Home / Browse projects / Kolhapur, Maharashtra / PRATHAM RESIDENCY
PRATHAM RESIDENCY
RG-MH-22252 · RERA P53000031413 · Last updated on MahaRERA portal: 19 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRATHAM RESIDENCY is a Residential / Group Housing project by PRATHAM DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000031413 on 23 Oct 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 5 of the 10 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NamePRATHAM RESIDENCY
- TypeResidential / Group Housing
- Location
- Sardar colony Near Pitali Ganpati
- Tarabai Park
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000031413
- ReraGenie IDRG-MH-22252
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Oct 2021
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Current status
Figures as on 19 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRATHAM RESIDENCY | NA | 7 | 5 | 10 | 0 | 10 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
PRATHAM RESIDENCY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mr Sikandar Aappalal Pathan | Kolhapur (M Corp.) | Kolhapur |
| Mrs Shamim Sikandar Pathan | Kolhapur (M Corp.) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PRATHAM RESIDENCY | NA | Rs 2.61 cr | Rs 2.61 cr |
| - | NA | Rs 28.00 lakh | Rs 28.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amar Bhavnendra Upadhye |
| Architect | Amar Bhavanendra Upadhye |
| Engineer | Ranjit Mahadik |
| Engineer | Ranjit Agnu Mahadik |
| Chartered Accountant | Paragesh Joshi |
| Chartered Accountant | KISHOR R JOSHI AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| PRATHAM DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 31 Mar 2025
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: From 1 31 march.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: From 1 31 march.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: From 2 march.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: From 2 march.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: From 3 march.pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: From 3 march.pdf | 19 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2 A.pdf | 19 Aug 2026 |
| Form 1File: Architect Certificate.pdf | 22 Jun 2026 |
| Form 2File: Form 2.pdf | 22 Jun 2026 |
| Form 3File: From 3.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_page-0001.pdf | 22 Jun 2026 |
| Form 1File: 12 Architect Certificate.pdf | 18 Jun 2026 |
| Form 2File: 12 Engineer Certificate.pdf | 18 Jun 2026 |
| Form 3File: Form 3 CA Certificate.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf | 18 Jun 2026 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Competion Certificate.pdf | 31 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Architect Certificate.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer Certificate.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer Certificate.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect Certificate.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer Certificate.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 6 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion Certificate.pdf | 6 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect Certificate.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer Certificate.pdf | 5 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Pratham Residency.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Pratham Residency.pdf | 1 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Pratham Residency.pdf | 1 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Pratham Developers_Annual CA Report 22-23.pdf | 7 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Assurance Certificate_Pratham Developers.pdf | 28 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect Certificate.pdf | 9 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer Certificate.pdf | 9 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Booking Inventory.pdf | 30 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect Certificate.pdf | 27 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer Certificate.pdf | 27 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate.pdf | 12 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect Certificate.pdf | 23 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer Certificate.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 21-22.pdf | 4 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect Certificate.pdf | 4 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Certificate.pdf | 4 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate of Percentage of Competion of Work (Form 1).pdf | 6 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 6 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cerificate-Thanedar.pdf | 9 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Thanedar.pdf | 9 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Thanedar 1.pdf | 9 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cerificate-Thanedar.pdf | 28 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Thanedar.pdf | 28 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Thanedar 1.pdf | 28 Feb 2022 |
| OtherFile: Credai Membership Certificate.pdf | 13 Oct 2021 |
| Proforma of Allotment letterFile: Allotmet letter .pdf | 25 Sep 2021 |
| PAN CardFile: Pan Card.pdf | 16 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA pratham developers.pdf | 16 Sep 2021 |
| Layout approvalFile: Layout Plan.pdf | 15 Sep 2021 |
| Building plan approvalFile: KMC Sanction Plan.pdf | 15 Sep 2021 |
| Copy of the legal title reportFile: Legal Title Report_0001.pdf | 15 Sep 2021 |
| Copy of the legal title reportFile: Search Report.pdf | 15 Sep 2021 |
| Details of encumbrancesFile: No encumbrance Declaration.pdf | 15 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 15 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: KMC Sanction Plan.pdf | 15 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 15 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 15 Sep 2021 |
| Declaration in FORM BFile: Form B - Promoter.pdf | 15 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 15 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 15 Sep 2021 |
| Proforma of Allotment letterFile: Agreement to Sale.pdf | 15 Sep 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Atharva Pride | C S No 36-A Tarabai Park Kolhapur | 18 | Completed | Jul 2017 | Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRATHAM RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tarabai Park880+ in Kolhapur
Filed coordinates, straight-line distance. 126 registered projects within 2 km.
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: PRATHAM DEVELOPERS
PRATHAM DEVELOPERS has 7 registrations on MahaRERA, including RAJHANS and PRATHAM RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that PRATHAM RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PRATHAM RESIDENCY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRATHAM RESIDENCY?
The registered promoter entity is PRATHAM DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAZFP9640G1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRATHAM RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRATHAM RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRATHAM RESIDENCY?
The professionals named in the filing: Architect: Amar Bhavnendra Upadhye; Architect: Amar Bhavanendra Upadhye; Engineer: Ranjit Mahadik; Engineer: Ranjit Agnu Mahadik; Chartered Accountant: Paragesh Joshi; Chartered Accountant: KISHOR R JOSHI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRATHAM RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback