Home / Browse projects / Raigarh, Maharashtra / PRIME ROSE

Registered No litigation declared Residential / Group Housing project

PRIME ROSE

By AK HITECH ASSOCIATES

RG-MH-87093 · RERA P52000047764 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Internal walls, 95%
87 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

PRIME ROSE is a Residential / Group Housing project by AK HITECH ASSOCIATES in Raigarh, Maharashtra, registered with MahaRERA as P52000047764 on 28 Nov 2022. Possession is promised by 31 Mar 2027. 55 of the 142 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRIME ROSE
  • TypeResidential / Group Housing
  • Location
    • SECTOR NO-8
    • NAVI MUMBAI
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000047764
  • ReraGenie IDRG-MH-87093

Builder

  • NameAK HITECH ASSOCIATES
  • Entity typePartnership
  • PartnersKHAMRUDDIN SUBHANI PATEL, SHAMSUDDIN SUBHANI PATEL, IRFAN SHAMSUDDIN PATEL, BHAVESH KANTILAL CHIKHLIYA, SHAHID KHAMRUDDIN PATEL, KHAMRUDDIN SUBHANI PATEL, BHAVESH KANTILAL CHIKHLIYA, IRFAN SHAMSUDDIN PATEL, SHAHID KHAMRUDDIN PATEL, SHAMSUDDIN SUBHANI PATEL
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredNov 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

39%55 of 142 units booked
97.4%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRIME ROSENA141213210142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

PRIME ROSE: 94% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed118

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots118
Closed/Covered118

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,190 sq m
Land owned byNot the promoter
Named landowners7
Encumbrance on the landDeclared none
Declared on4 Aug 2025
LandownerVillageDistrict
PARVATI LAXMAN PATILChirleRaigarh
SITA DAGADU GOSAVIDapoliRaigarh
SARASWATI PRABHAKARMHATREJasaiRaigarh
VAISHALI VILAS MUNDEKolkheRaigarh
HEMANT MAHADEV NAIKPargaonRaigarh
SANTOSH MAHADEV NAIKPargaonRaigarh
SAKHRUBAI MAHADEV NAIKPargaonRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra (CIDCO)
Permissible FSI8789.97
Proposed, not sanctioned8,790 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNERUL,NAVI MUMBAI
Estimated costRs 31.04 cr
Cost incurredRs 30.22 cr
Work done97.36%
BuildingWingEstimatedIncurred
PRIME ROSENARs 25.25 crRs 24.95 cr
-NARs 5.79 crRs 5.27 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION Architecture Interior Designs
EngineerSAMARTH AGARWAL
EngineerCBE Consultants
EngineerRutu Kapupara
Chartered AccountantJB Patel and Associates
Chartered AccountantCA Rishabh Lodaya
PartnerRole in project
AK HITECH ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: PRIME ROSE - Q4 - FORM 1.pdf13 May 2026
Withdrawal Update Form 2File: PRIME ROSE - Q4 - FORM 2.pdf13 May 2026
Withdrawal Update Form 3File: PRIME ROSE - Q4 - FORM 3.pdf13 May 2026
Withdrawal Update Form 1File: PrimeRose - FORM 1.pdf16 Feb 2026
Withdrawal Update Form 2File: PrimeRose - FORM 2.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 - Prime Rose Q3.pdf16 Feb 2026
Form 2A (FY 2024-2025)File: PrimeRose Form 2A 2024-25.pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1 prime rose.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 with Stamp And Signature -Primerose.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3_Prime Rose_Sept 2025.pdf27 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 -Primerose_Fy2024-25.pdf31 Oct 2025
Layout approvalFile: plan highlighted-1.pdf15 Oct 2025
Layout approvalFile: plan highlighted-2.pdf15 Oct 2025
Layout approvalFile: plan highlighted-3.pdf15 Oct 2025
Layout approvalFile: plan highlighted-4.pdf15 Oct 2025
Layout approvalFile: plan highlighted-5.pdf15 Oct 2025
Building plan approvalFile: PL-05,SEC-08 FLOOR PLAN DWG_compressed.pdf15 Oct 2025
Form 1File: Form 1 Sep 24.pdf22 Sep 2025
Form 2File: Form 2 Sep 24.pdf22 Sep 2025
Form 3File: Form 3 signed final.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Prime Rose Sep 2024.pdf22 Sep 2025
Building plan approvalFile: plan highlighted-1.pdf15 Sep 2025
Form 1File: Prime Rose Form 1.pdf11 Sep 2025
Form 2File: Prime Rose Form 2.pdf11 Sep 2025
Form 3File: Form 3.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Prime Rose_compressed.pdf11 Sep 2025
Form 1File: Form 1 - Dec 24.pdf11 Sep 2025
Form 2File: Form 2 - Dec 24.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - Dec 24.pdf11 Sep 2025
Form 3File: FORM 3_compressed.pdf11 Sep 2025
Commencement certificateFile: 2ND AMENDED CC COPY_merged.pdf25 Aug 2025
Building plan approvalFile: 2ND AMENDED CC DWG_11zon.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1 Primerose.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2 Primerose.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3_ Prime Rose_ June-25_compressed.pdf25 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Prime Rose Mar 25 final.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Prime Rose_compressed.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Prime Rose_compressed.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prime Rose Form 1.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Prime Rose Form 2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24_compressed.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 24.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2023.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2024.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed final.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 24.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Prime Rose June 2024.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Prime Rose Sep 2024.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf11 Dec 2024
Other - LegalFile: 1 Proforma of Agreement for sale (2).pdf19 Nov 2022
Other - LegalFile: 1 Deviation Report with respect to model copy of Agreement (2).pdf19 Nov 2022
Proforma of Allotment letterFile: 2 Proforma of Agreement for sale (1) (1).pdf18 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AK HITECH ASSOCIATES_FORM-3_compressed.pdf8 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate PRIME ROSE.pdf31 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Prime Rose.pdf31 Oct 2022
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (6).pdf29 Oct 2022
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (6).pdf29 Oct 2022
Details of encumbrances concerned to FinanceFile: Declaration Finance (1).pdf11 Oct 2022
Declaration about Commencement CertificateFile: AK Hitech Associates Declaration Certificate .pdf11 Oct 2022
CERSAI detailsFile: Declaration Cersai.pdf11 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Devation Report Agreement .pdf11 Oct 2022
Building plan approvalFile: AMENDED CC DWG (10)_compressed (1).pdf10 Oct 2022
Details of encumbrances concerned to LegalFile: Declaration LEGAL AK.pdf10 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: AMENDED CC DWG (10)_compressed (1).pdf10 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC COPY (10).pdf10 Oct 2022
Proforma of Agreement for saleFile: MODEL AL AK_compressed.pdf10 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A RERA BANK ACCVOUNT.pdf10 Oct 2022
Copy of the legal title reportFile: Title Certificate _compressed.pdf8 Oct 2022
PAN CardFile: Firm-PAN Card.pdf26 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Final Order .pdf26 Aug 2022
Declaration in FORM BFile: Kamaruddin Subhani Patel compressed.pdf26 Aug 2022

How this compares with Raigarh

39%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIME ROSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI5,900+ in Raigarh

2 kmPRIME ROSECompleted 11Lapsed / revoked 12Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: AK HITECH ASSOCIATES

AK HITECH ASSOCIATES has 3 registrations on MahaRERA, including PATEL SUKHSAMRUDDHI and PRIME ROSE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PRIME ROSE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIME ROSE?

The registered promoter entity is AK HITECH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIME ROSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIME ROSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIME ROSE?

The professionals named in the filing: Architect: DESTINATION Architecture Interior Designs; Engineer: SAMARTH AGARWAL; Engineer: CBE Consultants; Engineer: Rutu Kapupara; Chartered Accountant: JB Patel and Associates; Chartered Accountant: CA Rishabh Lodaya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIME ROSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIME ROSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIME ROSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.