ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Prathmesh Paradise

Registration lapsed No litigation declared Others project

Prathmesh Paradise

By Ajitsingh Shreenath Singh

RG-MH-98957 · RERA P52000011675 · Last updated on MahaRERA portal: 11 Mar 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 60 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
5 of 11Construction stages donefurthest along: Staircases, 65%
1Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

Prathmesh Paradise is a Others project by Ajitsingh Shreenath Singh in Raigarh, Maharashtra, registered with MahaRERA as P52000011675 on 31 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 60 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePrathmesh Paradise
  • TypeOthers
  • Location
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000011675
  • ReraGenie IDRG-MH-98957

Builder

  • NameAjitsingh Shreenath Singh
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 65%.

Wing A: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI599.79
Proposed, not sanctioned600 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSharda Terrace, Sector 2 CBD Belapur

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTS INTERIOR DESIGNS
EngineerB S SukThankar and Associates
PartnerRole in project
Ajitsingh Shreenath Singh-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000013370Dec 2018 → Dec 2023

Reason as filed by the promoterWe request your kind self to please grant extension till 31st December 2023 for our project PRATHMESH PARADISE, as our work has been delayed due to lockdown and Covid Pandemic. We assure you that we will complete our project before 31st December 2023 with all necessary permissions.

EXT52000005755Dec 2018 → Dec 2020

Reason as filed by the promoterAs per the details mentioned at the time of registration of the project at the MahaRERA Website, we had mentioned 31/12/2018 as the project completion date. We have further obtained extension for a period of One Year u/s 6 of the Act, i.e. till 31/12/2019. Unfortunately, due to various reasons being lack of labour due to de-monetization and implementation of GST we have still not obtained Occupancy Certificate for the Project. Therefore we would like to seek an extension period of further one year i.e. till 31/12/2020.

EXT52000001239Dec 2018 → Dec 2020

Reason as filed by the promoterGeneral facility such as Water Coonection, Drainage line, Local Road Facility Not Provided from CISCO.

EXT52000011546Dec 2018 → Dec 2022

Reason as filed by the promoterThere was no road access provided by CIDCO. Now water and no 3 phase electricity, No drainage.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000220931VINODKUMAR CHINTAMAN SONAWANEAjitsingh Shreenath Singh22/04/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Paradise Form D.pdf11 Mar 2023
Disclosure of sold/ booked inventoryFile: Paradise Sold Unsold.pdf11 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf15 Feb 2023
Certificates of CA (Form 3)File: Prathmesh Paradise FORM 3.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf15 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Dec 2022
Proforma of Allotment letterFile: Form 2A.pdf29 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: document.pdf22 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019 2020.pdf22 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020 2021.pdf22 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: img210.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: img211.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: img212.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER CERTIFICATE 2022.pdf16 Mar 2022
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE PRATHMESH PARADISE, PLOT-D6, SEC-08, ULWE_compressed.pdf15 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate, Prathmesh Paradise (1).pdf15 Mar 2022
Certificates of CA (Form 5)File: Form 5 Prathmesh Paradise.pdf30 Sep 2019
Certificates of CA (Form 5)File: Prathmesh Construction PP Form 5.pdf29 Sep 2018
Building plan approvalFile: TERRACE FLOOR PLAN.pdf31 Jul 2017
Building plan approvalFile: TERRACE FLOOR PLAN1.pdf31 Jul 2017
Building plan approvalFile: SECTION C C D D.pdf31 Jul 2017
Building plan approvalFile: 2ND FLOOR PLAN.pdf31 Jul 2017
Building plan approvalFile: SECTION A A.pdf31 Jul 2017
Building plan approvalFile: SECTION B B.pdf31 Jul 2017
Building plan approvalFile: GROUND FLOOR PLAN.pdf31 Jul 2017
Building plan approvalFile: 3RD FLOOR PLAN.pdf31 Jul 2017
Building plan approvalFile: 4TH FLOOR PLAN.pdf31 Jul 2017
Building plan approvalFile: 1ST FLOOR PLAN.pdf31 Jul 2017
Layout approvalFile: CIDCO Approved DRAWING PRATHMESH PARADISE.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: CIDCO Approved DRAWING PRATHMESH PARADISE.pdf31 Jul 2017
Building Plan Approval (IOD)File: 1ST FLOOR PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: 2ND FLOOR PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: 3RD FLOOR PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: 4TH FLOOR PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: GROUND FLOOR PLAN.pdf31 Jul 2017
Building Plan Approval (IOD)File: SECTION A A.pdf31 Jul 2017
Building Plan Approval (IOD)File: SECTION B B.pdf31 Jul 2017
Building Plan Approval (IOD)File: SECTION C C D D.pdf31 Jul 2017
Building Plan Approval (IOD)File: TERRACE FLOOR PLAN1.pdf31 Jul 2017
Building Plan Approval (IOD)File: TERRACE FLOOR PLAN.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 1.pdf31 Jul 2017
Proforma of Allotment letterFile: 29 july 17 RERA Agreement Prathmesh PRADISE PLOT D6.pdf31 Jul 2017
PAN CardFile: PAN Card.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE REPORT PRATHMESH PARADISE, PLOT-D6, SEC-08, ULWE.pdf30 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate - Prathamesh Paradise.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE PRATHMESH PARADISE, PLOT-D6, SEC-08, ULWE.pdf30 Jul 2017
Declaration in FORM BFile: AFFIDAVIT FORM B, PRATHMESH PARADISE, PLOT-D6, SEC-08, ULWE.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate PRATHMESH PARADISE, PLOT-D6, SEC-08, ULWE.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate, Prathmesh Paradise.pdf30 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 60 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prathmesh Paradise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulawe5,900+ in Raigarh

2 kmPrathmesh ParadiseCompleted 133Lapsed / revoked 41Other 129Dot size: filed unitsN

Filed coordinates, straight-line distance. 303 registered projects within 2 km.

Builder: Ajitsingh Shreenath Singh

Ajitsingh Shreenath Singh has 2 registrations on MahaRERA, including Prathmesh Paradise and Prathmesh Symphony. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that Prathmesh Paradise shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Prathmesh Paradise is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prathmesh Paradise?

The registered promoter entity is Ajitsingh Shreenath Singh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prathmesh Paradise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prathmesh Paradise?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Prathmesh Paradise?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prathmesh Paradise?

The professionals named in the filing: Architect: DESTINATION ARCHITECTS INTERIOR DESIGNS; Engineer: B S SukThankar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prathmesh Paradise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prathmesh Paradise. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prathmesh Paradise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.