Home / Browse projects / Raigarh, Maharashtra / PRECIOUS MAJESTIC

Registered No litigation declared Others project

PRECIOUS MAJESTIC

By HARSH CONSTRUCTIONS

RG-MH-18282 · RERA P52000066571 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 60%
181 of 216Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

PRECIOUS MAJESTIC is a Others project by HARSH CONSTRUCTIONS in Raigarh, Maharashtra, registered with MahaRERA as P52000066571 on 11 Jun 2024. Possession is promised by 31 Dec 2029. 35 of the 216 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NamePRECIOUS MAJESTIC
  • TypeOthers
  • Location
    • SECTOR-03
    • PUSHPAK NODE
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000066571
  • ReraGenie IDRG-MH-18282

Builder

  • NameHARSH CONSTRUCTIONS
  • Entity typePartnership
  • PartnersMAHESH BHAJANLAL MATTA, DEEPAK MURLIDHAR MATTA, ANIL AMBUMAL BUDHRANI, GIRISH MURLIDHAR MATTA

Key dates

this monthRegisteredJun 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

16%35 of 216 units booked
19.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A - WingNA909313106
B - WingNA901091110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 60%.

A - Wing35%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks14%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.7%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%
B - Wing33%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure36%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks11%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed239

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots239
Closed/Covered239
BuildingClosed/CoveredTotal
A - Wing120120
B - Wing119119

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,090 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI9913.37
Proposed, not sanctioned9,913 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 92/93, NEEL EMPRESS, NEW PANVEL, SECTOR 1S, PANVEL - 410206
Estimated costRs 54.80 cr
Cost incurredRs 10.40 cr
Work done18.98%
BuildingWingEstimatedIncurred
A - WingNARs 25.18 crRs 5.63 cr
B - WingNARs 21.31 crRs 4.77 cr
-NARs 8.30 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerM Nandwani Structural Consultants
Chartered AccountantMukesh Gurnani
Chartered AccountantVRP & Associates
PartnerRole in project
HARSH CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Harsh constructions Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Harsh constructions Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Signed Form 3 Q4-QPR.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 03 429.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 03 429.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 FY 25-26.pdf16 Feb 2026
Withdrawal Update Form 1File: Harsh Const Form 1.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 03 429.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 03 429.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 03 429.pdf20 Jan 2026
Withdrawal Update Form 3File: Client Sign Form3 Final.pdf20 Jan 2026
Withdrawal Update Form 3File: Client Sign Form3 Final.pdf20 Jan 2026
Withdrawal Update Form 1File: Harsh Const Form 1.pdf20 Oct 2025
Withdrawal Update Form 1File: Harsh Const Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: HARSH FORM-2.pdf20 Oct 2025
Withdrawal Update Form 2File: HARSH FORM-2.pdf20 Oct 2025
Withdrawal Update Form 3File: Client Sign Form3 Final.pdf20 Oct 2025
Withdrawal Update Form 3File: Client Sign Form3 Final.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Harsh Construction Form 5 scanned Signed.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1 Harsh Construction (Q1 2526).pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 Hars Construction (Q1 2526).pdf18 Jul 2025
Withdrawal Update Form 3File: Client Sign Form3 Final.pdf18 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Client signed form 3 Harsh Construction_11zon.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HC Form 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HC Form 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANT CERIFICATE_11zon.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: harsh_f1.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: harsh_f2.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Harsh construction form 3_compressed.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harsh constructions FORM-1 (Q2 24-25).pdf31 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Harsh constructions FORM-2 (Q2 24-25).pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Harsh construction Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHA RERA FORM 2 _ Harsh const.pdf20 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200308559329_For_Asset_Based_Search_29_05_2024_16_44_31_506.pdf31 May 2024
CERSAI detailsFile: HC CRESAI Declaration.pdf31 May 2024
Details of encumbrances concerned to FinanceFile: HC Self declaration regarding No encumbrance.pdf25 May 2024
Details of encumbrances concerned to LegalFile: HC Self declaration regarding No encumbrance.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Harsh Construction.pdf11 May 2024
Layout approvalFile: Plan Layout 1.pdf8 May 2024
Layout approvalFile: Plan Layout 2.pdf8 May 2024
Building plan approvalFile: Plan Layout 1.pdf8 May 2024
Building plan approvalFile: Plan Layout 2.pdf8 May 2024
PAN CardFile: 1) Harsh construction Pan card.pdf8 May 2024
Copy of the legal title reportFile: Legal Title Report.pdf8 May 2024
Copy of Layout Approval (in case of layout)File: Plan Layout 1.pdf8 May 2024
Copy of Layout Approval (in case of layout)File: Plan Layout 2.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan Layout 1.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan Layout 2.pdf8 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 9) Commencement certificate.pdf8 May 2024
Declaration about Commencement CertificateFile: HC Declaration about commencement certificate.pdf8 May 2024
Declaration in FORM BFile: Form B Affidavit.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6) FORM 1 Architect certificate.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7) Form 2 Engineer certificate.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: HC Girish Matta annexure A.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: HC Mahesh matta Annexure A.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Deepak matta Annexure A.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anil budhrani Annexure A.pdf8 May 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT 3-429.pdf8 May 2024
Proforma of Allotment letterFile: HC Model of Allotment.pdf8 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: HC Declaration about separate bank account.pdf8 May 2024
Deviation Report with respect to Allotment letterFile: HC Declaration regarding No deviation respect to Allotment letter.pdf8 May 2024
Deviation Report with respect to model copy of AgreementFile: HC Declaration regarding No deviation respect to agreement.pdf8 May 2024
Other - TechnicalFile: HC Declaration cum undertaking.pdf8 May 2024

How this compares with Raigarh

16%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRECIOUS MAJESTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK NODE5,900+ in Raigarh

2 kmPRECIOUS MAJESTICCompleted 104Lapsed / revoked 37Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 261 registered projects within 2 km.

Builder: HARSH CONSTRUCTIONS

HARSH CONSTRUCTIONS has 1 registration on MahaRERA, including PRECIOUS MAJESTIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PRECIOUS MAJESTIC is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRECIOUS MAJESTIC?

The registered promoter entity is HARSH CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRECIOUS MAJESTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRECIOUS MAJESTIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRECIOUS MAJESTIC?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: M Nandwani Structural Consultants; Chartered Accountant: Mukesh Gurnani; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRECIOUS MAJESTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRECIOUS MAJESTIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRECIOUS MAJESTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.