Home / Browse projects / Raigarh, Maharashtra / POTE NILAYA

Completed No litigation declared Others project

POTE NILAYA

By PRATIK PRAKASH POTE

RG-MH-22917 · RERA P52000024137 · Last updated on MahaRERA portal: 30 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

POTE NILAYA is a Others project by PRATIK PRAKASH POTE in Raigarh, Maharashtra, registered with MahaRERA as P52000024137 on 21 Jan 2020. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NamePOTE NILAYA
  • TypeOthers
  • Location
    • Hissa No -2/2/A
    • Panvel
    • Vihighar
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000024137
  • ReraGenie IDRG-MH-22917

Builder

  • NamePRATIK PRAKASH POTE
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJan 2020PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jan 2020
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
POTE NILAYANA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

POTE NILAYA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,946 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2929.07
Proposed, not sanctioned2,929 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No -198A, Rajje Complex Shivaji Chowk Panvel 410206

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISTAAR ARCHITECTS
EngineerYATESH TARE
Chartered AccountantRUTUJA SAJJAN NARSINGH
PartnerRole in project
PRATIK PRAKASH POTE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jan 2023

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 as on 2022-23.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NILAYA-FORM-5-FY-21-22_compressed.pdf24 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Pote Nilaya.pdf6 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Pote Nilaya as on December 2022.pdf4 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya Dec 22.pdf4 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4.pdf3 Apr 2023
Declaration about Commencement CertificateFile: Format D- Pote Nilaya.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-21-12-2022 NILAYA.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_ Nilaya _ 21-22.pdf11 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- POTE NILAYA.pdf11 Jan 2023
Disclosure of sold/ booked inventoryFile: Circular 29- Pote Nilaya.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pote Nilaya - Form 2 as on September 2022.pdf29 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Pote Nilaya as on September 22_compressed.pdf29 Nov 2022
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 POTE NILAYA.pdf27 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pote Nilaya - Form 2_June_2022.pdf30 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya June 2022_compressed.pdf30 Jul 2022
Details of encumbrancesFile: Nilaya Encumbrances.pdf12 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pote Nilaya - Form 2_March_2022.pdf10 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Pote Nilaya_March_2022_compressed.pdf10 May 2022
Layout approvalFile: plan pote nilaya 1.pdf12 Apr 2022
Building plan approvalFile: 2-3 Pote plan.pdf12 Apr 2022
Building plan approvalFile: Pote Plan pg 4.pdf12 Apr 2022
Building plan approvalFile: plan pote nilaya 5 -6.pdf12 Apr 2022
Copy of Layout Approval (in case of layout)File: plan pote nilaya 1.pdf12 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2-3 Pote plan.pdf12 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Pote Plan pg 4.pdf12 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: plan pote nilaya 5 -6.pdf12 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Signed ACC letter BP.pdf12 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-NILAYA-2020-2021.pdf23 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-NILAYA-2021-2022.pdf23 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NILAYA-FORM-5-FY-19-20.pdf23 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NILAYA-FORM-5.pdf9 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pote Nilaya Dec 2021_compressed.pdf9 Feb 2022
CERSAI detailsFile: Pote Nilaya.pdf9 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya December 2021_compressed.pdf9 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pote Nilaya Sept 2021.pdf23 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya September 2021 s.pdf22 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pote Nilaya Form 2 June 2021.pdf1 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya June 2021.pdf1 Sep 2021
Declaration about Commencement CertificateFile: POTE NILAYA -POTE REALTY.pdf22 Jul 2021
Disclosure of sold/ booked inventoryFile: POTE NILAYA -POTE REALTY -SOLD UNSOLD LIST.pdf22 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -30 06 2021-NILAYA-1_compressed.pdf10 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 POTE NILAYA MARCH 2021.pdf30 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya Mar 2021.pdf30 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pote Nilaya Dec 2020_compressed.pdf15 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya Dec 2020.pdf15 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Pote Nilaya.pdf7 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pote Nilaya March 2020.pdf7 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pote Nilaya June 2020.pdf7 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pote Nilaya Sept 2020.pdf7 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya Mar 2020_compressed.pdf7 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya June 2020_compressed.pdf7 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pote Nilaya Sept 2020_compressed.pdf7 Dec 2020
Declaration in FORM BFile: FORM B REVISED.pdf17 Jan 2020
Proforma of Allotment letterFile: AGREEMENT FOR SALE - PRATIK POTE -POTE NILAYA.pdf17 Jan 2020
Proforma of Allotment letterFile: Allotment Letter-PRATIK POTE -POTE NILAYA.pdf17 Jan 2020
Layout approvalFile: ilovepdf_merged (19).pdf10 Jan 2020
Layout approvalFile: ilovepdf_merged (20).pdf10 Jan 2020
Building plan approvalFile: ilovepdf_merged (19).pdf10 Jan 2020
Building plan approvalFile: ilovepdf_merged (20).pdf10 Jan 2020
PAN CardFile: pratik pote pan card.pdf10 Jan 2020
Copy of the legal title reportFile: Search Title Certificate compressed.pdf10 Jan 2020
Details of encumbrancesFile: encumbrance pote nilaya.pdf10 Jan 2020
Copy of Layout Approval (in case of layout)File: ilovepdf_merged (19).pdf10 Jan 2020
Copy of Layout Approval (in case of layout)File: ilovepdf_merged (20).pdf10 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (19).pdf10 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (20).pdf10 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: CC compressed.pdf10 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 pote Nilaya.pdf10 Jan 2020

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep POTE NILAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

Builder: PRATIK PRAKASH POTE

PRATIK PRAKASH POTE has 2 registrations on MahaRERA, including POTE NILAYA and Pote Emrald. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if POTE NILAYA is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of POTE NILAYA?

The registered promoter entity is PRATIK PRAKASH POTE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in POTE NILAYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for POTE NILAYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at POTE NILAYA?

The professionals named in the filing: Architect: VISTAAR ARCHITECTS; Engineer: YATESH TARE; Chartered Accountant: RUTUJA SAJJAN NARSINGH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POTE NILAYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POTE NILAYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POTE NILAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.