Home / Browse projects / Raigarh, Maharashtra / PRATHAM PRIDE
PRATHAM PRIDE
RG-MH-28210 · RERA P52000025077 · Last updated on MahaRERA portal: 7 Jul 2025
Source: official MahaRERA filing
Red flags
- 21 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRATHAM PRIDE is a Residential / Group Housing project by Pratham Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000025077 on 18 Mar 2020. The registration is recorded completed; possession was promised by 29 Mar 2025. The completion date has moved by 12 months from the original filing. 21 complaints are on record with the regulator.
At a glance
Project
- NamePRATHAM PRIDE
- TypeResidential / Group Housing
- Location
- HISSA NO -B/ 1
- DEVAD
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000025077
- ReraGenie IDRG-MH-28210
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Mar 2020
- Promised completion29 Mar 2025
- Revised completionRevised to 29 Mar 2025 (originally 30 Mar 2024)
- Buildings1 building record
- Documents filed88 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRATHAM PRIDE | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
PRATHAM PRIDE: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Atul Patel Architects |
| Engineer | Adharshila Consultants |
| Chartered Accountant | RUTUJA NARSINGH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Pratham Infra | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Complaints filed with MahaRERA21
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504180 | MUKESH SUBHASH PATIL | Pratham Infra | 26/11/2025 |
| CC12504381 | SUHAS JANU GOVALKAR | Pratham Infra | 09/12/2025 |
| CC12504346 | VIJAY PRABHAKAR UPARKAR | Pratham Infra | 08/12/2025 |
| CC12504370 | PRATIK SANJAY MAGAR | Pratham Infra | 09/12/2025 |
| CC12504383 | UMESH BHAUSO SANKPAL | Pratham Infra | 09/12/2025 |
| CC12504345 | PARIJAT MORESHWAR PATIL | Pratham Infra | 08/12/2025 |
| CC12504373 | NAVNATH SURESH KHOCHADE | Pratham Infra | 09/12/2025 |
| CC12504367 | SACHIN TANAJI DINDE | Pratham Infra | 09/12/2025 |
| CC12504371 | DINESH SAMBHAJI MINDE | Pratham Infra | 09/12/2025 |
| CC12504372 | MAHESH SHANKAR KADAM | Pratham Infra | 09/12/2025 |
| CC12504376 | HARSHALA ALPESH KOKATE | Pratham Infra | 09/12/2025 |
| CC12504374 | SANGITA NATHURAM PATIL | Pratham Infra | 09/12/2025 |
| CC12504368 | SACHIN LAXMAN GHAWALI | Pratham Infra | 09/12/2025 |
| CC12504365 | SANDEEP BAPURAO WATGHARE | Pratham Infra | 09/12/2025 |
| CC12504363 | SIDDESH PRAMOD BHOSALE | Pratham Infra | 09/12/2025 |
| CC12504369 | SANDEEP MARUTI BANAP | Pratham Infra | 09/12/2025 |
| CC12504378 | DHARMESH JITENDRA BAGKAR | Pratham Infra | 09/12/2025 |
| CC12504377 | CHANDAN PRASAD | Pratham Infra | 09/12/2025 |
| CC12504361 | AMIT HANMANT WAGH | Pratham Infra | 09/12/2025 |
| CC12504362 | DHANANJAY SANJAY WANI | Pratham Infra | 09/12/2025 |
| CC12504380 | VIJAY GOVIND KAMBLE | Pratham Infra | 09/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Jun 2025
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: ef.pdf | 7 Jul 2025 |
| Building plan approvalFile: dde.pdf | 7 Jul 2025 |
| Building plan approvalFile: eff.pdf | 7 Jul 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: ef.pdf | 7 Jul 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: dde.pdf | 7 Jul 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: eff.pdf | 7 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June- 24.pdf | 2 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept- 24.pdf | 2 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec-24.pdf | 2 Jun 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC- Pratham Pride.pdf | 2 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept-24.pdf | 29 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec-24.pdf | 29 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March-25.pdf | 29 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June-24.pdf | 29 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June-24.pdf | 29 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept-24.pdf | 29 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec-24.pdf | 29 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March-25.pdf | 29 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A FY 19-20.pdf | 29 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 20-21.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: Cicular 29 June-24.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: Cicular 29 Sept-24.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: Cicular 29 Dec-24.pdf | 29 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 21-22.pdf | 29 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf | 29 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf | 29 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Pratham Infra.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKM_C226i24042915500_0001.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKM_C226i24042413120_0001.pdf | 24 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKM_C226i24042213330_0001 (1).pdf | 22 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 15 Apr 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 13 Apr 2024 |
| Declaration in FORM BFile: Form B.pdf | 13 Apr 2024 |
| CERSAI detailsFile: Declaration of CERSAI.pdf | 13 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 13 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 13 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 13 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 13 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 13 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 13 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Pratham Pride for FY 22-23.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2020.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2021.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-12-2021.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2022.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 30-06-2022.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 30-09-2022.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-12-2022.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2023.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2020.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2021.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham pride as on 31-12-2021.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2022.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 30-06-2022.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 30-09-2022.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-12-2022.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2023.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Pratham Pride 19-20.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Pratham Pride 20-21.pdf | 13 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Pratham Pride 21-22.pdf | 13 Jul 2023 |
| Layout approvalFile: FINAL MD SHEET-1.pdf | 28 Oct 2021 |
| Building plan approvalFile: FINAL MD SHEET-2.pdf | 28 Oct 2021 |
| Building plan approvalFile: FINAL MD SHEET-3.pdf | 28 Oct 2021 |
| Building plan approvalFile: FINAL MD SHEET-4.pdf | 28 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: FINAL MD SHEET-1.pdf | 28 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: FINAL MD SHEET-2.pdf | 28 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: FINAL MD SHEET-3.pdf | 28 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: FINAL MD SHEET-4.pdf | 28 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Amm1_CCLetter.pdf | 27 Oct 2021 |
| Declaration in FORM BFile: form B pratham pride.pdf | 11 Mar 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 pratham pride.pdf | 11 Mar 2020 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE - pratham infra.pdf | 11 Mar 2020 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 11 Mar 2020 |
| Layout approvalFile: Pratham Pride Plan_compressed (1)-1-2.pdf | 9 Mar 2020 |
| Building plan approvalFile: Pratham Pride Plan_compressed (1)-1-2.pdf | 9 Mar 2020 |
| Building plan approvalFile: Pratham Pride Plan_compressed (1)-3-4-1.pdf | 9 Mar 2020 |
| Building plan approvalFile: Pratham Pride Plan_compressed (1)-3-4-2.pdf | 9 Mar 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
Keep PRATHAM PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DEVAD5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Pratham Infra
Pratham Infra has 5 registrations on MahaRERA, including Pratham Swami Samarth and PRATHAM SHREE SAMARTH. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if PRATHAM PRIDE is delayed beyond 29 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRATHAM PRIDE?
The registered promoter entity is Pratham Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRATHAM PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PRATHAM PRIDE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PRATHAM PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRATHAM PRIDE?
The professionals named in the filing: Architect: Atul Patel Architects; Engineer: Adharshila Consultants; Chartered Accountant: RUTUJA NARSINGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRATHAM PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback