Home / Browse projects / Raigarh, Maharashtra / PRAYAG CITY Phase I

Completed No litigation declared Residential / Group Housing project

PRAYAG CITY Phase I

By PRAYAG BUILDERS AND DEVELOPERS

RG-MH-68067 · RERA P52000004381 · Last updated on MahaRERA portal: 29 Jun 2023

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
79 of 88Construction stages doneacross 8 buildings; furthest along: Staircases, 80%
2Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

PRAYAG CITY Phase I is a Residential / Group Housing project by PRAYAG BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000004381 on 9 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 2 complaints are on record with the regulator.

At a glance

Project

  • NamePRAYAG CITY Phase I
  • TypeResidential / Group Housing
  • Location
    • VIHIGHAR ROAD
    • VIHIGHAR
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000004381
  • ReraGenie IDRG-MH-68067

Builder

  • NamePRAYAG BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersPRADEEP KRUSHNA BHOPI, PRIYA PRADEEP BHOPI, MAHESH PRALHAD GHOGAVKAR
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredAug 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings8 building records
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1 WING A BNA60000
BUILDING 2 WING C DNA60000
BUILDING 3 WING E FNA60000
BUILDING 4 WING G HNA60000
BUILDING 5 WING I JNA60000
BUILDING 6 WING K LNA60000
BUILDING 7 WING M NNA60000
BUILDING 8 WING ONA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 29 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

79 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Staircases, at 80%.

BUILDING 1 WING A B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 2 WING C D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 3 WING E F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 4 WING G H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 5 WING I J91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 6 WING K L91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 7 WING M N89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 8 WING O91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
BUILDING 1 WING A B11
BUILDING 2 WING C D11
BUILDING 3 WING E F11
BUILDING 4 WING G H11
BUILDING 5 WING I J11
BUILDING 6 WING K L11
BUILDING 7 WING M N11
BUILDING 8 WING O11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,900 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13067.73
Proposed, not sanctioned13,068 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIT NO 7-8 NEEL UDYAN SANJAY CO OP HSG SOC PLOT NO 19 SECTOR 3E KALAMBOLI NAVI MUMBAI - 410218

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL KALYANKAR ARCHITECTS
EngineerPRAPTI ASSOCIATE
PartnerRole in project
PRAYAG BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000003783Dec 2019 → Dec 2020

Reason as filed by the promoterWith due responsibility we intend to complete the work on time. But, due to heavy rain fall in the month of June, July, August, September, October and November in the year 2019 and non availability of construction material, specially sand and aggregates, the project is delayed. We regret for the same. We request you to provide extension to our project . We will complete the project before extended completion date 30st Dec 2020.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000374816PRAYAG BUILDERS AND DEVELOPERSMR PRASHANT BHASKAR GORE29/03/2023
CC006000000397410PRAYAG BUILDERS AND DEVELOPERSMR. MANGESH BHASKAR GORE16/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Feb 2022

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 PRAYAG CITY-1_0001.pdf29 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GetUserDocumentFileContent.pdf14 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: PRAYAG CITY 1 SOCIETY REGISTRATION CERTIFICATE_0001.pdf22 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_compressed (5).pdf20 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf20 Feb 2022
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY- PRAYAG CITY-1_0001_compressed.pdf20 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200230690064_For_Asset_Based_Search_20_02_2022_10_31_10_042.pdf20 Feb 2022
Certificates of CA (Form 3)File: PBD FORM-3_0001_compressed.pdf20 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: final Oc Letter.pdf20 Feb 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf20 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 FORM 1.pdf31 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 FORM 2 .pdf31 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3 FORM 2A - P CITY 1_0001.pdf31 Oct 2021
Disclosure of sold/ booked inventoryFile: 6 Prayag city 1 Sold Unsold_0001.pdf31 Oct 2021
Certificates of CA (Form 3)File: 4 FORM 3 CA PRAYAG CITY 1_0001.pdf31 Oct 2021
Certificates of CA (Form 5)File: 5 Prayag City Phase -1 Form 5.pdf31 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P CITY-1 ARCHIT LETTER_0001.pdf21 Aug 2021
Declaration about Commencement CertificateFile: Declaration about commencement certificate - city 1.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Prayag city -1 information of sold booked inventory_0001_compressed.pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: p city 1 From 5-2019-20_0001.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 1_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 2_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 3_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 4_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 6_0001_0001_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 5_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 6_0001_0001_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 7_0001_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 8_0001_0001.pdf12 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 9_0001_0001_0001.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: SOLD INVENTRY.pdf12 Jul 2021
Certificates of CA (Form 3)File: a CA Certificate Prayag City 1 _c.pdf4 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: city OC submission.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: prayag-city-phase-1.pdf3 May 2021
Building plan approvalFile: Binder1.pdf19 Nov 2020
Building plan approvalFile: Binder2.pdf19 Nov 2020
Building plan approvalFile: Binder3.pdf19 Nov 2020
Building plan approvalFile: Binder4pdf.pdf19 Nov 2020
Building plan approvalFile: Binder5.pdf19 Nov 2020
Building plan approvalFile: Binder6.pdf19 Nov 2020
Copy of the legal title reportFile: search report prayag city phase 1.pdf19 Nov 2020
Building Plan Approval (IOD)File: Binder1.pdf19 Nov 2020
Building Plan Approval (IOD)File: Binder2.pdf19 Nov 2020
Building Plan Approval (IOD)File: Binder3.pdf19 Nov 2020
Building Plan Approval (IOD)File: Binder4pdf.pdf19 Nov 2020
Building Plan Approval (IOD)File: Binder5.pdf19 Nov 2020
Building Plan Approval (IOD)File: Binder6.pdf19 Nov 2020
Proforma of Allotment letterFile: draft agreement 3.pdf19 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: BP-263_Signed CC 16-10-2020.pdf18 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: City Architect Letter.pdf13 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: City Architect Letter.pdf13 Sep 2020
Certificates of CA (Form 3)File: Form 3 City.pdf13 Sep 2020
Certificates of CA (Form 3)File: Form 3 City.pdf13 Sep 2020
Certificates of CA (Form 3)File: Form 3 City.pdf13 Sep 2020
Certificates of CA (Form 5)File: form5.PDF15 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form5.PDF15 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CITY 1 RERA RCC ENGINEERoct 18.pdf17 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: City 1 RERA Architect certificate-ilovepdf-compressed.pdf14 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CITY 1 RERA RCC Letter.pdf14 Oct 2018
Certificates of CA (Form 5)File: City Form 5 11 oct18.pdf13 Oct 2018
Building plan approvalFile: PRAYAG_PLAN_1-6 UP.pdf28 Mar 2018
Building plan approvalFile: PRAYAG_PLAN_7-end UP.pdf28 Mar 2018
Building Plan Approval (IOD)File: PRAYAG_PLAN_1-6 UP.pdf28 Mar 2018
Building Plan Approval (IOD)File: PRAYAG_PLAN_7-end UP.pdf28 Mar 2018
Details of encumbrancesFile: encumbrance letter.pdf8 Feb 2018
Proforma of Allotment letterFile: City draft format new.pdf8 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHI PRAYAG DEVELOPERS.pdf4 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archite_cer.pdf3 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGI CERT.pdf3 Feb 2018
Certificates of CA (Form 3)File: CA_CERTI.pdf3 Feb 2018
OtherFile: DCB_BANK_SANCTION_LETTER.pdf22 Jan 2018
Building plan approvalFile: Scan1-7.pdf28 Sep 2017
Building plan approvalFile: Scan2-7.pdf28 Sep 2017
Building plan approvalFile: Scan4-7.pdf28 Sep 2017
Building plan approvalFile: Scan5-7.pdf28 Sep 2017
Building plan approvalFile: Scan6-7.pdf28 Sep 2017
Building plan approvalFile: Scan7-7.pdf28 Sep 2017
Building Plan Approval (IOD)File: Scan1-7.pdf28 Sep 2017
Building Plan Approval (IOD)File: Scan2-7.pdf28 Sep 2017
Building Plan Approval (IOD)File: Scan4-7.pdf28 Sep 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAYAG CITY Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIHIGHAR5,900+ in Raigarh

2 kmPRAYAG CITY Phase ICompleted 4Lapsed / revoked 3Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: PRAYAG BUILDERS AND DEVELOPERS

PRAYAG BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including PRAYAG CITY Phase I and PRAYAG MEADOWS PHASE - l. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PRAYAG CITY Phase I is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAYAG CITY Phase I?

The registered promoter entity is PRAYAG BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAYAG CITY Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRAYAG CITY Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRAYAG CITY Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAYAG CITY Phase I?

The professionals named in the filing: Architect: SWAPNIL KALYANKAR ARCHITECTS; Engineer: PRAPTI ASSOCIATE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAYAG CITY Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAYAG CITY Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAYAG CITY Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.