Home / Browse projects / Mysore, Karnataka / Prithvi World

Registration approved Residential/Group Housing project

Prithvi World

By PRITHVI INFRASTRUCTURE

RG-KA-09625 · RERA PRM/KA/RERA/1268/378/PR/180808/001980

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Mar 2024Possession promisedmoved 21 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

Prithvi World is a Residential/Group Housing project by PRITHVI INFRASTRUCTURE in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/180808/001980 on 8 Aug 2018. Possession is promised by 22 Mar 2024. The completion date has moved by 21 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePrithvi World
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/180808/001980
  • ReraGenie IDRG-KA-09625

Builder

  • NamePRITHVI INFRASTRUCTURE
  • Entity typePartnership Firm
  • Authorized SignatoryPrakash Jain
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2018First promiseJun 2022Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Aug 2018
  • Promised completion22 Mar 2024
  • Revised completionRevised to 22 Mar 2024 (originally 22 Jun 2022)
  • Buildings7 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C-BLOCK---15015
D-BLOCK---31031
E-BLOCK---30030
F-BLOCK---31031
G-BLOCK---30030
H-BLOCK---31031
I-BLOCK---31031

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,987 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 130.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAni Sambyal Sing
EngineerVasudevan T S

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2022 → Mar 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1268/378/PR/230123/001980Mar 2023 → Mar 2024

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/210810/0008231-PRITHVI INFRASTRUCTURE10/08/2021

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/180808/001980 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Prithvi Infrastructure -Firm Registration.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Form Ex1 Architect Certificate For Status of Work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form Ex5 Engineers Certificate for Status of Work as on date.pdf-
CA Certificate for Funds UtilizationFile: Form Ex3 Chartered Accountant Certificate For Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form Ex2 Architect Certificate For Pending Work As On Date.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form Ex6 Engineers Certifictae for Pending work as on date.pdf-
CA Certificate for Funds required for Project CompletionFile: Form Ex4 Chartered Accountant Certificate For Fund Required.pdf-
AffidavitFile: Form Ex7 Affidavit for seeking extension of registered project.pdf-
Latest Encumbrance CertificateFile: EC World 1.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Commencement Certificate_Declearation-
Approved Building Plan-
Building Plan_Prithvi World-
Performa of Sale deed_Prithvi World-
Proforma_Sale Agreement_Prithvi World-
Title deed_Prithvi World-
Approved Section of the Building Plan-
Area Development Plan of Project Area-
Proforma_Letter of Allotment-
Prithvi World - Brocher-
Airport Authority NOC Prithvi World-
Project Specfication_Declearation-
Prithvi World - EC-
Khatha_Prithvi World-
Joint Development Agreement_Prithvi world-
Fire NOC - Prithvi World-
FIRE_NOC-
Airport Authority NOC Prithvi World-
CESCOM NOC-
BSNL NOC-
Building Plan_V1-
Exisiting Layout Plan & Declearation-
Existing Section & Specfication-
Change of Land Use_Declearation-
Balance Sheet 2016 - 2017File: Balance Sheet_2016-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet_2015-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet_2014-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit & Loss_2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit & Loss_2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit & Loss_2015.pdf-
Director's Report 2016 - 2017File: Director Report FY 17-18.pdf-
Director's Report 2015 - 2016File: Director Report FY 16-17.pdf-
Director's Report 2014 - 2015File: Director Report FY 15-16.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow_FY 17-18.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow_FY 16-17.pdf-
Auditor's Report 2016 - 2017File: Auditor Report_2017.pdf-
Auditor's Report 2015 - 2016File: Auditor Report_2016.pdf-
Auditor's Report 2014 - 2015File: Auditor Report_2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR Ack_2017-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR Ack_2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR Ack_2015-16.pdf-
Form-B_Prithivi World-
Prospectus/BrochureFile: Prospectus_Prithvi World.pdf-
Advertisement Copy 1File: Prospectus_Prithvi World.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1268_378_PR_180808_001980.xls-
Occupancy CertificateFile: CC Prithvi World.pdf-
Completion certificate issued by the competent authorityFile: CC Prithvi World.pdf-
Registered Agreement of SaleFile: Prithvi World Sale Deed.pdf-
Registered conveyance deed for an individual unitFile: Prithvi World Sale Deed.pdf-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one moved by 21 months
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Prithvi World on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: PRITHVI INFRASTRUCTURE

PRITHVI INFRASTRUCTURE has 2 registrations on RERA Karnataka, including Prithvi World and PRITHVI ORCHIDS VILLA ( PHASE-1 ). Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Prithvi World is delayed beyond 22 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Prithvi World?

The registered promoter entity is PRITHVI INFRASTRUCTURE, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Prithvi World?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prithvi World?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Prithvi World?

The professionals named in the filing: Architect: Ani Sambyal Sing; Engineer: Vasudevan T S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prithvi World?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prithvi World. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prithvi World to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.