Puneet Kanchanganga Phase One Floor 0 to Floor 25
RG-MH-96090 · RERA P51700011319 · Last updated on MahaRERA portal: 3 Mar 2021
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Puneet Kanchanganga Phase One Floor 0 to Floor 25 is a Others project by Puneet Developers in Thane, Maharashtra, registered with MahaRERA as P51700011319 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2020. The completion date has moved by 24 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NamePuneet Kanchanganga Phase One Floor 0 to Floor 25
- TypeOthers
- Location
- Thane (M Corp.)
- Thane
- 400606
- Pincode400606
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700011319
- ReraGenie IDRG-MH-96090
Builder
- NamePuneet Developers
- Entity typePartnership
- Other registrations6 more →
- Completed7 of 7
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Aug 2017
- Promised completion30 Dec 2020
- Revised completionRevised to 30 Dec 2020 (originally 31 Dec 2018)
- Buildings2 building records
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kanchanganga Tower | NA | 27 | 0 | 0 | 0 | 0 |
| Kanchanganga Tower | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Kanchanganga Tower91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Kanchanganga TowerNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities25
As on 3 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Aluminium Sliding Windows | Yes | 100% |
| Car Parking Tower | Yes | 100% |
| Common Area CCTV | Yes | 100% |
| Elevators | Yes | 100% |
| Entrance Lobby | Yes | 100% |
| Video Door Phone | Yes | 100% |
| Solar Water Heater System | Yes | 100% |
| Water Filter | Yes | 100% |
| Heath Care Center | Yes | 100% |
| SS Railing | Yes | 100% |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Kanchanganga Tower | 71 | 71 |
| Kanchanganga Tower | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Subhash Patil & Associates |
| Engineer | ISHWAR MURGOD |
| Chartered Accountant | S S MOTWANI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Puneet Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction of the project is completed. We have already proceeded with required NOCs/Permissions/Undertaking for obtaining Occupation Certificate (OC) for our project “Shree Kanchanganga Tower” (Gr. +27 floors) from Thane Municipal Corporation, at Thane and our application for OC is now pending before Thane Municipal Corporation. We may get an Occupation Certificate at any time within the applied extension period. As per the provision u/s. 7(3) of the RERA Act the society of the allottees in the said project has permitted us to take the extension period of time of six months and has pass
Reason as filed by the promoter1.Pursuant to a Development Agreement, the Applicant alongwith the Society is a promotor of the project. Presently, the Applicant has completed construction of all G+27 Floors with all necessary amenities making the building habitable. The Applicant prays that the registration of the project be extended to 31.12.2019 in view of the following circumstances beyond the Applicant’s control: a.The Corporation (“TMC”) had sanctioned plans of G+27 floors. TMC issued a restricted Commencement Certificate (“CC”) dated 11.11.2014 for G+25 upper floors only. TMC issued further CC only on 04.12.2017. The
Litigation declared1
| Case | Court | Status |
|---|---|---|
| CCT 86/2013/2013 | Court of Cooparative Judge Thane | Disposed |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023897 | jagdish gawade | Puneet Developers | 10/04/2018 |
| CC006000000055642 | BABU POZHOPARAMBIL | PUNEET DEVELOPERS | 03/08/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Feb 2021
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Ph 1 30th Dec 2020.pdf | 3 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 -1.pdf | 26 Feb 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.PDF | 24 Feb 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Kanchanganga.PDF | 23 Feb 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 15022021.pdf | 20 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Puneet Dev Form 5 Phase 1 Kanganga 2019.pdf | 26 Oct 2020 |
| Details of Restarting of Construction work post lockdownFile: RERA Details of restarting constrction works during covid- Kanchanganga.pdf | 5 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate.pdf | 12 Dec 2019 |
| Status of ConveyanceFile: deed of sale.pdf | 12 Dec 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kanchangnga- set - updated current status of OC_compressed.pdf | 28 Nov 2019 |
| Certificates of CA (Form 5)File: Puneet Dev Form 5 Phase 1 Kanganga 2019.pdf | 1 Oct 2019 |
| Details of encumbrancesFile: index 2-Indenture mortgage deed fullerton _3-3.pdf | 15 Mar 2019 |
| OtherFile: Index Supplementary Agreement Kanchanganga.pdf | 15 Mar 2019 |
| Certificates of CA (Form 5)File: kanchanganga phase I.pdf | 31 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC dec 2017.pdf | 24 Dec 2017 |
| Layout approvalFile: Part 3.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 2.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 4.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 2.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 3.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 3.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 4.pdf | 31 Jul 2017 |
| Layout approvalFile: Part 2.pdf | 31 Jul 2017 |
| Layout approvalFile: part 4.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 2.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 3.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 4.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 2.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 3.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 4.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 2.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Part 3.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: part 4.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Part 1.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Part 1.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC NEW.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate PDF.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Ca Certifacte Phase1.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: LOI.pdf | 31 Jul 2017 |
| OtherFile: Declaration of Authority Signatory.pdf | 31 Jul 2017 |
| OtherFile: Mhada Offer Letter.pdf | 31 Jul 2017 |
| OtherFile: Part 1.pdf | 31 Jul 2017 |
| OtherFile: Part 1.pdf | 31 Jul 2017 |
| OtherFile: Part 2.pdf | 31 Jul 2017 |
| OtherFile: 7 12 Extract.pdf | 31 Jul 2017 |
| OtherFile: Part 1.pdf | 31 Jul 2017 |
| OtherFile: Fedbank Mortgage Deed.pdf | 31 Jul 2017 |
| OtherFile: Loan Letter From CA.pdf | 31 Jul 2017 |
| OtherFile: Public Liability PDF.pdf | 31 Jul 2017 |
| OtherFile: Society Reg Certificate.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD.pdf | 30 Jul 2017 |
| PAN CardFile: Companmy pan card.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Part 1.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Part 2.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Part 1.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Part 2.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: lawyer's certificate.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 0 to 25.pdf | 30 Jul 2017 |
| OtherFile: SBI Bank.pdf | 30 Jul 2017 |
| OtherFile: ICICI Bank.pdf | 30 Jul 2017 |
| OtherFile: axis.pdf | 30 Jul 2017 |
| OtherFile: Part 1.pdf | 30 Jul 2017 |
| OtherFile: Part 2.pdf | 30 Jul 2017 |
| OtherFile: Part 3.pdf | 30 Jul 2017 |
| OtherFile: Part 4.pdf | 30 Jul 2017 |
| OtherFile: Part 5.pdf | 30 Jul 2017 |
| OtherFile: Part 6.pdf | 30 Jul 2017 |
| OtherFile: Part 7.pdf | 30 Jul 2017 |
| OtherFile: Mhada NOC.pdf | 30 Jul 2017 |
| OtherFile: Tree NOC.pdf | 30 Jul 2017 |
| OtherFile: SWD.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep Puneet Kanchanganga Phase One Floor 0 to Flo on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Thane (M Corp.)7,600+ in Thane
Filed coordinates, straight-line distance. 313 registered projects within 2 km.
Jai Bhavani Chs Ltd SRA Project
HEER REALTY VENTURES PVT LTD
Glorio Grand Central
Ekdant Constructions and Developers Privat
Veer Hills
Yash Infra
L and T Realty Evara Heights T1
ELANTE PROPERTIES PRIVATE LIMITED
Tenx District 9 Tower B
Raymond Realty Limited
MAHAVIR VISTA AND VISTA POINT
VINAYAK DEVELOPERS
See every Thane project, with the district possession charts
Builder: Puneet Developers
Puneet Developers has 7 registrations on MahaRERA, including Puneet Kanchanganga Phase One Floor 0 to Floor 25 and Puneet Kanchanganga Phase 2 Floor 26 to Floor 28. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Puneet Kanchanganga Phase One Floor 0 to Floor 25 is delayed beyond 30 Dec 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Puneet Kanchanganga Phase One Floor 0 to Floor 25?
The registered promoter entity is Puneet Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Puneet Kanchanganga Phase One Floor 0 to Floor 25?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Puneet Kanchanganga Phase One Floor 0 to Floor 25?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Puneet Kanchanganga Phase One Floor 0 to Floor 25?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Puneet Kanchanganga Phase One Floor 0 to Floor 25?
The professionals named in the filing: Architect: Subhash Patil & Associates; Engineer: ISHWAR MURGOD; Chartered Accountant: S S MOTWANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Puneet Kanchanganga Phase One Floor 0 to Floor 25?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.