Pushpa Park
RG-MH-47614 · RERA P51800010832 · Last updated on MahaRERA portal: 8 Apr 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 38 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Pushpa Park is a Residential / Group Housing project by Vas Infrastructure Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010832 on 31 Aug 2017. Possession was promised by 15 Aug 2023 and is now 38 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NamePushpa Park
- TypeResidential / Group Housing
- Location
- S V Road
- Korakendra
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- RERA no.P51800010832
- ReraGenie IDRG-MH-47614
Builder
- NameVas Infrastructure Ltd.
- Entity typeCompany
- Managing DirectorKirti Kishore Padave
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion15 Aug 2023
- Revised completionNone
- Buildings11 building records
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Pushp Vinod 1 A B wings existing | NA | 23 | 0 | 0 | 0 | 0 |
| Pushp Vinod 2 A B wings existing | NA | 29 | 0 | 0 | 0 | 0 |
| pushp vinod 4 existing | NA | 24 | 0 | 0 | 0 | 0 |
| pushp vinod 2 wing C proposed | NA | 42 | 0 | 0 | 0 | 0 |
| PUSHP VINOD 1 WING C D PROPOSED | NA | 31 | 0 | 0 | 0 | 0 |
| ASHOPALAV EXISTING | NA | 11 | 0 | 0 | 0 | 0 |
| EXTENSION OF PUSHP VINOD 4 AND PUSHP VINOD 2 PODIUMS | NA | 11 | 0 | 0 | 0 | 0 |
| Pushp Vinod 1 Wing E Proposed upto 15th Floor | NA | 16 | 0 | 0 | 0 | 0 |
| Pushp Vinod 1 wing E proposed 16th to 30th Floor | NA | 15 | 0 | 0 | 0 | 0 |
| Pushp Vinod 1 wing E proposed 31st to 50th Floor | NA | 20 | 0 | 0 | 0 | 0 |
| Pushpa Park Parking and Public Parking Lot and Clubhouse | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building11
As on 8 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Excavation, at 0%.
Pushp Vinod 1 A B wings existing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Pushp Vinod 2 A B wings existing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
pushp vinod 4 existing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
pushp vinod 2 wing C proposed0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PUSHP VINOD 1 WING C D PROPOSED0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ASHOPALAV EXISTING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EXTENSION OF PUSHP VINOD 4 AND PUSHP VINOD 2 PODIUMS0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Pushp Vinod 1 Wing E Proposed upto 15th Floor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Pushp Vinod 1 wing E proposed 16th to 30th Floor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Pushp Vinod 1 wing E proposed 31st to 50th Floor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Pushpa Park Parking and Public Parking Lot and Clubhouse0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed1254
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Pushp Vinod 1 A B wings existing | 84 | 9 | 93 |
| Pushp Vinod 2 A B wings existing | 171 | 0 | 171 |
| pushp vinod 4 existing | 65 | 21 | 86 |
| pushp vinod 2 wing C proposed | 71 | 33 | 104 |
| PUSHP VINOD 1 WING C D PROPOSED | 1 | 0 | 1 |
| ASHOPALAV EXISTING | 0 | 22 | 22 |
| EXTENSION OF PUSHP VINOD 4 AND PUSHP VINOD 2 PODIUMS | 1 | 9 | 10 |
| Pushpa Park Parking and Public Parking Lot and Clubhouse | 767 | 0 | 767 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Jayesh V Valia HUF | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TEE ARCH |
| Partner | Role in project |
|---|---|
| Vas Infrastructure Ltd. | - |
Litigation declared15
| Case | Court | Status |
|---|---|---|
| 1481/2014 | Dindoshi Court | For NM Hearing |
| 1482/2014 | Dindoshi Court | For NM Hearing |
| 1485/2014 | Dindoshi Court | For NM Hearing |
| 1487/2014 | Dindoshi Court | For NM Hearing |
| 1535/2012 | Dindoshi Court | For Evidence before court |
| RAD 127/13/2013 | Small Cause Bandra Court | For Framing of issues |
| 1004/2016 | Metropolitan Magistrate Borivali Court | For Verification of Documents |
| 1479/2016 | Metropolitan Magistrate Borivali Court | For Verification of Documents |
| 136/2015 | CC IV Cooperative Court Bombay | For hearing |
| 0/2016 | Arbitral Proccedings pending before sole arbitrator Justice Mohit Shah | Cross |
| 1892/2019 | Dindoshi | FRO framing issues |
| 1206/2019 | high court | settelment |
| 318/2014 | Borivali court | part heard |
| 1604/2019 | high court | For quashing FIR |
| 1535/2012 | Dindoshi | Argument |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023789 | GANESH A SAWANT | VAS INFRA LIMITED | 18/03/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Feb 2023
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE PUSHP VINOD 2_0001.pdf | 8 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CERTIFICATE PUSHPAPARK LAYOUT.pdf | 21 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE PUSHP VINOD 1_0001.pdf | 21 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE PUSHP VINOD 1_0001.pdf | 21 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE PUSHP VINOD 1_0001.pdf | 21 Jan 2023 |
| OtherFile: PV4 concessions.pdf | 4 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: P V 1 C C .pdf | 20 Sep 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: P V 2 C C (2).pdf | 20 Sep 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: P V 4 C C (2).pdf | 20 Sep 2018 |
| Building plan approvalFile: PV2 IOD PLAN.pdf | 31 Jul 2017 |
| Building plan approvalFile: PV -1 IOD plan.pdf | 31 Jul 2017 |
| Building plan approvalFile: PV -1 IOD CL.pdf | 31 Jul 2017 |
| Building plan approvalFile: PV2-IOD CL.pdf | 31 Jul 2017 |
| Building plan approvalFile: PV4 IOD plan.pdf | 31 Jul 2017 |
| Layout approvalFile: Layout drw.pdf | 31 Jul 2017 |
| Layout approvalFile: LAY OUT Approval_Letter.pdf | 31 Jul 2017 |
| Building plan approvalFile: Pv 4 IOD CL.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: PV 1.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: PV 2.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: PV 4.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: PV 4 Supplemental.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Mortgage.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: 26-39.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: MORTGAGEE.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: Simple Mortgagee.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: 1-20.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: 21-40.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: 41-65.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout drw.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAY OUT Approval_Letter.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: PV -1 IOD plan.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: PV -1 IOD CL.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: PV2 IOD PLAN.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: PV2-IOD CL.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: PV4 IOD plan.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Pv 4 IOD CL.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Pv 1 Archt cert.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PV 2 Archt Cert.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Pv 4 Architect Certificate.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE PV1.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE PV2.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE PV4.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Pv 2 CA Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: PV4 CA Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: PV 1 CA Certificate.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: PV-2 Sale Agreement 1-25.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: PV-2 Sale Agreement 26-54.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: PV-2 Allotment Letter.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: PV-4 sale Agreement.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: PV-4 Allotment letter.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: PV-1 Allotment Letter.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: 1-25.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: 26-50.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: 51-69.pdf | 31 Jul 2017 |
| PAN CardFile: Vas Pan.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 1-20.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 21-40.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 41-60.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 61-80.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 81-96.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 1-25.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 26-50.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 51-70.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 71-85.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 86-95.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 1-25.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 26-50.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 51-75.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: 76-94.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Pushpa Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Korakendra6,700+ in Mumbai Suburban
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: Vas Infrastructure Ltd.
Vas Infrastructure Ltd. has 3 registrations on MahaRERA, including Pushp Vinod-3 and Pushp Vinod - 15. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Pushpa Park shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Pushpa Park is delayed beyond 15 Aug 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Pushpa Park?
The registered promoter entity is Vas Infrastructure Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Pushpa Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Pushpa Park?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Pushpa Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Pushpa Park?
The professionals named in the filing: Architect: TEE ARCH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pushpa Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback