Home / Browse projects / Dakshina Kannada, Karnataka / PRESTIGE VALLEY CREST PHASE 2
PRESTIGE VALLEY CREST PHASE 2
By PRESTIGE ESTATES CONSTRUCTIONS LIMITED
RG-KA-83290 · RERA PRM/KA/RERA/1257/334/PR/171021/000437 · Last updated on RERA Karnataka portal: 7 Jun 2022
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
- Completion date moved by 21 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
PRESTIGE VALLEY CREST PHASE 2 is a Residential/Group Housing project by PRESTIGE ESTATES CONSTRUCTIONS LIMITED in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/171021/000437 on 21 Oct 2017. Possession is promised by 30 Jul 2023. The completion date has moved by 21 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NamePRESTIGE VALLEY CREST PHASE 2
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- PincodeNot stated
- RERA no.PRM/KA/RERA/1257/334/PR/171021/000437
- ReraGenie IDRG-KA-83290
Builder
- NamePRESTIGE ESTATES CONSTRUCTIONS LIMITED
- Entity typeCompany
- CINU07010KA1997PLC022322
- Authorized SignatorySWAROOP ANISH
- OthersKEZYA DE BRAGANZA
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Oct 2017
- Promised completion30 Jul 2023
- Revised completionRevised to 30 Jul 2023 (originally 31 Oct 2021)
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Prestige Valley Crest Tower1 | - | - | - | 250 | 0 | 250 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 7 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 7 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | No | Not applicable |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABHAY ITTY ZACHARIA |
| Engineer | PRUTHVIRAJ |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterothers
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00689/2024 | - | PRESTIGE ESTATES CONSTRUCTIONS LIMITED | 06/08/2024 |
Documents filed75
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/171021/000437 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| AffidavitFile: Affidavit-NOC.pdf | 7 Jun 2022 |
| Bank StatementFile: Valley Crest II SOA.pdf | 23 May 2022 |
| Covid Extention CertificateFile: PRMKARERA1257334PR171021000437 - VALLEY CREST - PH -2.pdf | 23 May 2022 |
| Form BFile: Form B.pdf | 23 May 2022 |
| BHK wise Break up of DevelopmentFile: TowerdetailPH2.xlsx | 23 May 2022 |
| StructurealFile: Structural-SC.PDF | 23 May 2022 |
| List of AlloteesFile: List of Allottes.XLSX | 23 May 2022 |
| NOCFile: NOC.pdf | 23 May 2022 |
| NOC summaryFile: Summary of Renewal of Approvals.pdf | 23 May 2022 |
| AGSFile: AGS.pdf | 23 May 2022 |
| SpecificationFile: specification.pdf | 23 May 2022 |
| STP DemarcationFile: Scan1.PDF | 23 May 2022 |
| STPFile: STP 315 KLD Technical Submittal - Prestige Valley Crest - 17-5-22.pdf | 23 May 2022 |
| STPFile: 315 KLD STP - DIFFUSER BLOCK DRAWING - SHEET 3.pdf | 23 May 2022 |
| CertificateFile: Annexure 1 Incorporation Certificate.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Architect-completed.PDF | - |
| Engineer Certificate for Work Completion Schedule till DateFile: PVC-Engineer-Complted.pdf | - |
| CA Certificate for Funds UtilizationFile: CA-Utilised.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Architect-Pending.PDF | - |
| Engineer Certificate for Pending Work Completion Schedule.File: PVC-Engineer-Pending.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA-Balance.pdf | - |
| AffidavitFile: Affidavit-Phase II.pdf | - |
| Latest Encumbrance CertificateFile: EC.PDF | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx | - |
| NOC DetailsFile: Summary of Renewal of Approvals.pdf | - |
| Document 1File: Back up for Delay - 1.pdf | - |
| Document 2File: Back up for Delay - 2.pdf | - |
| Document 3File: Back up for Delay - 3.pdf | - |
| Pre Construction License | - |
| DP-Plan | - |
| DP-Plan | - |
| Sale Deed Phase II | - |
| Agreement to Sell-Phase II | - |
| Sale Deed Merged | - |
| Section | - |
| PVC - CDP | - |
| Proforma of Allotment Letter - pvc2 | - |
| Prestige Valley Crest Brochure - | - |
| NOC | - |
| PRESTIGE VALLEY CREST SPECIFICATIONS-New | - |
| EC | - |
| Katha All | - |
| JDA | - |
| GPA | - |
| Conversion All | - |
| PVC fire noc | - |
| PCB | - |
| Environmental | - |
| Unnamed document | - |
| Section | - |
| Balance Sheet 2015 - 2016File: PEPL BALANC E SHEET AS ON 31ST 2016.pdf | - |
| Balance Sheet 2014 - 2015File: PEPL BALANC E SHEET AS ON 31ST 2015.pdf | - |
| Balance Sheet 2013 - 2014File: PEPL BALANC E SHEET AS ON 31ST 2014.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: PEPL P L AS ON 31ST 2016.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: PEPL P L AS ON 31ST 2015.pdf | - |
| Audited Profit and Loss Statement 2013 - 2014File: PEPL P L AS ON 31ST 2014.pdf | - |
| Director's Report 2015 - 2016File: Directors Report 15-16.pdf | - |
| Director's Report 2014 - 2015File: Directors Report 14-15.pdf | - |
| Director's Report 2013 - 2014File: Directors Report 13-14.pdf | - |
| Cash Flow Statement 2015 - 2016File: PEPL CASH FLOW AS ON 31ST 2016.pdf | - |
| Cash Flow Statement 2014 - 2015File: CASH FLOW AS ON 31ST 2015.pdf | - |
| Auditor's Report 2015 - 2016File: PEPL-Auditors Report -Mar16.pdf | - |
| Auditor's Report 2014 - 2015File: PEPL Auditors Report Mar15.pdf | - |
| Auditor's Report 2013 - 2014File: PEPL Auditors Report March 2014.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: PEPL INCOME TAX-2016-17.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: PEPL INCOM TAX-2015-16.pdf | - |
| Income Tax Return Acknowledgement 2013 - 2014File: PEPL-INCOM TAX-2014-15.pdf | - |
| 0502_001 | - |
| Prospectus/BrochureFile: Prestige Valley Crest Brochure.pdf | - |
| Advertisement Copy 1File: PVC NEW ADS - Ph2.png | - |
| Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_171021_000437.xlsx | - |
| Delay ReasonFile: Delay Analysis - Valley Crest - R0 - 23022022.pdf | - |
| Occupancy CertificateFile: Valley Crest - OC.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit-Valley Crest-Phase II.pdf | - |
| ThanksFile: Affidavit-Valley Crest-Phase II.pdf | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| PRESTIGE WESTHOLMES | - | Completed | - | No date filed |
| PRESTIGE BROOKLYN HEIGHTS | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep PRESTIGE VALLEY CREST PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
ROHAN CITY
ROHAN CORPORATION INDIA PRIVATE LIMITED
Bearys Turning Point
Bearys Properties and Developments Private
YAMUNA SKY CITY
YAMUNA HOMES AND DESIGN PRIVATE LIMITED
The Marian Park
Marian Projects Pvt Ltd
Sai Matha Garden
Matha Developers Pvt Ltd
ROHAN MARINA ONE
ROHAN PLAZA PRIVATE LIMITED
See every Dakshina Kannada project, with the district possession charts
Builder: PRESTIGE ESTATES CONSTRUCTIONS LIMITED
PRESTIGE ESTATES CONSTRUCTIONS LIMITED has 1 registration on RERA Karnataka, including PRESTIGE VALLEY CREST PHASE 2. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if PRESTIGE VALLEY CREST PHASE 2 is delayed beyond 30 Jul 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PRESTIGE VALLEY CREST PHASE 2?
The registered promoter entity is PRESTIGE ESTATES CONSTRUCTIONS LIMITED, a company as per the filing. Its CIN U07010KA1997PLC022322 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PRESTIGE VALLEY CREST PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PRESTIGE VALLEY CREST PHASE 2?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at PRESTIGE VALLEY CREST PHASE 2?
The professionals named in the filing: Architect: ABHAY ITTY ZACHARIA; Engineer: PRUTHVIRAJ. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRESTIGE VALLEY CREST PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback