Home / Browse projects / Palghar, Maharashtra / POONAM PARK VIEW PHASE I

Completed No litigation declared Others project

POONAM PARK VIEW PHASE I

By POONAM HOMEMAKER LLP

RG-MH-26918 · RERA P99000002563 · Last updated on MahaRERA portal: 10 Mar 2019

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2019Possession promisedregistration recorded completed
55 of 55Construction stages doneacross 5 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

POONAM PARK VIEW PHASE I is a Others project by POONAM HOMEMAKER LLP in Palghar, Maharashtra, registered with MahaRERA as P99000002563 on 1 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2019.

At a glance

Project

  • NamePOONAM PARK VIEW PHASE I
  • TypeOthers
  • Location
    • OPP. CLUB ONE
    • GLOBAL CITY
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000002563
  • ReraGenie IDRG-MH-26918

Builder

  • NamePOONAM HOMEMAKER LLP
  • Entity typeOthers
  • PartnersASHWIN MANEK MEHTA, MANEK JUGRAJ MEHTA
  • Named personsASHWIN MANEK MEHTA, MANEK JUGRAJ MEHTA, PABAL HOUSING PVT LTD
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017PromisedJun 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion30 Jun 2019
  • Revised completionNone
  • Buildings5 building records
  • Documents filed44 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA170000
B WINGNA170000
C WINGNA170000
D WINGNA160000
E WINGNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 10 Mar 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

55 of 55 construction stages are filed complete across 5 buildings.

A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Mar 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered45
BuildingClosed/CoveredTotal
A WING44
B WING77
C WING66
D WING1414
E WING1414

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,037 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
EVERSHINE DEVELOPERSMumbai CityMumbai City

Approvals and building plan

Permissible FSI18392.34
Proposed, not sanctioned18,392 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS V ROAD BANDRA WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAH GATTANI CONSULTANTS
EngineerJW CONSULTANTS LLP
PartnerRole in project
POONAM HOMEMAKER LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: FORM 4.pdf10 Mar 2019
Certificates of CA (Form 5)File: PHM LLP FORM 5.pdf30 Sep 2018
Layout approvalFile: LAYOUT PLAN.pdf31 Jul 2018
Layout approvalFile: A WING 1.pdf31 Jul 2018
Layout approvalFile: A WING 2.pdf31 Jul 2018
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf31 Jul 2018
Copy of Layout Approval (in case of layout)File: A WING 1.pdf31 Jul 2018
Copy of Layout Approval (in case of layout)File: A WING 2.pdf31 Jul 2018
Building plan approvalFile: REVISED PERMISSION.pdf24 May 2018
Layout approvalFile: REVISED PERMISSION.pdf24 May 2018
Copy of Layout Approval (in case of layout)File: REVISED PERMISSION.pdf24 May 2018
Building Plan Approval (IOD)File: REVISED PERMISSION.pdf24 May 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER POONAM PARK VIEW.pdf23 May 2018
Proforma of Allotment letterFile: DRAFT AGREEMENT-ilovepdf-compressed.pdf13 Nov 2017
Layout approvalFile: downloadE1.pdf29 Jul 2017
Layout approvalFile: downloadE.pdf29 Jul 2017
Layout approvalFile: downloadD1.pdf29 Jul 2017
Layout approvalFile: downloadD.pdf29 Jul 2017
Layout approvalFile: downloadA1.pdf29 Jul 2017
Layout approvalFile: downloadB1.pdf29 Jul 2017
Layout approvalFile: downloadB.pdf29 Jul 2017
Layout approvalFile: downloadA.pdf29 Jul 2017
Building plan approvalFile: revised permission 2015.pdf29 Jul 2017
Layout approvalFile: downloadD.pdf29 Jul 2017
PAN CardFile: LLP PAncard.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf29 Jul 2017
Copy of the legal title reportFile: Title_Certificate_Avenue_L-5_-_13_12_2016.pdf29 Jul 2017
Details of encumbrancesFile: PARKVIEW ENCUM.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadA.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadA1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadB.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadB1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadD.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadD1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadE.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadE1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: downloadD.pdf29 Jul 2017
Building Plan Approval (IOD)File: revised permission 2015.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: revised permission 2015.pdf29 Jul 2017
Declaration in FORM BFile: HOMEMAKER FORM B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PARKVIEW ARCHITECT.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PARKVIEW ENGINEER (2).pdf29 Jul 2017
Certificates of CA (Form 3)File: LLP FORM 3-ilovepdf-compressed.pdf29 Jul 2017
Proforma of Allotment letterFile: HOMEMAKER ALLOTMENT.pdf29 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep POONAM PARK VIEW PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GLOBAL CITY3,200+ in Palghar

2 kmPOONAM PARK VIEW PHASE ICompleted 67Lapsed / revoked 43Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: POONAM HOMEMAKER LLP

POONAM HOMEMAKER LLP has 2 registrations on MahaRERA, including POONAM PARK VIEW PHASE I and POONAM PARK VIEW PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if POONAM PARK VIEW PHASE I is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of POONAM PARK VIEW PHASE I?

The registered promoter entity is POONAM HOMEMAKER LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in POONAM PARK VIEW PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for POONAM PARK VIEW PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at POONAM PARK VIEW PHASE I?

The professionals named in the filing: Architect: SHAH GATTANI CONSULTANTS; Engineer: JW CONSULTANTS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POONAM PARK VIEW PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POONAM PARK VIEW PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POONAM PARK VIEW PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.