PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI

By SURBHI MIDAS CONSTRUCTION

RG-MH-05924 · RERA P51800052303 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 24 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 90%
27 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI is a Others project by SURBHI MIDAS CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052303 on 9 Aug 2023. Possession is promised by 31 May 2027. The completion date has moved by 24 months from the original filing. 5 of the 32 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NamePROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI
  • TypeOthers
  • Location
    • SHIMPOLI CROSS ROAD NO 1
    • SHIMPOLI
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052303
  • ReraGenie IDRG-MH-05924

Builder

  • NameSURBHI MIDAS CONSTRUCTION
  • Entity typePartnership
  • GSTIN27AEUFS0242Q1Z9
  • PartnersMITESH BHIKUBHAI SHAH, PRANAV PRAKASH PENKAR
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2023First promiseMay 2025Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed81 files

Current status

16%5 of 32 units booked
96.5%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAINA101031132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes-
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Open Space20

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area507 sq m
Land owned byThe promoter
Named landownersNone
Declared on18 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1165.71
Proposed, not sanctioned1,166 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTILAK CHOWK KALYAN MAHARASHTRA PIN 421301
Estimated costRs 4.25 cr
Cost incurredRs 4.10 cr
Work done96.47%
BuildingWingEstimatedIncurred
PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAINARs 4.25 crRs 4.10 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEHUL J KANAKIA
EngineerUNISTEPS CONSULTING PVT LTD
EngineerUNISTEPS CONSULTING
Chartered AccountantSK MUNDRA ASSOCIATES CA sunil Mundra
Chartered AccountantINANI & ASSOCIATES ANKIT INANI
Chartered AccountantSUKHWAL&ASSOCIATES RAHUL SUKHWAL
Chartered AccountantRAHUL SUKHWAL
Chartered AccountantSUNIL MUNDRA
PartnerRole in project
SURBHI MIDAS CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04072501949May 2025 → May 2026

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow. 3) Work Suspension Due to Pollution control Measures by BMC for 45 Days 4) Major road repair and RCC construction work undertaken by BMC which affect movement of vehicles which supply material to Site

EA06072621679May 2025 → May 2027

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow. 3) Due to changes and alterations in the sale units/layout, revised concessions and approvals are required from the Municipal Commissioner. Additionally, certain finishing works remain pending because of the limited plot area, which creates challenges in storing and handling construction materials, thereby affecting the progress of the remaining work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate 01-01-2026 to 31-03-2026 Q4.pdf22 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf22 Jun 2026
Withdrawal Update Form 3File: Signed Deepak Mahal Q4 25-26.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate 01-10-2025 to 31-12-2025 Q3.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 - Architect Certificate 01-01-2026 to 31-03-2026 Q4.pdf15 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf15 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf15 Jun 2026
Withdrawal Update Form 3File: Signed Deepak Mahal Q3 25-26.pdf15 Jun 2026
Withdrawal Update Form 3File: Signed Deepak Mahal Q4 25-26.pdf15 Jun 2026
Withdrawal Update Form 1File: FORM 1 25-26 Q2.pdf5 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf5 Jun 2026
Withdrawal Update Form 3File: FORM 3 C.pdf5 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2A 23-24.pdf5 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A 24-25.pdf5 Jun 2026
Commencement certificateFile: DM CC.pdf25 Jun 2025
Form 3File: Form 3 Q4 Final CA Certificate DM WITH SIGN 2.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DM Q3 FORM 1 SIGNATURE.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Q3 - DM Certificate FY 24-25 MITESH SIR SIGHNED.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DM FORM 2 MITESH SIR SIGNED.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEEPAK MAHAL (1).pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 001 DM Form 1 Q2 Fy 24-25 Signed.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 002 DM Form 2 Q2 FY 24-25 Signed.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DM FORM 3 Q2 FY 24-25.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: DM Form 5 FY 23-24_compressed.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DM QTR 2 23-24 FORM 1.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DM QTR 3 23-24 FORM 1.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DM QTR 4 23-24 FORM 1.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DM QTR 1 24-25 FORM 1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DM QTR 4 23-24 FORM 3_1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DM QTR 1 24-25 FORM 3 1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DM QTR 3 23-24 FORM 3_1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DM QTR 2 23-24 FORM 3_1.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DM QTR 2 23-24 FORM 2.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DM QTR 3 23-24 FORM 2.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DM QTR 4 23-24 FORM 2.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DM QTR 1 24-25 FORM 2.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Surbhi Midas construction Annexure -C Form -2 A.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Rera Certificate Form 3 signed final.pdf7 Aug 2024
Details of encumbrances concerned to FinanceFile: DM Encumrances Finance (1).pdf27 Jul 2023
Details of encumbrances concerned to LegalFile: DM Encumrances Finance (1).pdf27 Jul 2023
CERSAI detailsFile: DM CERSAI DECLARATION.pdf27 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 001 DM CA CERTFICATE FORM NO 3.pdf27 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DM FORMAT A BANK.pdf27 Jul 2023
CERSAI detailsFile: CERSAI DM.pdf19 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Pranav Prakash Penkar.pdf20 Jun 2023
Copy of the legal title reportFile: Adv Urmila Jadhav_Legal Report_Deepak Mahal 1_compressed.pdf14 Jun 2023
Details of encumbrances concerned to FinanceFile: DM NO ENCUMBRANCE LEGAL.pdf10 Jun 2023
Details of encumbrances concerned to LegalFile: DM NO ENCUMBRANCE LEGAL.pdf10 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DM DIN OBJECTION_compressed.pdf10 Jun 2023
Proforma of Agreement for saleFile: DM AFS (1).pdf10 Jun 2023
Proforma of Allotment letterFile: DM Allotment Letter order no 30.pdf10 Jun 2023
Deviation Report with respect to Allotment letterFile: DM NO DEVATION ALLOTMENT.pdf10 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DM NO DEVATION AGREEMENT.pdf10 Jun 2023
Copy of the legal title reportFile: Adv Urmila Jadhav_Legal Report_Deepak Mahal 1_compressed.pdf3 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 2377523_FirstCC_signed.pdf27 May 2023
Declaration about Commencement CertificateFile: DM Declaration about CC.pdf27 May 2023
Layout approvalFile: DM-CTS PLAN.pdf19 May 2023
Building plan approvalFile: 2370744_IOD_signed deepak mahal.pdf19 May 2023
Building plan approvalFile: Deepak Mahal,Drawing,IOD.pdf19 May 2023
PAN CardFile: Pancard Surbhi Midas Construction.pdf19 May 2023
Copy of Layout Approval (in case of layout)File: DM-CTS PLAN.pdf19 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 2370744_IOD_signed deepak mahal.pdf19 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Deepak Mahal,Drawing,IOD.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 1 to 20.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 21 to 41.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 42-57.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 58-68.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 69-79.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 80-90.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 91-100.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 101-110.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 111-123.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 124-135.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 136-148.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 149-160.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 161-167.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 168-175.pdf19 May 2023
Declaration in FORM BFile: DM Deed Of Conveyance PDF 176-180.pdf19 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DAHISAR UDAYRAJ CHSLPLOT NO 10 PARBAT NAGAR27CompletedDec 2018Late, May 2023

How this compares with Mumbai Suburban

16%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIMPOLI6,700+ in Mumbai Suburban

2 kmPROPOSED RED ON PLOT BEACompleted 157Lapsed / revoked 91Other 218Dot size: filed unitsN

Filed coordinates, straight-line distance. 466 registered projects within 2 km.

Builder: SURBHI MIDAS CONSTRUCTION

SURBHI MIDAS CONSTRUCTION has 1 registration on MahaRERA, including PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI?

The registered promoter entity is SURBHI MIDAS CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AEUFS0242Q1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI?

The professionals named in the filing: Architect: MEHUL J KANAKIA; Engineer: UNISTEPS CONSULTING PVT LTD; Engineer: UNISTEPS CONSULTING; Chartered Accountant: SK MUNDRA ASSOCIATES CA sunil Mundra; Chartered Accountant: INANI & ASSOCIATES ANKIT INANI; Chartered Accountant: SUKHWAL&ASSOCIATES RAHUL SUKHWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.