Home / Browse projects / Nagpur, Maharashtra / PMAY KH. NO. 63 MZ TARODI KHURD

Registration lapsed No litigation declared Residential / Group Housing project

PMAY KH. NO. 63 MZ TARODI KHURD

By Nagpur Metropolitan Regional Development Authority

RG-MH-47325 · RERA P50500018810 · Last updated on MahaRERA portal: 14 Nov 2018

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
160 of 759Construction stages doneacross 69 buildings; furthest along: Slabs of Super Structure, 60%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

PMAY KH. NO. 63 MZ TARODI KHURD is a Residential / Group Housing project by Nagpur Metropolitan Regional Development Authority in Nagpur, Maharashtra, registered with MahaRERA as P50500018810 on 5 Dec 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NamePMAY KH. NO. 63 MZ TARODI KHURD
  • TypeResidential / Group Housing
  • Location
    • 18 MT ROAD
    • NEAR SYMBIOSIS UNIVERSITY
    • Tarodi kh
    • Kamptee
    • Nagpur
    • 440035
  • Pincode440035
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500018810
  • ReraGenie IDRG-MH-47325

Builder

  • NameNagpur Metropolitan Regional Development Authority
  • Entity typePublic Authority
  • ChairpersonDeepak Mhaisekar
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredDec 2018PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Dec 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings69 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A1NA50000
Block A2NA50000
Block A3NA50000
Block B1NA50000
Block B2NA50000
Block B3NA50000
BloCk B4NA50000
Block B5NA50000
Block B6NA50000
Block B7NA50000
Block B8NA50000
Block B9NA50000
Block B10NA50000
Block B11NA50000
Block B12NA50000
Block B13NA50000
Block B14NA50000
Block B15NA50000
Block B16NA50000
Block B17NA50000
Block B18NA50000
Block B19NA50000
Block B20NA50000
Block B21NA50000
Block B22NA50000
Block B23NA50000
Block B24NA50000
Block B25NA50000
Block B26NA50000
Block B27NA50000
Block B28NA50000
Block B29NA50000
Block B30NA50000
Block B31NA50000
Block B32NA50000
Block B33NA50000
Block B34NA50000
Block B35NA50000
Block B36NA50000
Block B37NA50000
Block B38NA50000
Block B39NA50000
Block B40NA50000
Block B41NA50000
Block B42NA50000
Block B43NA50000
Block B44NA50000
Block B45NA50000
Block B46NA50000
Block B47NA50000
Block B48NA50000
Block B49NA50000
Block B50NA50000
Block B51NA50000
Block B52NA50000
Block B53NA50000
Block B54NA50000
Block B55NA50000
Block B56NA50000
Block B57NA50000
Block B58NA50000
Block B59NA50000
Block B60NA50000
Block CNA50000
Block DNA10000
Block ENA10000
Block FNA10000
Block GNA10000
Block HNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 14 Nov 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 69 buildings; the table lists the first 20.

160 of 759 construction stages are filed complete across 69 buildings. The stage furthest along is Slabs of Super Structure, at 60%.

Block A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block A29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block A39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B118%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B218%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B338%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BloCk B438%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B555%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B655%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B755%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B855%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B955%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B1055%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B1155%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B1255%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B1355%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B1455%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B169%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block B1727%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Nov 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Open Space19
BuildingOpen SpaceTotal
Block A111
Block A211
Block A311
Block B111
Block B211
Block B311
BloCk B411
Block B511
Block B611
Block B711
Block B811
Block B911
Block B1011
Block B1111
Block B1211
Block B1311
Block B1411
Block B1511
Block B1611

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area64,236 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI77083.3
Proposed, not sanctioned77,083 sq m
Buildings approved69
Buildings sanctioned69

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMG House Civil Lines, Nagpur

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri Kishor Chidarwar
PartnerRole in project
Nagpur Metropolitan Regional Development Authority-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Affidavit Cum Declaration for Tarodi (khurd) 63 Notarised.pdf14 Nov 2018
PAN CardFile: Pan Card NMRDA.pdf30 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 11 to 20.pdf29 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 21 to 25.pdf29 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 1 to 10.pdf27 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Form 2 Tarodi 63.pdf27 Oct 2018
Details of encumbrancesFile: Details of Encumbrance Tarodi 63.pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate 1 to 10.pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate 11 to 20 (1).pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate 21 to 30 (1).pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate 31 to 40 (1).pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate 41 to 50 (1).pdf25 Oct 2018
Certificates of CA (Form 3)File: CA Certificate 51 to 54 pdf.pdf25 Oct 2018
Building plan approvalFile: TARODI 63 SANCTION PLAN 1 681X1100.pdf19 Oct 2018
Building plan approvalFile: TARODI 63 SANCTION PLAN 2 826X1070(2).pdf19 Oct 2018
Building plan approvalFile: TARODI 63 SANCTION PLAN 3 737X762.pdf19 Oct 2018
Building plan approvalFile: TARODI 63 SANCTION PLAN 4 768X752.pdf19 Oct 2018
Building plan approvalFile: TARODI 63 SANCTION PLAN 5 768X752(1).pdf19 Oct 2018
Building plan approvalFile: TARODI 63 SANCTION PLAN 6 740X1060(1).pdf19 Oct 2018
Layout approvalFile: TARODI 63 LAYOUT LETTER 1.pdf19 Oct 2018
Layout approvalFile: TARODI 63 LAYOUT LETTER 2.pdf19 Oct 2018
Layout approvalFile: TARODI 63 LAYOUT LETTER 3.pdf19 Oct 2018
Copy of the legal title reportFile: 7 bara tarodi 63.pdf19 Oct 2018
Copy of the legal title reportFile: Tarodi K Prat 63 Image_to_JPG0122-01.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_001.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_002.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_003.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_004.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_005.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_006.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_007.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_008.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_009.pdf19 Oct 2018
Copy of the legal title reportFile: AWARD - TARODI (khurd) 62,63_010.pdf19 Oct 2018
Copy of Layout Approval (in case of layout)File: TARODI 63 LAYOUT LETTER 1.pdf19 Oct 2018
Copy of Layout Approval (in case of layout)File: TARODI 63 LAYOUT LETTER 2.pdf19 Oct 2018
Copy of Layout Approval (in case of layout)File: TARODI 63 LAYOUT LETTER 3.pdf19 Oct 2018
Building Plan Approval (IOD)File: TARODI 63 SANCTION PLAN 1 681X1100.pdf19 Oct 2018
Building Plan Approval (IOD)File: TARODI 63 SANCTION PLAN 2 826X1070(2).pdf19 Oct 2018
Building Plan Approval (IOD)File: TARODI 63 SANCTION PLAN 3 737X762.pdf19 Oct 2018
Building Plan Approval (IOD)File: TARODI 63 SANCTION PLAN 4 768X752.pdf19 Oct 2018
Building Plan Approval (IOD)File: TARODI 63 SANCTION PLAN 5 768X752(1).pdf19 Oct 2018
Building Plan Approval (IOD)File: TARODI 63 SANCTION PLAN 6 740X1060(1).pdf19 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: TARODI 63 PERMIT 1.pdf19 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: TARODI 63 PERMIT 2.pdf19 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: TARODI 63 PERMIT 3.pdf19 Oct 2018
Proforma of Allotment letterFile: Allotment Letter with Conditions.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_001.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_002.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_003.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_004.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_005.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_006.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_007.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_008.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_009.pdf19 Oct 2018
Proforma of Allotment letterFile: Lease Deed Rera - Copy_010.pdf19 Oct 2018

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PMAY KH. NO. 63 MZ TARODI KHURD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SYMBIOSIS UNIVERSITY2,800+ in Nagpur

2 kmPMAY KH. NO. 63 MZ TARODLapsed / revoked 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Nagpur Metropolitan Regional Development Authority

Nagpur Metropolitan Regional Development Authority has 3 registrations on MahaRERA, including PMAY KH. NO. 63 MZ TARODI KHURD and PMAY Kh. No. 62 Mz Tarodi Khurd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that PMAY KH. NO. 63 MZ TARODI KHURD shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PMAY KH. NO. 63 MZ TARODI KHURD is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PMAY KH. NO. 63 MZ TARODI KHURD?

The registered promoter entity is Nagpur Metropolitan Regional Development Authority, a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PMAY KH. NO. 63 MZ TARODI KHURD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PMAY KH. NO. 63 MZ TARODI KHURD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PMAY KH. NO. 63 MZ TARODI KHURD?

The professionals named in the filing: Architect: Shri Kishor Chidarwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PMAY KH. NO. 63 MZ TARODI KHURD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PMAY KH. NO. 63 MZ TARODI KHURD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PMAY KH. NO. 63 MZ TARODI KHURD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.