ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Pote Pallacio

Registered No litigation declared Others project

Pote Pallacio

By PRAKASH GAJANAN POTE

RG-MH-05802 · RERA P52000051860 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 93%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Pote Pallacio is a Others project by PRAKASH GAJANAN POTE in Raigarh, Maharashtra, registered with MahaRERA as P52000051860 on 7 Jul 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NamePote Pallacio
  • TypeOthers
  • Location
    • Plot No. 107
    • Sector No. 11
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051860
  • ReraGenie IDRG-MH-05802

Builder

  • NamePRAKASH GAJANAN POTE
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Pote PallacioNA2616000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

Pote Pallacio: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)50%
Plinth80%
Stilt Floor50%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises36%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.34%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered63

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,378 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI6720.76
Proposed, not sanctioned6,721 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaje Complex, Plot No 198A, Shivaji Chowk, Panvel - 410206

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantNB Sayed & Associates
Chartered AccountantVikas Abhang & Associates
PartnerRole in project
PRAKASH GAJANAN POTE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Pote Pallcio as on March 2026.pdf27 Apr 2026
Form 2File: Form 2 - Pote Pallcio as on March 2026.pdf27 Apr 2026
Form 3File: Form 3 - Pote Pallcio as on March 2026.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pote Pallcio as on March 2026.pdf27 Apr 2026
Form 1File: Form 1 - Pote Pollacio as on Dec 2025.pdf2 Feb 2026
Form 2File: Form 2 - Pote Pollacio as on Dec 2025.pdf2 Feb 2026
Form 3File: Form 3 - Pote Pollacio as on Dec 2025.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pote Pollacio as on Dec 2025.pdf2 Feb 2026
Form 1File: Form 1 - Pote Pallacio as on Sep 2025.pdf19 Oct 2025
Form 2File: Form 2 - Pote Pollacio as on Sep 2025.pdf19 Oct 2025
Form 3File: Form 3 - Pote Pallacio as on 30th September2025.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pote Pallacio as on Sept 2025.pdf19 Oct 2025
Form 1File: Form 1 - Pote Pallacio as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Pote Pollacio as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Pote Pallacio as on 30th June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pote Pallacio as on June 2025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on 31st March 2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_PotePallacio_MARCH-2025).pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Pote Pallacio for FY 2023-24.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pote Pallacio as on Dec 2024.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on 31st December 2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on 31-12-2024.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - POTE PALLACIO.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pote Pallacio 30 Sept 24.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on 30th September 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on 30-09-2024.pdf20 Oct 2024
Layout approvalFile: Plan 1.pdf16 Aug 2024
Building plan approvalFile: Plan 2 - 6.pdf16 Aug 2024
Copy of Layout Approval (in case of layout)File: Plan 1.pdf16 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 - 6.pdf16 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pote Pollacio as on June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on 30th June 2024.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: POTE PALLACIO-SOLD UNSOLD.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pote Pallacio as on March 2024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on 31st March 2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Pote Pallacio as on Dec 2023.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Pote Pallacio Dec 2023.pdf14 Mar 2024
Layout approvalFile: Binder1.pdf30 Jan 2024
Layout approvalFile: Binder2.pdf30 Jan 2024
Copy of Layout Approval (in case of layout)File: Binder1.pdf30 Jan 2024
Copy of Layout Approval (in case of layout)File: Binder2.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pote Pallacio as on Dec 2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on Dec 2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pote Pallacio as on Sep 2023.pdf11 Dec 2023
Proforma of Agreement for saleFile: Pote Pallacio - AFS.pdf25 Nov 2023
Building plan approvalFile: Page 1 to 2.pdf8 Nov 2023
Building plan approvalFile: Page 3 to 4.pdf8 Nov 2023
Building plan approvalFile: Page 5 to 6.pdf8 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 1 to 2.pdf8 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 3 to 4.pdf8 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 5 to 6.pdf8 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Pote Pallacio- Ammended CC.pdf8 Nov 2023
Disclosure of sold/ booked inventoryFile: Circular 29- POTE PALLACIO.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pote Pollacio as on 30-09-2023.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pote Pallacio as on 30-09-2023.pdf1 Nov 2023
Declaration about Commencement CertificateFile: Format-D_pallacio.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 - Pote Pallacio.pdf22 Jun 2023
Layout approvalFile: Page 1_11zon.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Legal.pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: Page 1_11zon.pdf12 Jun 2023
Proforma of Allotment letterFile: New Allotment Letter_Pote Pallacio_Shree Krupa Developers_12062023.pdf12 Jun 2023
Building plan approvalFile: Page 1_11zon.pdf8 Jun 2023
Building plan approvalFile: Page 2, 3, 4.pdf8 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 1_11zon.pdf8 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 2, 3, 4.pdf8 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Jun 2023
Declaration in FORM BFile: Form B- Promoter.pdf30 May 2023
CERSAI detailsFile: Cersai Declaration.pdf30 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf30 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf30 May 2023
Deviation Report with respect to Allotment letterFile: Deviation-Allotment Letter.pdf30 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation - Agreement for Sale.pdf30 May 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Pote SapphirePlot No -45 Sector - 5A Karanjade36CompletedJun 2023Dec 2021
Pote AalayaS No 4222B1 Vihighar Panvel71CompletedDec 2019Late, Jan 2020
SHREE KRUPA PRIDEPlot No. 68 Sector 35E Kharghar17CompletedMar 2013Late, Sep 2013

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pote Pallacio on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar5,900+ in Raigarh

2 kmPote PallacioCompleted 23Lapsed / revoked 4Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: PRAKASH GAJANAN POTE

PRAKASH GAJANAN POTE has 3 registrations on MahaRERA, including POTE AALAYA and POTE SAPPHIRE. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Pote Pallacio is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pote Pallacio?

The registered promoter entity is PRAKASH GAJANAN POTE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pote Pallacio?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pote Pallacio?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pote Pallacio?

The professionals named in the filing: Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Vikas Abhang & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pote Pallacio?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pote Pallacio. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pote Pallacio to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.