020.pdf3 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate R2U 3132020.pdf10 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U for Qtr ended 31032020.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R2 Jan to March 2020.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R2 April to June 2019.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R2 July to Sep 2019.pdf10 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A R2 Oct to Dec 2019.pdf10 Aug 2020
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U 31032020.pdf10 Aug 2020
Proforma of Allotment letterFile: Proforma Agreement for Sale R2 R2U.pdf14 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U 06012020.pdf14 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate FORM 2 ENGINEERS CERTIFICATE R2U 06012020.pdf14 Jan 2020
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U Jan 2020.pdf14 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U as on 30062019.pdf27 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate R2U as on 30062019.pdf27 Jul 2019
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U as on 30062019.pdf27 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U 15042019.pdf8 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE 15042019 R2U.pdf8 May 2019
Certificates of CA (Form 3)File: Form 3 - CA Certificate R2U.pdf8 May 2019
Proforma of Allotment letterFile: Proforma Agreement for Sale R2U.pdf29 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE R2U 02012019.pdf22 Feb 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Cooperative Society Formation intimation R2.pdf22 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U 02012019.pdf20 Feb 2019
Certificates of CA (Form 3)File: Form 3 CA Certificate R2U 31122018.pdf20 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Achitect Certificate R2U 03102018.pdf26 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE R2U 03102018.pdf26 Dec 2018
Proforma of Allotment letterFile: R2 Agreement for Sale 03082018.pdf4 Aug 2018
Building plan approvalFile: R2 Building Plan Approval 21072018.pdf21 Jul 2018
Layout approvalFile: R2 Layout Plan 21072018.pdf21 Jul 2018
PAN CardFile: PAN Aurum IT.pdf21 Jul 2018
Copy of the legal title reportFile: Title Certificate 13072018.pdf21 Jul 2018
Details of encumbrancesFile: Encumbrance Declaration R2 U.pdf21 Jul 2018
Copy of Layout Approval (in case of layout)File: R2 Layout Plan 21072018.pdf21 Jul 2018
Building Plan Approval (IOD)File: R2 Building Plan Approval 21072018.pdf21 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Jul 2018
Declaration in FORM BFile: Form B.pdf21 Jul 2018
Certificates of CA (Form 3)File: Form-3 CA Certificate 21072018.pdf21 Jul 2018
Proforma of Allotment letterFile: Proforma Agreement for Sale.pdf21 Jul 2018
OtherFile: Certificate of Incorporation.pdf21 Jul 2018

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Q Islands R4P51700023775Ghansoli, Thane-Jan 2020CompletedDec 2024Oct 2024
Q Residences R3Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2023Jul 2022
Q Residences R2Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2022Apr 2022
Q Residences R1Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2020Dec 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Q Residences R2 U on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghansoli7,600+ in Thane

2 kmQ Residences R2 UCompleted 27Lapsed / revoked 4Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Aurum RealEstate Developers Limited

Aurum RealEstate Developers Limited has 8 registrations on MahaRERA, including Q Residences R1 and Q Residences R2. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Q Residences R2 U is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Q Residences R2 U?

The registered promoter entity is Aurum RealEstate Developers Limited, a company as per the filing. Its CIN U45400MH2007FLC174767 and GSTIN 27AABCL3669A1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Q Residences R2 U?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Q Residences R2 U?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Q Residences R2 U?

The professionals named in the filing: Architect: Niral Patel; Engineer: Designage Consulting Structural Engineers. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Q Residences R2 U?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Q Residences R2 U. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Q Residences R2 U to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.