ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / PURANIK CITY SECTOR 3

Registered No litigation declared Others project

PURANIK CITY SECTOR 3

By Puranik Builders Limited

RG-MH-95993 · RERA P52000017953 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2029Possession promisedno revision filed
18 of 110Construction stages doneacross 10 buildings; furthest along: Basement (if any), 90%
180 of 243Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

PURANIK CITY SECTOR 3 is a Others project by Puranik Builders Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000017953 on 28 Sep 2018. Possession is promised by 1 Sep 2029. 63 of the 243 units on this registration are recorded sold or booked, and 18 of 110 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NamePURANIK CITY SECTOR 3
  • TypeOthers
  • Location
    • Village Stree
    • Pimploli Karjat
    • pimploli bk
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000017953
  • ReraGenie IDRG-MH-95993

Builder

  • NamePuranik Builders Limited
  • Entity typeCompany
  • CINU99999MH1990PLC056451
  • GSTIN27AABCP0109R1Z9
  • Managing DirectorShailesh Gopal Puranik
  • DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik
  • Other registrations19 more →
  • Completed5 of 20
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredSep 2018PromisedSep 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Sep 2018
  • Promised completion1 Sep 2029
  • Revised completionNone
  • Buildings10 building records
  • Documents filed89 files

Current status

26%63 of 243 units booked

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JACNA54351348
GBCNA87591069
JBNA8763063
PBNA8763063
HB 1NA80000
HB 2NA80000
LB 1NA80000
LB 2NA80000
LB 3NA80000
MANA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Basement (if any), at 90%.

JAC20%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth60%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GBC28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JB25%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PB27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HB 127%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HB 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LB 127%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LB 224%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LB 327%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,182 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mahesh Padalkar and other 3Thane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI23410.69
Proposed, not sanctioned19,976 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHighstreet Mall, Kapurbawadi Junction, Ghodbunder Road, Thane

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilpa Associates
EngineerM/s. Epicons Consultants Pvt Ltd
EngineerSagar Abnave
EngineerKedar Yernalkar
Chartered AccountantVMD and Company
Chartered AccountantHDO & Associates
Chartered AccountantVMd & Co
PartnerRole in project
Puranik Builders Limited-

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC12500183Mr. Mahesh Babanrao DhumnePuranik Builders Limited20/01/2025
CC12500047SANKET VASANT DHAWANPuranik Builders Limited05/01/2025
CC12500824Laxmikant Sadashiv LadPuranik Builders Limited10/03/2025
CC12503367DEEPAK SHASHIKANT TAMHANEPuranik Builders Limited21/09/2025
CC12600362Shalini JajodiaPuranik Builders Limited19/01/2026
CC12600364Sulochana AgarwalPuranik Builders Limited19/01/2026
CC12603463Amar SantPuranik Builders Limited05/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Sep 2029

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Neral 3.pdf20 Apr 2026
Form 2File: Form 2.pdf20 Apr 2026
Form 3File: Form 3.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sales Data.pdf20 Apr 2026
Form 1File: Architects cert Sector 03.pdf21 Jan 2026
Form 2File: Form 2 Engineers Certificate Neral Sec 3 31122025.pdf21 Jan 2026
Form 3File: CA Certificates - Neral Project -Sector III Final.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory_compressed.pdf21 Jan 2026
Form 1File: 30062025 Architect's cert_Sector_03_PB,LB1,HB1,JBC,LB2,LB3,JB,JAC.pdf16 Nov 2025
Form 2File: Form 2 Engineers Certificate Neral Sec 3_.pdf16 Nov 2025
Form 3File: CA Certificates - Neral_Project_Sector_III 30062025.pdf16 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Puranik City Neral - Sector 3.pdf16 Nov 2025
Form 1File: 30092025Architect's cert_Sector_03_PB,LB1,HB1,JBC,LB2,LB3,JB,JAC.pdf16 Nov 2025
Form 2File: Form 2 Engineers Certificate Neral Sec 3_30092025.pdf16 Nov 2025
Form 3File: CA Certificates - Neral_Project_Sector_III.pdf16 Nov 2025
Disclosure of Sold and Booked InventoryFile: Neral Setor 3_0001.pdf16 Nov 2025
Form 5 (FY 2024-2025)File: Rera Form 5 - Puranik City Sector 3 - sign.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PC Neral Sector 3.pdf20 Apr 2025
Certificates of CA (Form 3)File: CA Certificates - Neral_Project sector 3.pdf20 Apr 2025
Certificates of CA (Form 3)File: CA Certificates - Neral_Project_31122024-Sector_III_compressed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3_3092024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3_311224.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Puranik City Neral Sector 3 Year 23-24.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PC Neral Sector 3.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PC Neral Sector 3.pdf20 Oct 2024
Certificates of CA (Form 3)File: CA Certificates - Neral_Project 30092024 Sector_III.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puranik City Sector 3_Singed.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3 300624.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024 Architects Certificate FORM-1 PC Neral Sector 3.pdf20 Jul 2024
Certificates of CA (Form 3)File: Puranik City sector 3_compressed (1).pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PC Neral Sector 3.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3.pdf29 Apr 2024
Certificates of CA (Form 3)File: Neral 3_compressed.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PC Neral Sector 3.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3.pdf20 Jan 2024
Certificates of CA (Form 3)File: Neral 3.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase-3_Architect Certificate.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3 _30092023.pdf16 Nov 2023
Certificates of CA (Form 3)File: Neral-3 79.pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Puranik City Sector 3 - signed final.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Puranik City Neral-Sector 2 -HBC1.PDF14 Aug 2023
Disclosure of sold/ booked inventoryFile: Sector 2 HBC1.PDF14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Puranik City Neral Sector 3.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sector 3.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3 31032023.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3 30062023.pdf7 Aug 2023
Certificates of CA (Form 3)File: HDO - PC SECTOR III - 027.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector-3_.pdf2 May 2023
Certificates of CA (Form 3)File: Neral 3_compressed.pdf2 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sector 3.pdf25 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3 31122022.pdf25 Mar 2023
Disclosure of sold/ booked inventoryFile: Puranik City Neral-Sector-3-GBC final.pdf25 Mar 2023
Certificates of CA (Form 3)File: Neral 3 Dec 2022.pdf31 Jan 2023
Certificates of CA (Form 3)File: CA Certificates Neral Project 31032019 Sector III.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral III 30062019.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral III 30092019.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral Sector III 31122019.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral Project Sector III March 20.pdf11 Jan 2023
Certificates of CA (Form 3)File: CA Certificates Neral Project 30092020 Sector III.pdf11 Jan 2023
Certificates of CA (Form 3)File: CA Certificates Puranik City Sector III 31122020.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral Sector III 31032021.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral III 30062021.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral III 30092021.pdf11 Jan 2023
Certificates of CA (Form 3)File: Neral III 31122021.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR 3.pdf5 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3.pdf5 Jan 2023
Certificates of CA (Form 3)File: CA Certificates Neral Project 310322 Sector III.pdf5 Jan 2023
Certificates of CA (Form 3)File: PURANIK CITY SECTOR III PBPL UPLOAD.pdf5 Jan 2023
Certificates of CA (Form 3)File: CA Certificates Nera Sector III.pdf5 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: PC Sector 3.pdf5 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Neral 3.pdf1 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR 3.pdf3 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR 3.pdf3 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3.pdf3 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Neral Sec 3.pdf7 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Puranik City 3.pdf30 Sep 2021
Details of Restarting of Construction work post lockdownFile: Neral Sector 3 - REPORT.pdf14 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: PURANIK CITY SECTOR 3.pdf27 Jan 2020
Declaration in FORM BFile: PC SECTOR 3.PDF26 Sep 2018
Details of encumbrancesFile: Puranik City-Sector-3.PDF11 Sep 2018

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hometown Part CKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2016Late, Apr 2017
Aldea AnnexoAldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045129CompletedDec 2016Late, Apr 2017
Hometown Part BKasarvadavali Ghodbunder Road Thane west 400615159CompletedAug 2014Late, Jan 2015
Hometown Part AKasarvadavali Ghodbunder Road Thane west 400615176CompletedJun 2013Late, Nov 2013
Puranik City Part AKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2012Late, Feb 2013
Puranik City Part BKasarvadavali Ghodbunder Road Thane west 40061580CompletedDec 2011Late, Apr 2012

How this compares with Raigarh

26%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PURANIK CITY SECTOR 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimploli Karjat5,900+ in Raigarh

2 kmPURANIK CITY SECTOR 3Completed 21Lapsed / revoked 38Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: Puranik Builders Limited

Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PURANIK CITY SECTOR 3 is delayed beyond 1 Sep 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PURANIK CITY SECTOR 3?

The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PURANIK CITY SECTOR 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PURANIK CITY SECTOR 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PURANIK CITY SECTOR 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PURANIK CITY SECTOR 3?

The professionals named in the filing: Architect: Vastushilpa Associates; Engineer: M/s. Epicons Consultants Pvt Ltd; Engineer: Sagar Abnave; Engineer: Kedar Yernalkar; Chartered Accountant: VMD and Company; Chartered Accountant: HDO & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PURANIK CITY SECTOR 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PURANIK CITY SECTOR 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PURANIK CITY SECTOR 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.