ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / PYRAMID COUNTY BHUKUM

Completed No litigation declared Residential / Group Housing project

PYRAMID COUNTY BHUKUM

By PRASAD LIFESPACES LLP

RG-MH-09018 · RERA P52100000387 · Last updated on MahaRERA portal: 11 Jul 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
39 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

PYRAMID COUNTY BHUKUM is a Residential / Group Housing project by PRASAD LIFESPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100000387 on 15 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2023. The completion date has moved by 18 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePYRAMID COUNTY BHUKUM
  • TypeResidential / Group Housing
  • Location
    • PAUD ROAD
    • BHUGAON
    • Bhukum
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000387
  • ReraGenie IDRG-MH-09018

Builder

  • NamePRASAD LIFESPACES LLP
  • Entity typeCompany
  • Managing DirectorPRASAD PRADIP TATAWAR

Key dates

this monthRegisteredJul 2017First promiseMar 2022Revised toSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 30 Mar 2022)
  • Buildings4 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA150000
A2NA150000
ROWHOUSE 1,2,3,4,5,6NA180000
ROWHOUSE 7,8,9,10,11,12NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

39 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 1,2,3,4,5,682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 7,8,9,10,11,1291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered2
Open Space70
BuildingClosed/CoveredOpen SpaceTotal
A113536
A213536

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12805.04
Proposed, not sanctioned12,805 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJangli Maharaj Road Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL LONDHE
EngineerRajesh Nigade
PartnerRole in project
PRASAD LIFESPACES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100010944Mar 2022 → Sep 2023

Reason as filed by the promoterdue to the conditions of Aviation NOC for completion certificate as per the new rule July 2019, Unable to get the Completion certificate till the date for the same. We have already applied for Aviation NOC. As soon as we will get the Aviation NOC completion certificate process will be done

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000064954Manohar Panjumal DamechaPrasad Lifespaces LLP27/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Aug 2022

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 - Pyramid County.PDF11 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion Certificate.pdf13 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 county March-2020.pdf4 Dec 2021
Declaration about Commencement CertificateFile: CC Declaration.pdf2 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Report001_compressed.pdf22 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20 Q1.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20 Q2.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20 Q3.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20 Q4.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 21-22 Q1.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 21-22 Q2.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21 Q2.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21 Q3.pdf26 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21 Q4.pdf26 Oct 2021
Certificates of CA (Form 5)File: Rera Form 5 county 2021.pdf26 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Form 5 county 2021.pdf26 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -_compressed.pdf23 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate 001.pdf21 Sep 2021
OtherFile: Rera Declaration1.pdf21 Nov 2020
Certificates of CA (Form 5)File: FORM 5 2018-19.pdf20 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 2018-19.pdf20 Jul 2020
Details of encumbrancesFile: ENCUMBRANCES.pdf19 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Cert.pdf29 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert.pdf29 Dec 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf29 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-ARCHITECTS CERTIFICATE -.pdf21 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG CERTIFICATE.pdf21 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-ENGINEER'S CERTIFICATE-30-06-2018-.pdf21 Dec 2018
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE 31-03-18.pdf21 Dec 2018
Certificates of CA (Form 3)File: Form 3 30-06-18-.pdf21 Dec 2018
Certificates of CA (Form 5)File: FORM 5 17-18.pdf21 Dec 2018
Proforma of Allotment letterFile: Updated Draft as per RERA 02-05-2018.pdf21 May 2018
Proforma of Allotment letterFile: Booking Form.pdf21 May 2018
Building plan approvalFile: Revised Sanction Plan.pdf23 Apr 2018
Building Plan Approval (IOD)File: Revised Sanction Plan.pdf23 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Revised 2018.pdf23 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1-31-03-18.pdf23 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate-31-03-18.pdf23 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert.pdf23 Mar 2018
OtherFile: Row house plinth checking cert-ilovepdf-compressed.pdf23 Mar 2018
OtherFile: Row house plinth checking cert-ilovepdf-compressed.pdf23 Mar 2018
OtherFile: PMRDA Plinth checking certificate A-2 Tower.pdf23 Mar 2018
Certificates of CA (Form 3)File: Form 3 Part A-FINAL.pdf22 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf12 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf12 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate - 31-12-2017-compressed.pdf12 Feb 2018
PAN CardFile: Prasad Lifespaces LLP.pdf3 Nov 2017
Layout approvalFile: copy_of_layout_approval_and_building_plan.pdf8 Jul 2017
Building plan approvalFile: copy_of_layout_approval_and_building_plan.pdf8 Jul 2017
Copy of the legal title reportFile: Search_Report_New (1).pdf8 Jul 2017
Details of encumbrancesFile: Letter of Encumbrances.pdf8 Jul 2017
Copy of Layout Approval (in case of layout)File: copy_of_layout_approval_and_building_plan.pdf8 Jul 2017
Building Plan Approval (IOD)File: copy_of_layout_approval_and_building_plan.pdf8 Jul 2017
Declaration in FORM BFile: 6ba8a_Form_B.pdf8 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_Architect_Certificate.pdf8 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_-_2_Engineers_Certificate.pdf8 Jul 2017
Certificates of CA (Form 3)File: form_3.pdf8 Jul 2017
Proforma of Allotment letterFile: singned_proforma_of_the_allotment_letter_and_agree.pdf8 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PYRAMID COUNTY BHUKUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHUGAON13,700+ in Pune

2 kmPYRAMID COUNTY BHUKUMCompleted 13Lapsed / revoked 6Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: PRASAD LIFESPACES LLP

PRASAD LIFESPACES LLP has 1 registration on MahaRERA, including PYRAMID COUNTY BHUKUM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PYRAMID COUNTY BHUKUM is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PYRAMID COUNTY BHUKUM?

The registered promoter entity is PRASAD LIFESPACES LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PYRAMID COUNTY BHUKUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PYRAMID COUNTY BHUKUM?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PYRAMID COUNTY BHUKUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PYRAMID COUNTY BHUKUM?

The professionals named in the filing: Architect: RAHUL LONDHE; Engineer: Rajesh Nigade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PYRAMID COUNTY BHUKUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PYRAMID COUNTY BHUKUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PYRAMID COUNTY BHUKUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.