Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
73 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Provident Kenvista T2 is a Residential / Group Housing project by Provident Housing Limited in Pune, Maharashtra, registered with MahaRERA as P52100025342 on 30 Apr 2020. Possession is promised by 30 Sep 2028. 15 of the 88 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameProvident Kenvista T2
  • TypeResidential / Group Housing
  • Location
    • -
    • kondhwa BK
    • Haveli
    • Pune
    • 000000
  • Pincode000000
  • RERA no.P52100025342
  • ReraGenie IDRG-MH-16239

Builder

  • NameProvident Housing Limited
  • Entity typeCompany
  • DirectorNANI CHOKSEY
  • Managing DirectorASHISH PURAVANKARA
  • Other registrations14 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2020PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Apr 2020
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

17%15 of 88 units booked

Figures as on 19 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kenvista Tower 2NA242288088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Kenvista Tower 2: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Open Space46

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,603 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Global Riviera ProjectsPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI8045.0
Proposed, not sanctioned8,045 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM G Road Branch Bangalore

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA
EngineerANA
Chartered AccountantM Padmanabha Bhat
Chartered AccountantVDSR & CO LLP
PartnerRole in project
Provident Housing Limited-

Litigation declared1

CaseCourtStatus
449/2016Pune District & Session CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form -1 30_6_2025 Tower _T2 Punrvankara.pdf19 Sep 2025
Form 2File: FORM-2, EC_KENVISTA_TOWER T2_2025-26_Q1.pdf19 Sep 2025
Form 3File: Final_Kenvista ECRP - T2 Form 3_compressed.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: T2 Sold and Unsold.pdf19 Sep 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kenvista T2 Form 2A 23-24.pdf30 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T2 Form 2.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T2 Archi Q4.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T2 CA Q4_compressed.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T2 Engi Q4.pdf19 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T2.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T2.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Kenvista T2-Q4.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, EC_KENVISTA_TOWER T2_2024-25_Q1.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, EC_KENVISTA_TOWER T2_2024-25_Q2.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2, EC_KENVISTA_TOWER T2_2024-25_Q3.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 30_6_2024 Tower _T2 Punrvankara.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T2.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower T2 Q3.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kenvista T2 Dec sd.pdf1 Jun 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (5).pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kenvista Tower-2_Sep-23_sd.pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Provident Kenvista T2.pdf17 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2 _30-09-2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Progress certificate Kenvista Q1 TOWER T2 _30-06-2023.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kenvista_Tower-2_Form-3_30-06-2023_sd.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kenvista_Tower-2_Form-3_31-03-2023_sd.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T1 _30-06-2021.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2 _30-06-2021.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2 _30-09-2021.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2 _31-12-2021.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T3 _31-12-2021.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2 _31-03-2022.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2_30-06-2022.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T2_04-01-2023.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER T1_31-03-2023.pdf21 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 T-2.pdf26 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT _ KENVISTA T2.pdf21 Nov 2022
Disclosure of sold/ booked inventoryFile: T2 sold and Unsold.pdf21 Nov 2022
Declaration about Commencement CertificateFile: Declaration Commencement.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: NA.pdf14 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Declaration.pdf14 Jul 2022
CERSAI detailsFile: CERSAI.pdf14 Jul 2022
Disclosure of sold/ booked inventoryFile: T2 Sold and Unsold Inventory Details_compressed.pdf14 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: NA.pdf14 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: NA.pdf14 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NA.pdf14 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 T-2.pdf14 Jul 2022
Building plan approvalFile: Kenvista Plan.pdf13 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Kenvista Plan.pdf13 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Jun 2022
Layout approvalFile: Layout Plan.PDF23 Apr 2020
Layout approvalFile: Commencement Certificate.pdf23 Apr 2020
Building plan approvalFile: NA.pdf23 Apr 2020
PAN CardFile: PHL PAN.pdf23 Apr 2020
Copy of the legal title reportFile: LSR pages 01_15.pdf23 Apr 2020
Copy of the legal title reportFile: LSR pages 16_30.pdf23 Apr 2020
Copy of the legal title reportFile: LSR pages 31_45.pdf23 Apr 2020
Copy of the legal title reportFile: LSR pages 46_60.pdf23 Apr 2020
Copy of the legal title reportFile: LSR pages 61_76.pdf23 Apr 2020
Details of encumbrancesFile: NA.pdf23 Apr 2020
Copy of Layout Approval (in case of layout)File: Layout Plan.PDF23 Apr 2020
Copy of Layout Approval (in case of layout)File: Commencement Certificate.pdf23 Apr 2020
Building Plan Approval / NA Order for plotted developmentFile: NA.pdf23 Apr 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Apr 2020
Declaration in FORM BFile: Form B_Upload (Kenvista).pdf23 Apr 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA_CA Certificate.pdf23 Apr 2020
Proforma of Allotment letterFile: Proforma Agreement and Allotment.pdf23 Apr 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Provident Sunworth 1Nice Mysore Road Venkatapura Kengeri Hobli Bengaluru Karnataka 5600601,440CompletedNov 2015Nov 2015

How this compares with Pune

17%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Provident Kenvista T2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: Provident Housing Limited

Provident Housing Limited has 15 registrations on MahaRERA, including Provident Kenvista T1 and Provident Kenvista T2. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Provident Kenvista T2 is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Provident Kenvista T2?

The registered promoter entity is Provident Housing Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Provident Kenvista T2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Provident Kenvista T2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Provident Kenvista T2?

The professionals named in the filing: Architect: ANA; Engineer: ANA; Chartered Accountant: M Padmanabha Bhat; Chartered Accountant: VDSR & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Provident Kenvista T2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Provident Kenvista T2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Provident Kenvista T2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.