POLOROCHE BUSINESS AVENUE

By Poloroche Business Avenue LLP

RG-MH-16103 · RERA P52100024844 · Last updated on MahaRERA portal: 7 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

POLOROCHE BUSINESS AVENUE is a Commercial project by Poloroche Business Avenue LLP in Pune, Maharashtra, registered with MahaRERA as P52100024844 on 9 Mar 2020. Possession was promised by 31 Oct 2024 and is now 24 months past that date. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NamePOLOROCHE BUSINESS AVENUE
  • TypeCommercial
  • Location
    • VIP ROAD
    • AIRPORT ROAD
    • LOHGAON
    • Haveli
    • Pune
    • 411047
  • Pincode411047
  • RERA no.P52100024844
  • ReraGenie IDRG-MH-16103

Builder

  • NamePoloroche Business Avenue LLP
  • Entity typePartnership
  • PartnersMUKESH RANJEET BAMBOLI, PARMAZ GREEN ARCADE LLP

Key dates

24 months past promisethis monthRegisteredMar 2020First promiseJul 2024Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Mar 2020
  • Promised completion31 Oct 2024
  • Revised completionRevised to 31 Oct 2024 (originally 31 Jul 2024)
  • Buildings1 building record
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABIL BUSINESS AVENUENA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

ABIL BUSINESS AVENUE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Landscaping and Tree PlantingYes100%

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
ABIL PROPBUILD LLPPune (M Corp.)Pune
NITIN CHAVANPune (M Corp.)Pune
RANJEET DARAKAurangabad (M Corp.)Aurangabad
BRIDGEPORT PROPERTIES LLP-Pune
BALAJI REALTY AND INFRASTRUCTUREPimpariPune
ARVIND THAKKARGultekadiPune
RANJEET THAKKARGultekadiPune

Approvals and building plan

Permissible FSI27000.0
Proposed, not sanctioned23,982 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch93 SHOP NO 1 RAJYOG CREATION ITI ROAD AUNDH PUNE 411 007

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAGDISH P DESHPANDE
EngineerONKAR JADHAV
Chartered AccountantSUPRIYA ABHIJIT MUNDADA
PartnerRole in project
Poloroche Business Avenue LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024443Jul 2024 → Oct 2024

Reason as filed by the promoterThe development of the real estate is carried out as per timelines committed at the time of registration of the said project with MAHARERA. It may be kindly noted that we have already applied for obtaining the ‘Consent to Operate’ on 27th June, 2024, and applied for Drainage NOC also from Pune Municipal Corporation, Pune, so as to obtain other related NOC prior to obtaining the completion certificate for the said project, since substantially all the works are already completed in relation to the said project. Along with this we are shortly paying the Road Development Charges payable to the san

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Dec 2024

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: PBA society formation certificate.pdf7 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PBA.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Poloroche.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PBA.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PBA.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold PBA.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Poloroche.pdf15 Apr 2025
OtherFile: Poloroche full OC.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-unsold poloroche.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Poloroche.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Poloroche.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Poloroche.pdf4 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: poloroche FORM 5.pdf27 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: poloroche FORM 5.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: poloroche FORM 5.pdf27 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Poloroche Part OC.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold unsold poloroche.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Poloroche Business Avenue.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Poloroche Business Avenue.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Poloroche business avenue.pdf22 Oct 2024
Declaration in FORM BFile: Annexure-I Form B.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: sold inventoey.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 correct.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 May 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a2122.pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a2223.pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a2324.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: sold inventory.pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- not uploaded yet.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY BA.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BA.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 BA.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BA.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC0367 18052022.pdf13 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 20230805165132.pdf13 Oct 2023
Disclosure of sold/ booked inventoryFile: sold inventory.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold inventory.pdf24 Apr 2023
Details of encumbrancesFile: details of encumbrance.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 correct.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: sold inventory march 23.pdf10 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: sold inventory.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed (4).pdf17 Jan 2023
OtherFile: poloroche business avenue.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OCT.pdf27 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 OCT.pdf27 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCT 221015 VIMANNAGAR.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 APRIL.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 OCT Engineer Certificate Business Avenue Sept 22.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY OCT.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Poloroche.pdf27 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Poloroche Business Avenue LLP Certificate Form 3_0001_compressed.pdf27 Jul 2022
OtherFile: Supplementary Deed.pdf12 Apr 2022
OtherFile: Supplementary Deed.pdf12 Apr 2022
OtherFile: Supplementary Deed (2).pdf12 Apr 2022
OtherFile: Supplimental Deed_Poloroche.pdf12 Apr 2022
Disclosure of sold/ booked inventoryFile: SKM_22722032116300.pdf21 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Business Avenue.pdf31 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Business Avenue_compressed.pdf31 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Business Avenue_compressed.pdf11 Jan 2022
Declaration about Commencement CertificateFile: scan_20211203_161007.pdf7 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf22 Nov 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 3 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep POLOROCHE BUSINESS AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AIRPORT ROAD13,700+ in Pune

Builder: Poloroche Business Avenue LLP

Poloroche Business Avenue LLP has 1 registration on MahaRERA, including POLOROCHE BUSINESS AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that POLOROCHE BUSINESS AVENUE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if POLOROCHE BUSINESS AVENUE is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of POLOROCHE BUSINESS AVENUE?

The registered promoter entity is Poloroche Business Avenue LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in POLOROCHE BUSINESS AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for POLOROCHE BUSINESS AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at POLOROCHE BUSINESS AVENUE?

The professionals named in the filing: Architect: JAGDISH P DESHPANDE; Engineer: ONKAR JADHAV; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POLOROCHE BUSINESS AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POLOROCHE BUSINESS AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POLOROCHE BUSINESS AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.