Home / Browse projects / Pune, Maharashtra / PRIMA GLIDE PARK PLUS

Registered No litigation declared Residential / Group Housing project

PRIMA GLIDE PARK PLUS

By JAGADGURU DEVELOPERS

RG-MH-62695 · RERA P52100054566 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 55%
68 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

PRIMA GLIDE PARK PLUS is a Residential / Group Housing project by JAGADGURU DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100054566 on 31 Jan 2024. Possession is promised by 30 Jun 2027. 27 of the 95 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRIMA GLIDE PARK PLUS
  • TypeResidential / Group Housing
  • Location
    • Survey No 106 Hissa 1 B Sant Nagar Lohagaon Pune
    • Lohgaon
    • Haveli
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054566
  • ReraGenie IDRG-MH-62695

Builder

  • NameJAGADGURU DEVELOPERS
  • Entity typePartnership
  • PartnersSharad Sopan Moze, Shashikant Balasaheb Moze, Tanaji Bhimaji Khirad
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

28%27 of 95 units booked
50.3%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA141295095

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 55%.

Wing A: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed169

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots169
Closed/Covered150
Open Space19

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,050 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025
LandownerVillageDistrict
Kailas Baban KhandaveCHARHOLIPune
Vidhya Kailas KhandveCHARHOLIPune
Gauri Kailas KhadveCHARHOLIPune
Gayatri Kailas KhandveCHARHOLIPune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI6973.41
Proposed, not sanctioned6,973 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAir Force Station Lohagaon Pune 411032
Estimated costRs 20.68 cr
Cost incurredRs 10.41 cr
Work done50.33%
BuildingWingEstimatedIncurred
Wing ANARs 18.73 crRs 10.41 cr
-NARs 1.95 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG A BHILARE CONSULTANT PVT LTD
ArchitectCUBIX ARCHITECTS ASSOCITES
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerSomnath Shinde
EngineerMANDAR PATHARE
Chartered AccountantAjitsingh K & Associates
Chartered AccountantTANAJI CHORGHE AND CO
PartnerRole in project
JAGADGURU DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Cert Signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Prima Plus_compressed.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar 2026 Prima Glide Park Plus - Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Glide Park Plus Dec 25.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 Glide Park Plus Sep 25.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Glide Park Plus Engineer Cert Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Glide Park Plus Engineer Cert Sept 2025.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 Prima Park plus Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 Prima Park plus sep 2025.pdf23 Jan 2026
Building plan approvalFile: PLAN 1 OF 4_compressed.pdf1 Aug 2025
Building plan approvalFile: PLAN 2 OF 4_compressed.pdf1 Aug 2025
Building plan approvalFile: PLAN 3 OF 4_compressed.pdf1 Aug 2025
Building plan approvalFile: PLAN 4 OF 4_compressed.pdf1 Aug 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate .pdf30 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate as on July 25.pdf30 Jul 2025
Withdrawal Update Form 3File: Form 3 Jun 2025 Prima Glide Park Plus.pdf30 Jul 2025
Form 2A (FY 2025-2026)File: Form 2A FY 24-25.pdf30 Jul 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate .pdf29 Jul 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate .pdf29 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate as on July 25.pdf29 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate as on July 25.pdf29 Jul 2025
Withdrawal Update Form 3File: Form 3 Jun 2025 Prima Glide Park Plus.pdf29 Jul 2025
Withdrawal Update Form 3File: Form 3 Jun 2025 Prima Glide Park Plus.pdf29 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf29 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf29 Jul 2025
Form 1File: Architect Certificate Form 1 Phase 2.pdf28 Jul 2025
Form 2File: Engineer Certificate Phase II_compressed.pdf28 Jul 2025
Form 3File: Form 3 Prima Glide Park P II_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_compressed.pdf28 Jul 2025
Form 1File: Architect Certificate Form 1 Phase 2_compressed.pdf28 Jul 2025
Form 2File: Engineer Certificate Form 2 Pgase 2_compressed.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate Phase 2 compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate Sep 24.pdf28 Jul 2025
Form 3File: Form 3 CA_Certificate_Prima Park Plus_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Jul 2025
Form 1File: Form 1 Architect Certificate Prima Glide Park Plus signed.pdf28 Jul 2025
Form 2File: Form 2 Engineer Certificate Prima Glide Park Plus.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate Glide Park Plus_compressed.pdf28 Jul 2025
Form 1File: Architect Certificate March 25.pdf28 Jul 2025
Form 2File: Engineer Certificate March 25.pdf28 Jul 2025
Form 3File: Form 3 CA Certificate Prime Glide Park Plus.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Jul 2025
Withdrawal Update Form 1File: Architect Certificate Form 1 Phase 2_compressed.pdf28 Jul 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate .pdf28 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate Form 2 Pgase 2_compressed.pdf28 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate as on July 25.pdf28 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Phase 2 compressed.pdf28 Jul 2025
Withdrawal Update Form 3File: Form 3 Jun 2025 Prima Glide Park Plus.pdf28 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Signed.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Prima Glide Park Plus signed.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Glide Park Plus_compressed.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Prima Glide Park Plus.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA_Certificate_Prima Park Plus_compressed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sep 24.pdf22 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 March 2024 Phase 2 Signed Copy.pdf5 Oct 2024
Other - FinanceFile: vishweshwar bank letter loan phase II.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Phase 2_compressed.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 Pgase 2_compressed.pdf5 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Phase 2 compressed.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Phase 2.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Phase II_compressed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Prima Glide Park P II_compressed.pdf19 Apr 2024
Copy of the legal title reportFile: Adobe Scan 23 Jan 2024 (2).pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex tanaji .pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sharad annex A.pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Shashikant annex a.pdf24 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow23 Jan 2024
Declaration in FORM BFile: Promoter Form B.pdf14 Jan 2024
CERSAI detailsFile: declaration of cersai report.pdf14 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293478736_For_Asset_Based_Search_14_01_2024_23_24_32_323.pdf14 Jan 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE jagadguru developer.pdf14 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER updated (2).pdf14 Jan 2024
Layout approvalFile: Copy Layout.pdf8 Jan 2024
Building plan approvalFile: Builiding Plan.pdf8 Jan 2024
Building plan approvalFile: Floor Plan.pdf8 Jan 2024
PAN CardFile: PHOTO-2023-12-23-12-50-50.pdf8 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PRIMA -GLIDE PARKP52100031920LOHGAON, Pune96Nov 2021OngoingDec 2024Jan 1970

How this compares with Pune

28%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIMA GLIDE PARK PLUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lohgaon13,700+ in Pune

2 kmPRIMA GLIDE PARK PLUSCompleted 15Lapsed / revoked 10Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: JAGADGURU DEVELOPERS

JAGADGURU DEVELOPERS has 3 registrations on MahaRERA, including PRIMA -GLIDE PARK and PRIMA GLIDE PARK PLUS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRIMA GLIDE PARK PLUS is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIMA GLIDE PARK PLUS?

The registered promoter entity is JAGADGURU DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIMA GLIDE PARK PLUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIMA GLIDE PARK PLUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIMA GLIDE PARK PLUS?

The professionals named in the filing: Architect: G A BHILARE CONSULTANT PVT LTD; Architect: CUBIX ARCHITECTS ASSOCITES; Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: Somnath Shinde; Engineer: MANDAR PATHARE; Chartered Accountant: Ajitsingh K & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIMA GLIDE PARK PLUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIMA GLIDE PARK PLUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIMA GLIDE PARK PLUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.