PRAYAG GHARKUL
By PRAYAG BUILDERS AND DEVELOPERS
RG-MH-04530 · RERA P52000022086 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 48 months
- 2 extensions taken
- Rs 10.00 crore secured on the land, in favour of DCB BANK LIMITED
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRAYAG GHARKUL is a Residential / Group Housing project by PRAYAG BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000022086 on 25 Aug 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 52 of the 278 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NamePRAYAG GHARKUL
- TypeResidential / Group Housing
- Location
- NEAR MAHALAXMI CITY
- PANVEL
- Vihighar
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000022086
- ReraGenie IDRG-MH-04530
Builder
- NamePRAYAG BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersPRADEEP KRUSHNA BHOPI, PRIYA PRADEEP BHOPI, MAHESH PRALHAD GHOGAVKAR
- Other registrations2 more →
- Completed2 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Aug 2019
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
- Buildings3 building records
- Documents filed158 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUIDING 3 WING H | NA | 8 | 8 | 61 | 0 | 61 |
| BUILDING 1 WING A B C D E | NA | 6 | 6 | 135 | 0 | 135 |
| BULDING 2 WING F G | NA | 8 | 8 | 70 | 12 | 82 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 50%.
BUIDING 3 WING H38%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING 1 WING A B C D E59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BULDING 2 WING F G36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed162
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUIDING 3 WING H | 44 | 5 | 49 |
| BUILDING 1 WING A B C D E | 45 | 11 | 56 |
| BULDING 2 WING F G | 46 | 11 | 57 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BULDING 2 WING F G | NA | Rs 9.39 cr | Rs 4.35 cr |
| BUIDING 3 WING H | NA | Rs 9.39 cr | Rs 4.35 cr |
| BUILDING 1 WING A B C D E | NA | Rs 9.39 cr | Rs 4.35 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SWAPNIL KALYANKAR |
| Architect | PMA ARCHITECTS |
| Engineer | VASTUKALP |
| Engineer | ER DNYANESHWAR JADHAV |
| Chartered Accountant | KEYUR BHAYANI & ASSOCIATES |
| Chartered Accountant | SHRADDHA PARANJAPE |
| Partner | Role in project |
|---|---|
| PRAYAG BUILDERS AND DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterExplanatory note regarding the state of development works in the projects and reason for not completing the development works in the projects within the period declared in the declaration submitted in FORM ‘B’ at the time of making application for the registration of ‘PRAYAG GHARKUL’ - As per the details mentioned at the time of registration of the project at the MahaRERA Website we had mentioned 30th DECEMBER 2023 as the project completion date, we will not able to complete the project due to various unavoidable reasons. Such as 1. In 2020 due to the Pandemic situation of COVID-19 and locked
Reason as filed by the promoterThe real estate project, situated in a remote area, has faced significant challenges due to limited customer bookings, resulting in a lower-than-anticipated response from prospective buyers. This lack of adequate buyer interest adversely impacted the financial inflow required for the timely completion of the project, as the anticipated funding from customer bookings could not be realized. Despite these challenges, the promoters have demonstrated unwavering commitment to the project's completion by arranging the necessary funds through the liquidation of personal assets. This decisive action re
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000396419 | PRAYAG BUILDERS AND DEVELOPERS | MR. MANGESH BHASKAR GORE | 27/06/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed158
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_ JUNE 26_ PRAYAG GHARKUL.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2_ JUNE 26_ PRAYAG GHARKUL.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_ JUNE 26_ PRAYAG GHARKUL.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1_ MARCH 26_ PRAYAG GHARKUL.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2_ MARCH 26_ PRAYAG GHARKUL.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3_ MARCH 26_ PRAYAG GHARKUL.pdf | 20 Apr 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ PRAYAG GHARKUL.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1_ SEP 25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1_ DEC 25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_ DEC 25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_ DEC 25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_ DEC 25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_ DEC 25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_ 24-25_ PRAYAG GHARKUL.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1_ SEP 25_ PRAYAG GHARKUL.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2_ SEP 25_ PRAYAG GHARKUL.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3_ SEP 25_ PRAYAG GHARKUL.pdf | 31 Dec 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-7.pdf | 14 Oct 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-6.pdf | 14 Oct 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-5.pdf | 14 Oct 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-4.pdf | 14 Oct 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-3.pdf | 14 Oct 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-2.pdf | 14 Oct 2025 |
| Building plan approvalFile: REVISED PLANS - PRAYAG GHARKUL-1.pdf | 14 Oct 2025 |
| Form 1File: FORM 1_ JUNE 25_ PRAYAG GHARKUL.pdf | 22 Jul 2025 |
| Form 2File: FORM 2_ JUNE 25_ PRAYAG GHARKUL.pdf | 22 Jul 2025 |
| Form 3File: FORM 3_ JUNE 25_ PRAYAG GHARKUL.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ PRAYAG GHARKUL.pdf | 22 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 25_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25_compressed.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: CERTIFICATE 2A.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1_PRAYAG GHARKUL_DEC_2024.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3_PRAYAG GHARKUL_DEC_2024_compressed.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2_PRAYAG GHARKUL_DEC_2024.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 4 DISCLOSER SOLD and UNSOLD_PRAYAG GHARKUL_DEC2024.pdf | 17 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5 FORM 5_ MARCH 24.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24_compressed.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 GHARKUL_0001.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 GHARKUL_0001.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY-GHARKUL_0001_compressed.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 GHARKUL_0001_compressed.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-PRAYAG GHARKUL_DEC 23.pdf | 21 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PRAYAG GHARKUL_DEC 23.pdf | 21 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-PRAYAG GHARKUL_DEC 23.pdf | 21 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PRAYAG GHARKUL_DEC 23_compressed.pdf | 21 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-PRAYAG GHARKUL_22 23.pdf | 21 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-PRAYAG GHARKUL_SEP 23_compressed.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PRAYAG GHARKUL_SEP 23.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-PRAYAG GHARKUL_SEP 23_compressed.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PRAYAG GHARKUL_SEP 23_compressed.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 17 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PRAYAG GHARKUL FORM 1- JUNE 2023 (1).pdf | 7 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 7 Sep 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 27 Jul 2023 |
| Details of encumbrancesFile: self declartion_0001.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-PRAYAG GHARKUL_22-23.pdf | 29 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-PRAYAG GHARKUL_22-23.pdf | 29 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-PRAYAG GHARKUL_MAR 23_compressed.pdf | 3 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PRAYAG GHARKUL_MAR 23.pdf | 3 May 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-PRAYAG GHARKUL_MAR 23_compressed.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PRAYAG GHARKUL_MAR 23_compressed.pdf | 3 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-PRAYAG GHARKUL DEC 2022.pdf | 25 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PRAYAG GHARKUL DEC 2022.pdf | 25 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD-PRAYAG GHARKUL DEC 2022_compressed.pdf | 25 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 PARYAG GHARKUL DEC 2022_compressed.pdf | 25 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: PRAYAG GHRKUL FORM 5 SEP 2022.pdf | 17 Nov 2022 |
| Layout approvalFile: PLAN_1-1_compressed.pdf | 12 Nov 2022 |
| Building plan approvalFile: PLAN_2-2.pdf | 12 Nov 2022 |
| Building plan approvalFile: PLAN_3-3.pdf | 12 Nov 2022 |
| Building plan approvalFile: PLAN_4-4.pdf | 12 Nov 2022 |
| Building plan approvalFile: PLAN_5-5.pdf | 12 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 158 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRAYAG GHARKUL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PANVEL5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: PRAYAG BUILDERS AND DEVELOPERS
PRAYAG BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including PRAYAG CITY Phase I and PRAYAG MEADOWS PHASE - l. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if PRAYAG GHARKUL is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRAYAG GHARKUL?
The registered promoter entity is PRAYAG BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRAYAG GHARKUL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PRAYAG GHARKUL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PRAYAG GHARKUL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRAYAG GHARKUL?
The professionals named in the filing: Architect: SWAPNIL KALYANKAR; Architect: PMA ARCHITECTS; Engineer: VASTUKALP; Engineer: ER DNYANESHWAR JADHAV; Chartered Accountant: KEYUR BHAYANI & ASSOCIATES; Chartered Accountant: SHRADDHA PARANJAPE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRAYAG GHARKUL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback