ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Q Islands R5

Registration lapsed No litigation declared Residential / Group Housing project

Q Islands R5

By Aurum RealEstate Developers Limited

RG-MH-21840 · RERA P51700023911 · Last updated on MahaRERA portal: 11 Aug 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
2 of 11Construction stages donefurthest along: Staircases, 97%
0Complaints at MahaRERAon this registration
Jump to the 169 documents Report an error

Q Islands R5 is a Residential / Group Housing project by Aurum RealEstate Developers Limited in Thane, Maharashtra, registered with MahaRERA as P51700023911 on 14 Jan 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameQ Islands R5
  • TypeResidential / Group Housing
  • Location
    • Thane Belapur Road
    • Ghansoli
    • Navi Mumbai (M Corp.)
    • Thane
    • 400710
  • Pincode400710
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700023911
  • ReraGenie IDRG-MH-21840

Builder

  • NameAurum RealEstate Developers Limited
  • Entity typeCompany
  • CINU45400MH2007FLC174767
  • GSTIN27AABCL3669A1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSaurabh Sangekar, Srirang Athalye
  • Other registrations7 more →
  • Completed5 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

10 months past promisethis monthRegisteredJan 2020PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Jan 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed169 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Q Islands R5NA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.

Q Islands R5: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)87%
Podiums (if any)84%
Plinth87%
Stilt Floor82%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.67%

Progress on shared amenities15

As on 11 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed363

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots363
Closed/Covered363

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,466 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15176.38
Proposed, not sanctioned15,176 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, SHOP NO 1, GRD FLOOR, TECHNOCITY, PLOT NO - X4/5, TTC INDUSTRIAL AREA , MAHAPE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNiral Patel
EngineerDesignage Consulting Structural Engineers
Chartered AccountantDesai Associates
Chartered AccountantPankaj Khetan and Associates
Chartered AccountantNiyati Arora and Associates
PartnerRole in project
Aurum RealEstate Developers Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed169

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 169 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter ended June-2025_draft.pdf11 Aug 2025
Form 2File: certificate-262-FORM 2 ENGINEERS CERTIFICATE R5 APR to JUN 2025.pdf11 Aug 2025
Form 3File: AREDL_R5 RERA Form 3 Certificate_April to June 2025.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: R5__Sold Unsold Inventory Disclosure__April to June 2025.pdf11 Aug 2025
Self-declaration of Quarterly ProgressFile: Self Declaration by Promoter__R5__April to June 2025.pdf11 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A ENGINEER CERTIFICATE Quality Assurance - R5.pdf2 Jul 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter ended March 2025.pdf20 Jun 2025
Form 2File: certificate-256-FORM 2 ENGINEERS CERTIFICATE R5 JAN to MAR 2025.pdf20 Jun 2025
OthersFile: FORM 2A ENGINEER CERTIFICATE Quality Assurance Format - R5.pdf20 Jun 2025
Form 3File: R5_Form 3_JAN to MAR 2025_signed and stamped.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: R5_Disclosure of Sold inventory_JAN to MAR 2025.pdf20 Jun 2025
Self-declaration of Quarterly ProgressFile: R5_Self declaration by Promoter JAN-MAR 2025.pdf20 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: certificate-255-FORM 2A ENGINEER CERTIFICATE Quality Assurance Format - R5.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGINEER CERTIFICATE Quality Assurance Format - R5.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory R5 December 2024.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: R5 Disclosure of Inventories Sep 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory R5 December 2024.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory R5 December 2024.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: R5 Disclosure of Inventories Sep 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory R5 December 2024.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory R5 December 2024.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: R5 Disclosure of Inventories Sep 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory R5 December 2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Oct to Dec 2024 quarter.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 DECEMBER 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 RERA Certificate Oct to Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Oct to Dec 2024 quarter.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 DECEMBER 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 RERA Certificate Oct to Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Oct to Dec 2024 quarter.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 RERA Certificate Oct to Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 DECEMBER 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 FORM 3 JULY to SEPT 2024.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 R5 2023 to 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 FORM 3 JULY to SEPT 2024.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 R5 2023 to 2024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 FORM 3 JULY to SEPT 2024.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 R5 2023 to 2024.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter APRIL to JUNE 2024.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter JULY to SEPT 2024.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 Qtr APRIL to JUNE 2024.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter APRIL to JUNE 2024.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter JULY to SEPT 2024.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 Qtr APRIL to JUNE 2024.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter APRIL to JUNE 2024.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter JULY to SEPT 2024.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 Qtr APRIL to JUNE 2024.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 30062024 Compressed.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 30062024 Compressed.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 30062024 Compressed.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 30062024 Compressed.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosures R5.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 Qtr ended 31032024.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter ended 20042024.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: R5 FORM 2A Jan to March 2024.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory R5 Mar 24.pdf25 Apr 2024
CERSAI detailsFile: CERSAI Report R4 R5 Qtr Ended Apr 24.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 Form 3 RERA Certificate 31032024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 31122023.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: R5 Form 5.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 R5 2122.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: R5 Disclosure of Inventory Dec 23.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter ended 30122023.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: R5 FORM 2A Oct to Dec 2023.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122023 R5.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: R5 Disclosure of Sold Booked Inventory 30092023.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 30092023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarted ended 30092023.pdf6 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: R5 FORM 2A July to Sep 2023.pdf6 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5 RERA Certificate 30092023.pdf10 Nov 2023
Details of encumbrances concerned to FinanceFile: Declaration Regarding Legal Encumbrance R5.pdf30 Oct 2023
Details of encumbrances concerned to LegalFile: Declaration Regarding Legal Encumbrance R5.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory R5 for qtr ended 31032023.pdf30 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation Report R5.pdf30 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Grevance Redressal.pdf30 Oct 2023
Proforma of Allotment letterFile: Allotment Letter.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE R5 Quarter ended 30062023.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE R5 30062023.pdf1 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A R5 April to June 2023.pdf1 Oct 2023
Disclosure of sold/ booked inventoryFile: R5 disclosure of Inventories.pdf1 Oct 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Q Islands R4P51700023775Ghansoli, Thane-Jan 2020CompletedDec 2024Oct 2024
Q Residences R3Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2023Jul 2022
Q Residences R2UP51700017305Ghansoli, Thane240Jul 2018CompletedDec 2022Jan 1970
Q Residences R2Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2022Apr 2022
Q Residences R1Pot No Gen 4 by 1 TTC Industrial Area Thane Belapur Road Ghansoli Navi Mumbai 400710240-CompletedDec 2020Dec 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Q Islands R5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghansoli7,600+ in Thane

2 kmQ Islands R5Completed 30Lapsed / revoked 3Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: Aurum RealEstate Developers Limited

Aurum RealEstate Developers Limited has 8 registrations on MahaRERA, including Q Residences R1 and Q Residences R2. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Q Islands R5 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Q Islands R5 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Q Islands R5?

The registered promoter entity is Aurum RealEstate Developers Limited, a company as per the filing. Its CIN U45400MH2007FLC174767 and GSTIN 27AABCL3669A1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Q Islands R5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Q Islands R5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Q Islands R5?

The professionals named in the filing: Architect: Niral Patel; Engineer: Designage Consulting Structural Engineers; Chartered Accountant: Desai Associates; Chartered Accountant: Pankaj Khetan and Associates; Chartered Accountant: Niyati Arora and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Q Islands R5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Q Islands R5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Q Islands R5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.