ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / PRATHAM PRIDE

Completed No litigation declared Residential / Group Housing project

PRATHAM PRIDE

By Pratham Infra

RG-MH-28210 · RERA P52000025077 · Last updated on MahaRERA portal: 7 Jul 2025

Source: official MahaRERA filing

Red flags

  • 21 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
21Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

PRATHAM PRIDE is a Residential / Group Housing project by Pratham Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000025077 on 18 Mar 2020. The registration is recorded completed; possession was promised by 29 Mar 2025. The completion date has moved by 12 months from the original filing. 21 complaints are on record with the regulator.

At a glance

Project

  • NamePRATHAM PRIDE
  • TypeResidential / Group Housing
  • Location
    • HISSA NO -B/ 1
    • DEVAD
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000025077
  • ReraGenie IDRG-MH-28210

Builder

  • NamePratham Infra
  • Entity typePartnership
  • PartnersMiheer Narendra Vedak, Narendra Moreshwar Vedak
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2020First promiseMar 2024Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Mar 2020
  • Promised completion29 Mar 2025
  • Revised completionRevised to 29 Mar 2025 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRATHAM PRIDENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

PRATHAM PRIDE: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,895 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2200.0
Proposed, not sanctioned1,835 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchP B NO 32, SHIVA COMPLEX,SECT-19, POST OFFICE ROAD, NEW PANVEL,MAHARASTRA, 410206

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerAdharshila Consultants
Chartered AccountantRUTUJA NARSINGH & ASSOCIATES
PartnerRole in project
Pratham Infra-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019707Mar 2024 → Mar 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA21

Case no.ComplainantRespondentFiled
CC12504180MUKESH SUBHASH PATILPratham Infra26/11/2025
CC12504381SUHAS JANU GOVALKARPratham Infra09/12/2025
CC12504346VIJAY PRABHAKAR UPARKARPratham Infra08/12/2025
CC12504370PRATIK SANJAY MAGARPratham Infra09/12/2025
CC12504383UMESH BHAUSO SANKPALPratham Infra09/12/2025
CC12504345PARIJAT MORESHWAR PATILPratham Infra08/12/2025
CC12504373NAVNATH SURESH KHOCHADEPratham Infra09/12/2025
CC12504367SACHIN TANAJI DINDEPratham Infra09/12/2025
CC12504371DINESH SAMBHAJI MINDEPratham Infra09/12/2025
CC12504372MAHESH SHANKAR KADAMPratham Infra09/12/2025
CC12504376HARSHALA ALPESH KOKATEPratham Infra09/12/2025
CC12504374SANGITA NATHURAM PATILPratham Infra09/12/2025
CC12504368SACHIN LAXMAN GHAWALIPratham Infra09/12/2025
CC12504365SANDEEP BAPURAO WATGHAREPratham Infra09/12/2025
CC12504363SIDDESH PRAMOD BHOSALEPratham Infra09/12/2025
CC12504369SANDEEP MARUTI BANAPPratham Infra09/12/2025
CC12504378DHARMESH JITENDRA BAGKARPratham Infra09/12/2025
CC12504377CHANDAN PRASADPratham Infra09/12/2025
CC12504361AMIT HANMANT WAGHPratham Infra09/12/2025
CC12504362DHANANJAY SANJAY WANIPratham Infra09/12/2025
CC12504380VIJAY GOVIND KAMBLEPratham Infra09/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jun 2025

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: ef.pdf7 Jul 2025
Building plan approvalFile: dde.pdf7 Jul 2025
Building plan approvalFile: eff.pdf7 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: ef.pdf7 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: dde.pdf7 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: eff.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June- 24.pdf2 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept- 24.pdf2 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec-24.pdf2 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC- Pratham Pride.pdf2 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept-24.pdf29 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec-24.pdf29 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March-25.pdf29 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June-24.pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June-24.pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept-24.pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec-24.pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March-25.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A FY 19-20.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 20-21.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Cicular 29 June-24.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Cicular 29 Sept-24.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Cicular 29 Dec-24.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 21-22.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf29 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Pratham Infra.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKM_C226i24042915500_0001.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKM_C226i24042413120_0001.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKM_C226i24042213330_0001 (1).pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf15 Apr 2024
Declaration about Commencement CertificateFile: Format D.pdf13 Apr 2024
Declaration in FORM BFile: Form B.pdf13 Apr 2024
CERSAI detailsFile: Declaration of CERSAI.pdf13 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf13 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Pratham Pride for FY 22-23.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2020.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2021.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-12-2021.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2022.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 30-06-2022.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 30-09-2022.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-12-2022.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pratham Pride as on 31-03-2023.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2020.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2021.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham pride as on 31-12-2021.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2022.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 30-06-2022.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 30-09-2022.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-12-2022.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pratham Pride as on 31-03-2023.pdf13 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Pratham Pride 19-20.pdf13 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Pratham Pride 20-21.pdf13 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Pratham Pride 21-22.pdf13 Jul 2023
Layout approvalFile: FINAL MD SHEET-1.pdf28 Oct 2021
Building plan approvalFile: FINAL MD SHEET-2.pdf28 Oct 2021
Building plan approvalFile: FINAL MD SHEET-3.pdf28 Oct 2021
Building plan approvalFile: FINAL MD SHEET-4.pdf28 Oct 2021
Copy of Layout Approval (in case of layout)File: FINAL MD SHEET-1.pdf28 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: FINAL MD SHEET-2.pdf28 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: FINAL MD SHEET-3.pdf28 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: FINAL MD SHEET-4.pdf28 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Amm1_CCLetter.pdf27 Oct 2021
Declaration in FORM BFile: form B pratham pride.pdf11 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 pratham pride.pdf11 Mar 2020
Proforma of Allotment letterFile: AGREEMENT FOR SALE - pratham infra.pdf11 Mar 2020
Proforma of Allotment letterFile: Allotment Letter.pdf11 Mar 2020
Layout approvalFile: Pratham Pride Plan_compressed (1)-1-2.pdf9 Mar 2020
Building plan approvalFile: Pratham Pride Plan_compressed (1)-1-2.pdf9 Mar 2020
Building plan approvalFile: Pratham Pride Plan_compressed (1)-3-4-1.pdf9 Mar 2020
Building plan approvalFile: Pratham Pride Plan_compressed (1)-3-4-2.pdf9 Mar 2020

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRATHAM PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEVAD5,900+ in Raigarh

Builder: Pratham Infra

Pratham Infra has 5 registrations on MahaRERA, including Pratham Swami Samarth and PRATHAM SHREE SAMARTH. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PRATHAM PRIDE is delayed beyond 29 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRATHAM PRIDE?

The registered promoter entity is Pratham Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRATHAM PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRATHAM PRIDE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRATHAM PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRATHAM PRIDE?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: Adharshila Consultants; Chartered Accountant: RUTUJA NARSINGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRATHAM PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRATHAM PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRATHAM PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.