Pyramid Parkland
RG-MH-16376 · RERA P52100025994 · Last updated on MahaRERA portal: 25 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Pyramid Parkland is a Residential / Group Housing project by Pyramid Lifestyle Limited in Pune, Maharashtra, registered with MahaRERA as P52100025994 on 7 Aug 2020. Possession is promised by 30 Jun 2028. 1 complaint is on record with the regulator.
At a glance
Project
- NamePyramid Parkland
- TypeResidential / Group Housing
- Location
- Gat No 1381
- 1382 & 1384
- Behind Bharat Petrol Pump
- Bhukum
- Mulshi
- Pune
- 412115
- Pincode412115
- RERA no.P52100025994
- ReraGenie IDRG-MH-16376
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Aug 2020
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings2 building records
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B1 | NA | 13 | 0 | 0 | 0 | 0 |
| B2 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
B198%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
B227%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 25 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| SOLOR | Yes | 0% |
| ENTRANCE GATE | Yes | 0% |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| B1 | 20 | 15 | 35 |
| B2 | 1 | 15 | 16 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Prasad Pradip Tatawar | Baner | Pune |
| Yash Tatawar | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rao Arch |
| Architect | A B Architects |
| Engineer | Vijay Shinde |
| Engineer | Pravin Wadje |
| Chartered Accountant | S P Dara and assocites |
| Chartered Accountant | SONAL M & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Pyramid Lifestyle Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504724 | Swanand Charudatta Bhalwankar | Pyramid Lifestyle LLP | 31/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM-1 PARKLAND JUNE-2025.pdf | 25 Aug 2025 |
| Form 2File: FORM 2 PARKLAND JUNE 2025.pdf | 25 Aug 2025 |
| Form 3File: FORM 3 PARKLAND JUNE 2025.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked-Parkland-B1.pdf | 25 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-March-2025 Parkland.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-LIFESTYLE-MARCH-2025_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2-LIFESTYLE-MARCH-2025.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD -LIFESTYLE-MARCH-2025.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM-1-PARKLAND-DEC-2024.pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_PARKLAND_LIFESTYLE DEC 2024_compressed.pdf | 9 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_PARKLAND_PYRAMID LIFESTYLE LLP.pdf | 9 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 PARKLAND 2023-123.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 PARKLAND 2023-123.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Pyramid Lifestyle LLP Sept 2024.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PYRAMID LIFESTYLE LLP SEP 2024.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Pyramid Lifestyle LLP Sept 2024.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTARY SEP 2024 PARKLAND.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_PARKLAND.pdf | 20 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PARKLAND.pdf | 20 Aug 2024 |
| Layout approvalFile: HPSC1427.pdf | 1 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: HPSC1427.pdf | 1 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: SKM_C364e24070107300_compressed.pdf | 1 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pyramid Lifestyle LLP Q4001.pdf | 30 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Pyramid Lifestyle LLP - form 2A - mar 24.pdf | 6 May 2024 |
| Disclosure of sold/ booked inventoryFile: Pyramid parkland - disclosure of sold unsold - mar 24.pdf | 6 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pyramid Lifestyle LLP - form 1 - mar 24.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pyramid Lifestyle LLP - Form 2 - mar 24.pdf | 18 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Pyramid Lifestyle LLP - form 2A - mar 24.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Parkland dec-23_compressed.pdf | 27 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Parkland_dec 23_compressed.pdf | 21 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Parkland_dec 23_compressed.pdf | 21 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Parkland_Dec 23.pdf | 21 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Parkland_Dics of sold unsold_dec 23.pdf | 21 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: pyramid Parkland -Form 1- Sep 23.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pyramid Parkland-Form 2 - sep 23_compressed.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: pyramid Parkland-Form 2A - sep 23_compressed.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pyramid Parkland -Form 3 - sep 23_compressed.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Pyramid Lifestyle LLP-JUNE 2023.pdf | 17 Aug 2023 |
| Declaration in FORM BFile: Form B-Atlante.pdf | 25 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 LIFESTYLE JUNE-23_compressed.pdf | 25 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PYRAMID LIFESTYLE LLP FORM 5 2022-23.pdf | 25 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate- Parkland.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Quality Assurance - Parkland.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Life style Sold - Unsold Inventary -Quaterly.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Parkland 2021 22.pdf | 31 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Parkland 2022 23.pdf | 31 May 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of Fin Encumbrance Pyramid Parkland.pdf | 25 May 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of Fin Encumbrance Pyramid Parkland.pdf | 25 May 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-PYRAMID PARKLAND.pdf | 25 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200269726187_For_Debtor_Based_Search_25_05_2023_18_58_41_571.pdf | 25 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200269726167_For_Debtor_Based_Search_25_05_2023_18_58_31_158.pdf | 25 May 2023 |
| Details of encumbrances concerned to FinanceFile: DECLARATION ABOUT LEGAL ENCUMBRANCE_compressed.pdf | 8 May 2023 |
| Details of encumbrances concerned to LegalFile: DECLARATION ABOUT LEGAL ENCUMBRANCE_compressed.pdf | 8 May 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE_compressed.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FY 2020 21.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FY 2021 22.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FY 2022 23.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FY 2022 23 QUATERLY.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 2020 21.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 2021 22.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 2022 23.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Certificate No 04 March 2022.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate No 01 June 2022.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate No 02 Sept 2022.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate No 03 Dec 2022.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Certificate No 04 March 2023.pdf | 8 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate organizations_compressed.pdf | 8 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account_compressed.pdf | 8 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: From 5 2020-2021.pdf | 17 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5 2020-2021.pdf | 17 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5 2020-2021.pdf | 17 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 2020-2021.pdf | 17 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 17 Apr 2023 |
| Layout approvalFile: Temp00443 (2).pdf | 19 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: Temp00443 (2).pdf | 19 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Parkland (1).pdf | 19 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July 2020.pdf | 30 Jul 2020 |
| Layout approvalFile: my11_compressed.pdf | 28 Jul 2020 |
| Copy of Layout Approval (in case of layout)File: my11_compressed.pdf | 28 Jul 2020 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Pyramid Axis | Survey no 112 1 2 112 2 2 112 1 2 2 p behind Croma showroom Baner Pune 411045 | 64 | Completed | Jun 2024 | Jun 2024 |
| ATLANTE | Survey no 56 2 1 56 2 2 56 2 3 56 2 4 opp Akshar Elementa Near Sai Balaji Institiue Tathawade Wakad Pune 411033 | 360 | Completed | Jun 2023 | Late, Dec 2023 |
| Pyramid County | Gat No 99 Bhukum Tal Mulshi Dist Pune 412115 | 208 | Completed | Dec 2020 | Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Pyramid Parkland on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhukum13,700+ in Pune
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: Pyramid Lifestyle Limited
Pyramid Lifestyle Limited has 2 registrations on MahaRERA, including Pyramid Parkland and Pyramid Parkland Nxt. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Pyramid Parkland is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Pyramid Parkland?
The registered promoter entity is Pyramid Lifestyle Limited, a company as per the filing. Its CIN U43900PN2026PLC253315 and GSTIN 27AAQCP8383G1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Pyramid Parkland?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Pyramid Parkland?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Pyramid Parkland?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Pyramid Parkland?
The professionals named in the filing: Architect: Rao Arch; Architect: A B Architects; Engineer: Vijay Shinde; Engineer: Pravin Wadje; Chartered Accountant: S P Dara and assocites; Chartered Accountant: SONAL M & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pyramid Parkland?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback