Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 2Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Prodigar is a Plotted project by Prodigar Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000030283 on 15 Aug 2021. Possession is promised by 31 Dec 2026. 0 of the 2 units on this registration are recorded sold or booked.

At a glance

Project

  • NameProdigar
  • TypePlotted
  • Location
    • Dasturi Garmal Road
    • Adoshi
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • RERA no.P52000030283
  • ReraGenie IDRG-MH-30395

Builder

  • NameProdigar Developers Private Limited
  • Entity typeCompany
  • Managing DirectorsAnant Vasantrao Palkar, Sachin Kanayalal Bhatia
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Aug 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed64 files

Current status

0%0 of 2 units booked

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,624 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI397.5
Proposed, not sanctioned398 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPowai Hiranandani Gardens Mumbai 400076

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwaroop Revankar
EngineerSanjiv Chaudhari
Chartered AccountantManoj Shah
PartnerRole in project
Prodigar Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: ARC CER PRODIGAR.pdf17 Apr 2026
Form 2File: ENG CER PRODIGAR.pdf17 Apr 2026
Form 3File: FORM 3 Prodigar.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISC SOLD -UNSOLD PRODIGAR.pdf17 Apr 2026
Form 1File: ARC CER PRODIGAR.pdf16 Jan 2026
Form 2File: ENG CER PRODIGAR.pdf16 Jan 2026
Form 3File: FORM 3 CA Cert Prodigar.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISC SOLD UNSOLD PRODIGAR.pdf16 Jan 2026
Form 1File: ARC CER PRODIGAR.pdf15 Oct 2025
Form 2File: ENG CER PRODIGAR.pdf15 Oct 2025
Form 3File: CA CER PRODIGAR.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE PRODIGAR.pdf15 Oct 2025
Form 1File: ARC CER PRODIGAR.pdf17 Jul 2025
Form 2File: ENG CER PRODIGAR.pdf17 Jul 2025
Form 3File: CA CER FORM 3 PRODIGAR.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE PRODIGAR.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER PRODIGAR.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate Prodigar.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER PRODIGAR.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE PRODIGAR.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER PRODIGAR.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CER PRODIGAR.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER PRODIGAR.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE PRODIGAR.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC-CER PRODIGAR.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Prodigar.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-CER PRODIGAR.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Discolsure PRODIGAR.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Prodigar developers pvt ltd.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER PRODIGAR.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG - CER PRODIGAR.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE PRODIGAR 4A.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Cert Prodigar Part4A.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prodigar ARC CER March 2024.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Prodigar ENG CER March 2024.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: discolsure prodigar.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 08-CA Certificate Prodigar Part4A MAR 2024.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER PRODIGAR 2024.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER PRODIGAR SEP 202300027520240117154558.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER PRODIGAR DECEMBER 2300025920240117144634.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER PRODIGAR SEPTEMBER 202300026420240117145339.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE 2023 PRODIGAR00025020240117125223.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE PRODIGAR00024120240117123142.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11-CA Certificate Prodigar Part4A SEP.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 19-CA Certificate Prodigar Part4A DEC.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Prodigar Developers Pvt Ltd.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: P52000030283 PRODIGAR.pdf6 Jan 2023
Copy of the legal title reportFile: TC with Letter 31072021.pdf9 Aug 2021
Layout approvalFile: Prodigar Self Declaration.pdf2 Aug 2021
Layout approvalFile: YASH N A Plan.pdf2 Aug 2021
Building plan approval or NA orderFile: YASH FARMS N A Order.pdf2 Aug 2021
PAN CardFile: PAN CARD Prodigar.pdf2 Aug 2021
Copy of the legal title reportFile: TC with Letter 31072021.pdf2 Aug 2021
Details of encumbrancesFile: Prodigar Encumbrance.pdf2 Aug 2021
Copy of Layout Approval (in case of layout)File: Prodigar Self Declaration.pdf2 Aug 2021
Copy of Layout Approval (in case of layout)File: YASH N A Plan.pdf2 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: YASH FARMS N A Order.pdf2 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: YASH FARMS N A Order.pdf2 Aug 2021
Declaration about Commencement CertificateFile: Prodigar Form D.pdf2 Aug 2021
Declaration in FORM BFile: Prodigar Affidavit Form B.pdf2 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Podigar Arch Cert.pdf2 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC Podigar.pdf2 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prodigar CA Cer.pdf2 Aug 2021
Proforma of Allotment letterFile: YASH_Prodigar DOC.pdf2 Aug 2021

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prodigar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adoshi5,900+ in Raigarh

Builder: Prodigar Developers Private Limited

Prodigar Developers Private Limited has 2 registrations on MahaRERA, including YAS and Prodigar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Prodigar is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prodigar?

The registered promoter entity is Prodigar Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prodigar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prodigar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prodigar?

The professionals named in the filing: Architect: Swaroop Revankar; Engineer: Sanjiv Chaudhari; Chartered Accountant: Manoj Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prodigar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prodigar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prodigar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.