ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Project XYZ Phase 1

De-registered No litigation declared Residential / Group Housing project

Project XYZ Phase 1

By MANTRA SKY TOWER

RG-MH-22284 · RERA P52100031019 · Last updated on MahaRERA portal: 7 May 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Project XYZ Phase 1 is a Residential / Group Housing project by MANTRA SKY TOWER in Pune, Maharashtra, registered with MahaRERA as P52100031019 on 29 Sep 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameProject XYZ Phase 1
  • TypeResidential / Group Housing
  • Location
    • AKURDI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411035
  • Pincode411035
  • RERA no.P52100031019
  • ReraGenie IDRG-MH-22284

Builder

  • NameMANTRA SKY TOWER
  • Entity typePartnership
  • PartnersMANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH DIRECTOR VISHAL NANDLAL GUPTA, ROHIT GHANSHYAM GUPTA
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredSep 2021PromisedDec 2025

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING DNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING D: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Open Space14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,191 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8764.59
Proposed, not sanctioned8,765 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSATARA ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Thakur
EngineerRajesh Mankani -Design Werkz
Chartered AccountantSHRUTI AGARWAL
PartnerRole in project
MANTRA SKY TOWER-

Litigation declared1

CaseCourtStatus
97/2016/2016DISTRICT PUNEDisposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jan 2023

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sky tower ph 1.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA sky tower ph 1.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certi_Sky Tower_Phase 1.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi_Sky Tower_Phase 1.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: 2849_001-1.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-2.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-3.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-4.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-5.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-6.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-7.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-7.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-8.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: 2849_001-9.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-01-22_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-04-22_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-07-22_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-10-22_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-01-23_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-04-23_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-07-23_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03-01-24_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-10-21_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-01-22_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-04-22_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-07-22_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-10-22_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-01-23_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-04-23_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-07-23_0001.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18-01-24_0001.pdf2 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 15-04-22_0001.pdf2 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 15-04-23_0001.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-10-21_0001_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-01-22_0001_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-04-22_0001_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-07-22_0001_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-10-22_0001_compressed (1).pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-01-23_0001_compressed (1).pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-04-23_0001_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-07-23_0001_compressed.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10-01-24_0001_compressed.pdf2 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22_0001.pdf2 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23_0001.pdf2 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23_0001.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sky Tower_Phase 1_Arch Certificate.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sky Tower_Phase 1_Engg Certificate.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sky Tower_Phase 1_ Quality Certificate.pdf1 Nov 2023
Disclosure of sold/ booked inventoryFile: Sky Tower_Phase 1_ Sold Unsold.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sky Tower_Phase 1_ CA Certificate.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Cancellation_Sky tower_phase 1_RERA.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Cancellation_Sky tower_phase 1_RERA.pdf27 Jan 2023
PAN CardFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Details of encumbrances concerned to FinanceFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Details of encumbrances concerned to LegalFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Disclosure of sold/ booked inventoryFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
CERSAI detailsFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Proforma of Agreement for saleFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Status of ConveyanceFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Foreclosure of the ProjectFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Deviation Report with respect to Allotment letterFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Other - LegalFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Other - FinanceFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Other - TechnicalFile: Cancellation_Sky tower_phase 1_RERA.pdf25 Jan 2023
Copy of the legal title reportFile: titile report.pdf14 Sep 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Project XYZ Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AKURDI13,700+ in Pune

Builder: MANTRA SKY TOWER

MANTRA SKY TOWER has 3 registrations on MahaRERA, including Project XYZ Phase 1 and Project XYZ Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Project XYZ Phase 1 shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Project XYZ Phase 1 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Project XYZ Phase 1?

The registered promoter entity is MANTRA SKY TOWER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Project XYZ Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Project XYZ Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Project XYZ Phase 1?

The professionals named in the filing: Architect: Mahendra Thakur; Engineer: Rajesh Mankani -Design Werkz; Chartered Accountant: SHRUTI AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Project XYZ Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Project XYZ Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Project XYZ Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.