ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Pushp Vinod-3

Registration lapsed No litigation declared Residential / Group Housing project

Pushp Vinod-3

By Vas Infrastructure Ltd.

RG-MH-19680 · RERA P51800003609 · Last updated on MahaRERA portal: 8 Apr 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
11 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

Pushp Vinod-3 is a Residential / Group Housing project by Vas Infrastructure Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003609 on 6 Aug 2017. Possession was promised by 15 Dec 2021 and is now 58 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePushp Vinod-3
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003609
  • ReraGenie IDRG-MH-19680

Builder

  • NameVas Infrastructure Ltd.
  • Entity typeCompany
  • Managing DirectorKirti Kishore Padave
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

58 months past promisethis monthRegisteredAug 2017PromisedDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Aug 2017
  • Promised completion15 Dec 2021
  • Revised completionNone
  • Buildings4 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Phase 1NA180000
Phase 2NA00000
PHASE 3NA40000
PHASE 4NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 8 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

Phase 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Phase 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PHASE 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PHASE 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered36
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,308 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9589.43
Proposed, not sanctioned4,616 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBorivali west ,Mumbai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTee Arch
PartnerRole in project
Vas Infrastructure Ltd.-

Litigation declared8

CaseCourtStatus
S 528/ 2011/2011High courtNm disposed off
184/2015/2015High courtAppeal dismissed
23/sw/2011/2011Borivali courtFor Evidence before court
3690/SW/2014/2014Borivali courtFor filling affidavit of evidence
1295 of 2015/2015Didoshi courtFor cross examination
23/2011Borivali courtEvidence
1295/2015Dindoshicomlpaince and amendment of plaint
1484/2018high courtFor admission

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501673Nikunj Prataprai TannaVas Infrastructure Ltd.24/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE PUSHP VINOD 3_0001.pdf8 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE PUSHP VINOD 3_0001.pdf21 Feb 2023
OtherFile: PV3 Concession report.pdf8 Feb 2021
Certificates of CA (Form 5)File: PV3 Form 5.pdf31 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: P V 3 Cc.pdf17 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PV 3 Architect Certificate.pdf31 Jul 2017
Building plan approvalFile: satyanarayan 9.pdf30 Jul 2017
Building plan approvalFile: satyanarayan IOD.pdf30 Jul 2017
Building plan approvalFile: satyanarayan 8.pdf30 Jul 2017
Building plan approvalFile: Satyanarayan 4.pdf30 Jul 2017
Building plan approvalFile: satyanarayan 5.pdf30 Jul 2017
Building plan approvalFile: satyanarayan 6.pdf30 Jul 2017
Layout approvalFile: satyanarayan 5.pdf30 Jul 2017
Details of encumbrancesFile: Mortgage.pdf30 Jul 2017
Details of encumbrancesFile: 26-39.pdf30 Jul 2017
Details of encumbrancesFile: MORTGAGEE.pdf30 Jul 2017
Details of encumbrancesFile: Simple Mortgagee.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: satyanarayan 5.pdf30 Jul 2017
Building Plan Approval (IOD)File: Satyanarayan 4.pdf30 Jul 2017
Building Plan Approval (IOD)File: satyanarayan 5.pdf30 Jul 2017
Building Plan Approval (IOD)File: satyanarayan 6.pdf30 Jul 2017
Building Plan Approval (IOD)File: satyanarayan 8.pdf30 Jul 2017
Building Plan Approval (IOD)File: satyanarayan 9.pdf30 Jul 2017
Building Plan Approval (IOD)File: satyanarayan IOD.pdf30 Jul 2017
Declaration in FORM BFile: form B PV 3.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate PV3.pdf30 Jul 2017
Certificates of CA (Form 3)File: PV3 CA Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: allOTMENT letter.pdf30 Jul 2017
Proforma of Allotment letterFile: Agreement for sale.pdf30 Jul 2017
Proforma of Allotment letterFile: Agreement forsale.pdf30 Jul 2017
Building plan approvalFile: satyanarayan 2.pdf29 Jul 2017
Building plan approvalFile: satyanarayan 3.pdf29 Jul 2017
Building plan approvalFile: satyanarayan IOD.pdf29 Jul 2017
Building Plan Approval (IOD)File: satyanarayan IOD.pdf29 Jul 2017
Building Plan Approval (IOD)File: satyanarayan 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: satyanarayan 3.pdf29 Jul 2017
PAN CardFile: Vas Pan.pdf24 Jul 2017
Copy of the legal title reportFile: Title report.pdf22 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pushp Vinod-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmPushp Vinod-3Completed 160Lapsed / revoked 94Other 219Dot size: filed unitsN

Filed coordinates, straight-line distance. 473 registered projects within 2 km.

Builder: Vas Infrastructure Ltd.

Vas Infrastructure Ltd. has 3 registrations on MahaRERA, including Pushp Vinod-3 and Pushp Vinod - 15. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Pushp Vinod-3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Pushp Vinod-3 is delayed beyond 15 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pushp Vinod-3?

The registered promoter entity is Vas Infrastructure Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pushp Vinod-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pushp Vinod-3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pushp Vinod-3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pushp Vinod-3?

The professionals named in the filing: Architect: Tee Arch. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pushp Vinod-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pushp Vinod-3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pushp Vinod-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.