Home / Browse projects / Raigarh, Maharashtra / Pyramid

Registered No litigation declared Residential / Group Housing project

Pyramid

By Mounthill Realty Pvt Ltd

RG-MH-26186 · RERA P52000005147 · Last updated on MahaRERA portal: 27 Jun 2025

Source: official MahaRERA filing

Red flags

  • 44 complaints at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 36 months from the original
14 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 80%
44Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Pyramid is a Residential / Group Housing project by Mounthill Realty Pvt Ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000005147 on 9 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 44 complaints are on record with the regulator.

At a glance

Project

  • NamePyramid
  • TypeResidential / Group Housing
  • Location
    • Kharpada Road
    • Majgaon Ambivali
    • Ambivali T. Tungartan
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005147
  • ReraGenie IDRG-MH-26186

Builder

  • NameMounthill Realty Pvt Ltd
  • Entity typeCompany

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2024)
  • Buildings8 building records
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA230000
Wing BNA230000
Wing CNA200000
Wing DNA230000
Wing ENA230000
Wing FNA200000
Wing GNA230000
Wing HNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 27 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 80%.

Wing A35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor60%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing F3%
ActivityProgress
Excavation30%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing G3%
ActivityProgress
Excavation30%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing H3%
ActivityProgress
Excavation30%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed447

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots447
Closed/Covered312
Open Space135
BuildingClosed/CoveredOpen SpaceTotal
Wing A305135440
Wing B101
Wing C101
Wing D101
Wing E101
Wing F101
Wing G101
Wing H101

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,676 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI34678.8
Proposed, not sanctioned34,679 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch85, Bentinck Street, 1st Floor, Bowbazar, Kolkata 700001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAliasgher Abuzer Abassi
EngineerAscent Consulting Engineers
Chartered AccountantA R AGARWAL & ASSOCIATES
PartnerRole in project
Mounthill Realty Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000025142Dec 2024 → Dec 2027

Reason as filed by the promoterWe Mount hill Realty Promoter of Pyramid project applying for extension of project.There are 626 total unit in project out of which 68 are sold,we have obtained 51% consent from purchasers.The main reason for delay is monetarily as more than 43% of the purchases who had purchased units refuse to pay any money after paying first amount maximum upto Rs. 50,000 of the total value of the units. Approx 16% of the buyer have paid less than 10% of the total unit value and balance 41% Paid 20% of the units value. 3. It is submitted that this is not only locked the inventory but also resulted in financ

Complaints filed with MahaRERA44

Case no.ComplainantRespondentFiled
CC006000000023292Nelson DSouzaMounthill Realty Pvt Ltd09/02/2018
CC006000000054688Nelson DSouzaMounthill Realty Pvt Ltd29/05/2018
CC006000000195592YOGESH ASHOK MOREMOUNTHILL REALTY PVT. LTD.13/01/2021
CC006000000209386Mr. Krishnkumar Jugalkishor Kedia and Mrs Minakshi MoitraMounthill Realty Pvt Ltd13/12/2021
CC006000000209389Mr Krishnakumar Jugalkishor Kedia and Mrs Minakshi MoitraMounthill Realty Pvt Ltd13/12/2021
CC006000000209736Mr Anand Babaji Gawde & Mrs Sheetal Anand GawdeMounthill Realty Pvt Ltd19/01/2022
CC006000000209738Mr Dinesh Palav & Mrs Vandana PalavMounthill Realty Pvt Ltd19/01/2022
CC006000000210053Shailesh TanjoreMounthill Realty Pvt Ltd18/02/2022
CC006000000220700Mrs. Anita Chandan Khairnar And Ms. Rhema Chandan KhairnarMounthill Realty Pvt Ltd07/04/2022
CC006000000344196Alwyn Prasad DMelloMount Hill Realty Pvt Ltd02/02/2023
CC006000000396197MOUINTHILL REALTY PVT LTDANAYO SENGUPTA22/06/2023
CC006000000396198MOUINTHILL REALTY PVT LTDRukuddin Mansoori22/06/2023
CC006000000396199MOUINTHILL REALTY PVT LTDSanobar Shaikh22/06/2023
CC006000000396222MOUINTHILL REALTY PVT LTDRandeep Narang22/06/2023
CC006000000396232MOUINTHILL REALTY PVT LTDSomnath Sihoba Mote23/06/2023
CC006000000396239MOUINTHILL REALTY PVT LTDAnand Ashok Dhotre23/06/2023
CC006000000396241MOUINTHILL REALTY PVT LTDSarika Rajendra Kanthe23/06/2023
CC006000000396243MOUINTHILL REALTY PVT LTDAshish Patel23/06/2023
CC006000000396262MOUINTHILL REALTY PVT LTDAanad Babaji Gavade23/06/2023
CC006000000396263MOUINTHILL REALTY PVT LTDDinesh Palav23/06/2023
CC006000000396265MOUINTHILL REALTY PVT LTDSUMIT BAJAJ23/06/2023
CC006000000396266MOUINTHILL REALTY PVT LTDDipinkar Buruah23/06/2023
CC006000000396268MOUINTHILL REALTY PVT LTDKalim Ajasher23/06/2023
CC006000000396270MOUINTHILL REALTY PVT LTDPhilip John Daniel23/06/2023
CC006000000396272MOUINTHILL REALTY PVT LTDPraksh Develker23/06/2023
CC006000000396273MOUINTHILL REALTY PVT LTDRandeep Narang23/06/2023
CC006000000396274MOUINTHILL REALTY PVT LTDSaji Kumaran23/06/2023
CC006000000396275MOUINTHILL REALTY PVT LTDSavio Bragnza23/06/2023
CC006000000396276MOUINTHILL REALTY PVT LTDSharfuddin Shaikh23/06/2023
CC006000000396277MOUINTHILL REALTY PVT LTDSHyam Govind SIngh23/06/2023
CC006000000396281MOUINTHILL REALTY PVT LTDSubhdeep Muzumdar23/06/2023
CC006000000396284MOUINTHILL REALTY PVT LTDSakina Dahodwala23/06/2023
CC006000000396286MOUINTHILL REALTY PVT LTDPoorvi Devani23/06/2023
CC006000000396287MOUINTHILL REALTY PVT LTDRupali Parashar23/06/2023
CC006000000396289MOUINTHILL REALTY PVT LTDRahul Garg23/06/2023
CC006000000396290MOUINTHILL REALTY PVT LTDSAGAR SATISH PUND23/06/2023
CC006000000396293MOUINTHILL REALTY PVT LTDShailesh Papat23/06/2023
CC006000000396294MOUINTHILL REALTY PVT LTDSonali Bhatt23/06/2023
CC006000000396295MOUINTHILL REALTY PVT LTDYogesh More23/06/2023
CC006000000397152SUBHODEEP MAZUMDARMOUNTHILL REALTY PVT LTD04/09/2023
CC12400648Randeep Mohanjit NarangMounthill Realty Pvt Ltd04/11/2024
CC12400650Randeep Mohanjit NarangMounthill Realty Pvt Ltd04/11/2024
CC12503712SONALI GONDKARMounthill Realty Pvt Ltd20/10/2025
CC12604386Mohd Sharique Sarmad HalimMounthill Realty Pvt Ltd14/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FORM B MOUNT HILL.pdf27 Jun 2025
Certificates of CA (Form 3)File: Form3 JUNE 1.pdf26 Jun 2025
Certificates of CA (Form 3)File: Form 3June 2.pdf26 Jun 2025
Certificates of CA (Form 3)File: Form 3June 3.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: MOUNTHILL DISCLOSURE OF SOLD AND BOOKED.pdf26 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_April_25.pdf3 May 2025
Certificates of CA (Form 3)File: FORM 3 APRIL 25.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 April 25.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: MOUNTHILL LEGAL ENCUMBRANCES.pdf11 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Annexure E - Architect Certificate.pdf11 Dec 2024
Certificates of CA (Form 3)File: FORM 3 N_compressed.pdf11 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ascent Certificate Oct 2024.pdf11 Dec 2024
CERSAI detailsFile: _CERSAI Report.pdf11 Dec 2024
Details of encumbrances concerned to LegalFile: MOUNTHILL LEGAL ENCUMBRANCES.pdf11 Dec 2024
Proforma of Agreement for saleFile: AFS.pdf11 Dec 2024
Declaration in FORM BFile: MOUNT HILL FORM B.pdf21 Nov 2024
Certificates of CA (Form 3)File: MOUNTHILL FORM 3 F.pdf21 Nov 2024
Declaration in FORM BFile: MOUNT HILL FORM B.pdf21 Nov 2024
Certificates of CA (Form 3)File: MOUNTHILL FORM 3 F.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold N Unsold Disclosure.pdf18 Nov 2024
Certificates of CA (Form 3)File: Form 3_CA.pdf18 Nov 2024
Proforma of Agreement for saleFile: Form 5_CA.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_CA.pdf18 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Other - Finance (1).pdf18 Nov 2024
Certificates of CA (Form 3)File: Form 3_CA.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold N Unsold Disclosure.pdf18 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Other - Finance (1).pdf18 Nov 2024
Proforma of Agreement for saleFile: Form 5_CA.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_CA.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold N Unsold Disclosure.pdf28 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other projects.pdf28 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate on Quality Assurance-27-10-2024.pdf28 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Finance Disclosure.pdf28 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect CertificatE.pdf24 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate July 2024.pdf28 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ascent Certificate July 2024.pdf28 Jul 2024
Certificates of CA (Form 3)File: ca CERT JULY 24.pdf28 Jul 2024
Certificates of CA (Form 3)File: CA Certificate RERA_16-12-2023.pdf19 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf6 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf6 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Architect Certificate filled.pdf19 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Architect Certificate filled.pdf19 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: J-630_03_RERA[1].pdf19 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf19 Jun 2023
Certificates of CA (Form 3)File: CA Certificate RERA_05-05-2023.pdf19 Jun 2023
OtherFile: J-630_03_RERA[1] (2).pdf19 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: J-630_03_RERA[1].pdf13 Jun 2023
Certificates of CA (Form 3)File: Latest CA Certificate RERA_05-05-2023.pdf13 Jun 2023
OtherFile: J-630_03_RERA[1] (1).pdf13 Jun 2023
OtherFile: J-630_03_RERA[1] (1).pdf13 Jun 2023
Other - FinanceFile: Collection Account Confirmation of Panvel Hills The Pyramid from Axis Bank.pdf29 Aug 2022
Other - FinanceFile: Collection Account Confirmation of Panvel Hills The Pyramid from Axis Bank.pdf29 Aug 2022
Other - FinanceFile: Board Resolution for Account.pdf29 Aug 2022
Details of encumbrances concerned to LegalFile: pdf_20220825_120409_0000.pdf26 Aug 2022
Other - FinanceFile: Accounts Details.pdf26 Aug 2022
Other - TechnicalFile: pdf_20220825_120409_0000.pdf26 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DOC062.pdf18 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ASCENT - 11 May 2022 - 13-14_compressed.pdf18 May 2022
Certificates of CA (Form 3)File: CA Certificate RERA_11-05-22_compressed.pdf18 May 2022
PAN CardFile: PAN.pdf11 Aug 2021
PAN CardFile: PAN L_compressed.pdf11 Aug 2021
Declaration about Commencement CertificateFile: CC.pdf11 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf11 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cer.pdf11 Aug 2021
Certificates of CA (Form 3)File: CA Cert.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 17-18.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf11 Aug 2021
OtherFile: FERFER.pdf11 Aug 2021
OtherFile: fire.pdf11 Aug 2021
OtherFile: GHOSHONA.pdf11 Aug 2021
OtherFile: GRAM.pdf11 Aug 2021
OtherFile: NAGAR.pdf11 Aug 2021
OtherFile: TITLE.pdf11 Aug 2021
OtherFile: ENV.pdf11 Aug 2021
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf26 Jul 2018
OtherFile: JDA.pdf26 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf31 Oct 2017
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE.pdf31 Oct 2017
Copy of the legal title reportFile: Title Certificate of the said Property.pdf28 Sep 2017
Copy of the legal title reportFile: Title Certificate of the said Property.pdf28 Sep 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pyramid on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majgaon Ambivali5,900+ in Raigarh

2 kmPyramidCompleted 37Lapsed / revoked 28Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: Mounthill Realty Pvt Ltd

Mounthill Realty Pvt Ltd has 1 registration on MahaRERA, including Pyramid. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Pyramid is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pyramid?

The registered promoter entity is Mounthill Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pyramid?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pyramid?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pyramid?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pyramid?

The professionals named in the filing: Architect: Aliasgher Abuzer Abassi; Engineer: Ascent Consulting Engineers; Chartered Accountant: A R AGARWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pyramid?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pyramid. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pyramid to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.