ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Priya Apartment

Completed No litigation declared Residential / Group Housing project

Priya Apartment

By Jasmina Constructions Pvt. Ltd.

RG-MH-10190 · RERA P51800005876 · Last updated on MahaRERA portal: 1 Aug 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 48 months
  • 5 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Priya Apartment is a Residential / Group Housing project by Jasmina Constructions Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005876 on 14 Aug 2017. The registration is recorded completed; possession was promised by 2 Jun 2023. The completion date has moved by 48 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NamePriya Apartment
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005876
  • ReraGenie IDRG-MH-10190

Builder

  • NameJasmina Constructions Pvt. Ltd.
  • Entity typeCompany
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017First promiseJun 2019Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion2 Jun 2023
  • Revised completionRevised to 2 Jun 2023 (originally 15 Jun 2019)
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Priya Co op Housing Society LtdNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Priya Co op Housing Society Ltd: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 1 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Compund Wall And GateYes100%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered6
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area396 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1061.61
Proposed, not sanctioned683 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBroadway Premises Co op Society Ltd, Dr Babasaheb Ambedkar Road, Dadar TT, Dadar East, Mumbai 40001

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManish M Shah
PartnerRole in project
Jasmina Constructions Pvt. Ltd.-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017362Jun 2019 → Jun 2023

Reason as filed by the promoterProject Completed and we have received OC on 2nd June 2023. OC certificate and Form 4 from architect already uploaded in RERA portal. It was asked by Rera Authorities in the mail by them that we will have to get extension to complete the project as per RERA norms. So we kindly request you to extend the project and deem this project as completed. USERID: jasmina_const. I cannot get extention for the date of OC as the tab dosent go below 2024. I have completed all the queries as per your mail on 25th June 2024. Please extend the project and deem it closed as the project is completed.

EXT51800002008Jun 2019 → Jun 2020

Reason as filed by the promoterSir, We would like to extend the completion date of the project from 15/6/2019 to 10/6/2020 for the following reasons:- 1) The project when registered with RERA it was planned for 7 Floors by FSI calculations as per DCR 1991. 2) During the construction we were aware of the DCR 2034 to get finalised in November 2018. And as per the New DCR the potential for our project increased with the Revised FSI calculations according to Road FSI. 3) So further we proposed and acquired CFO NOC with Plans with revised FSI which will increase our project from 7 Floors to 8 Floors. 4) According to the authorit

EXT51800008684Jun 2019 → Jun 2021

Reason as filed by the promoterWe are into a process of acquiring additional benifit of Road FSI and extend our construction one more floor. The process has been slowed down due to Covid Pandemic and we have submitted the amended plans to the authority but due to lack of staff during this pandemic times the process is lacking its pace and so we would like to extend the date of completeion of this project as per proposed. Also the building has been constructed as per the old plans with finished interiors, finished compund and OHT also has lift installed in it and is ready to use as it is.

EXT51800010138Jun 2019 → Dec 2021

Reason as filed by the promoterSir, We would like to extend the completion date of the project from 15/6/2021 to 15/12/2021 for the following reasons:- 1) The project when registered with RERA it was planned for 7 Floors by FSI calculations as per DCR 1991. 2) During the construction we were aware of the DCR 2034 to get finalised in November 2018. And as per the New DCR the potential for our project increased with the Revised FSI calculations according to Road FSI. 3) So further we proposed and acquired CFO NOC with Plans with revised FSI which will increase our project from 7 Floors to 8 Floors, As per File no. CHE/WSII/00

EXT51800012869Jun 2019 → Jan 2023

Reason as filed by the promoterBuiilding is Completed 100% only OC compliances are in progress

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000197093Jasmina Construction pvt ltdJITESH JAYANTILAL SHAH28/05/2021
CC006000000197095Jasmina constructions pvt ltdChetna Jitesh Shah28/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jun 2023

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Form 4.pdf1 Aug 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Incorporation of New Members.pdf1 Aug 2024
Details of encumbrances concerned to FinanceFile: No Dues Cert Recvd from RCFL.pdf23 Jul 2024
Details of encumbrances concerned to LegalFile: No Dues Cert Recvd from RCFL.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf23 Jul 2024
Deviation Report with respect to Allotment letterFile: Declaration for Deviation of Allotment.pdf23 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Declaration for Deviation of Agreement.pdf23 Jul 2024
CERSAI detailsFile: Details of Redvelopment Projec.pdf5 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Disclosure of Interest in Other Real Est Org.pdf5 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration for Seperate Bank.pdf5 Jul 2024
Declaration in FORM BFile: Notarise Affidavit Cum Declaration Form B.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form No 2A.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form No 3 C A Certificate.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5 C A Certificate.pdf22 Nov 2023
Proforma of Allotment letterFile: Draft Allotment.pdf22 Nov 2023
Status of ConveyanceFile: Deem Conveyance.pdf22 Nov 2023
Proforma of Agreement for saleFile: Proforma Agreement.pdf6 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final OC.pdf5 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 353 A Notice Architect Certificate.pdf5 Jun 2023
Layout approvalFile: Amended Plan.pdf4 Apr 2023
Building plan approvalFile: Amended IOD.pdf4 Apr 2023
Copy of Layout Approval (in case of layout)File: Amended Plan.pdf4 Apr 2023
Building Plan Approval (IOD)File: Amended IOD.pdf4 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC.pdf4 Apr 2023
Declaration about Commencement CertificateFile: Declaration of C C.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Site Supervisor Certificate.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 Site Supervisor Certificate.pdf4 Apr 2023
Certificates of CA (Form 3)File: FORM 3.pdf4 Apr 2023
Certificates of CA (Form 5)File: FORM 5.pdf4 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf8 Feb 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engg Certificate19-20.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate 21.pdf14 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf14 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf14 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf14 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf14 Jul 2021
Certificates of CA (Form 5)File: CA Certificate (Form 5).pdf29 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf29 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jun 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf29 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3.pdf29 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf28 Jul 2017
Building plan approvalFile: 11.pdf27 Jul 2017
Building plan approvalFile: 07.pdf27 Jul 2017
Building plan approvalFile: 08.pdf27 Jul 2017
Building plan approvalFile: 09.pdf27 Jul 2017
Building plan approvalFile: 10.pdf27 Jul 2017
Building plan approvalFile: 06.pdf27 Jul 2017
Building plan approvalFile: 04.pdf27 Jul 2017
Building plan approvalFile: 05.pdf27 Jul 2017
Building plan approvalFile: 01.pdf27 Jul 2017
Building plan approvalFile: 02.pdf27 Jul 2017
Building plan approvalFile: 03.pdf27 Jul 2017
Layout approvalFile: Layout Plan.pdf27 Jul 2017
PAN CardFile: JCPL - Pan Card.pdf27 Jul 2017
Copy of the legal title reportFile: Title Report.pdf27 Jul 2017
Details of encumbrancesFile: Encumbrances.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: 01.pdf27 Jul 2017
Building Plan Approval (IOD)File: 02.pdf27 Jul 2017
Building Plan Approval (IOD)File: 03.pdf27 Jul 2017
Building Plan Approval (IOD)File: 04.pdf27 Jul 2017
Building Plan Approval (IOD)File: 05.pdf27 Jul 2017
Building Plan Approval (IOD)File: 06.pdf27 Jul 2017
Building Plan Approval (IOD)File: 07.pdf27 Jul 2017
Building Plan Approval (IOD)File: 08.pdf27 Jul 2017
Building Plan Approval (IOD)File: 09.pdf27 Jul 2017
Building Plan Approval (IOD)File: 10.pdf27 Jul 2017
Building Plan Approval (IOD)File: 11.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf27 Jul 2017
Declaration in FORM BFile: Form B.pdf27 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Priya Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmPriya ApartmentCompleted 138Lapsed / revoked 78Other 206Dot size: filed unitsN

Filed coordinates, straight-line distance. 422 registered projects within 2 km.

Builder: Jasmina Constructions Pvt. Ltd.

Jasmina Constructions Pvt. Ltd. has 2 registrations on MahaRERA, including Priya Apartment and Omkar Prive. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Priya Apartment is delayed beyond 2 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Priya Apartment?

The registered promoter entity is Jasmina Constructions Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Priya Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Priya Apartment?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Priya Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Priya Apartment?

The professionals named in the filing: Architect: Manish M Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Priya Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Priya Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Priya Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.