Home / Browse projects / Raigarh, Maharashtra / Plot No 1 Sec-8A, Kharkopar West

Registered No litigation declared Residential / Group Housing project

Plot No 1 Sec-8A, Kharkopar West

By CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED

RG-MH-31412 · RERA P52000079747 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 21 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
0 of 88Construction stages doneacross 8 buildings; furthest along: Excavation, 0%
11 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Plot No 1 Sec-8A, Kharkopar West is a Residential / Group Housing project by CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000079747 on 24 Mar 2025. Possession is promised by 1 May 2027. 0 of the 11 units on this registration are recorded sold or booked, and 0 of 88 construction stages are filed complete.

At a glance

Project

  • NamePlot No 1 Sec-8A, Kharkopar West
  • TypeResidential / Group Housing
  • Location
    • Plot No 1 Sec-8A
    • Kharkopar West
    • Near Railway Station
    • Kharkopar
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000079747
  • ReraGenie IDRG-MH-31412

Builder

  • NameCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
  • Entity typeCompany
  • CINU99999MH1970SGC014574
  • Other registrations21 more →
  • Completed7 of 22
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredMar 2025PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Mar 2025
  • Promised completion1 May 2027
  • Revised completionNone
  • Buildings8 building records
  • Documents filed74 files

Current status

0%0 of 11 units booked

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EA-01NA151411011
EA-02NA150000
EA-03NA150000
EA-04NA150000
EA-05NA150000
EA-06NA150000
EA-07NA150000
EA-08NA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Excavation, at 0%.

EA-010%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-020%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-030%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-040%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-050%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-060%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-070%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EA-080%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed232

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots232
Closed/Covered8
Open Space224
BuildingClosed/CoveredOpen SpaceTotal
EA-0112829
EA-0212829
EA-0312829
EA-0412829
EA-0512829
EA-0612829
EA-0712829
EA-0812829

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,056 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
CIDCO LtdMumbai CityMumbai City

Approvals and building plan

Permissible FSI38369.07
Proposed, not sanctioned29,083 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKonkan Bhavan, CBD Belapur , Navi Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHafeez Contractor
EngineerCIDCO Ltd
Chartered AccountantSM Bhatt
PartnerRole in project
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 May 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form1_Mar26.pdf17 Apr 2026
Form 2File: Form 2- Plot-08 Sec-08.pdf17 Apr 2026
Form 3File: Form 3 -plot 1.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure-plot-01.pdf17 Apr 2026
Form 1File: Plot01_Form01_Dec25.pdf3 Feb 2026
Form 2File: Plot01_Form_02_Dec25.pdf3 Feb 2026
Form 3File: Plot01_Form03_Dec25_11zon.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Plot01_Disclosure_Dec25_11zon.pdf3 Feb 2026
Form 1File: FORM_01_PLOTNO_08_11zon.pdf20 Oct 2025
Form 2File: FORM_02_PLOTNO_08.pdf20 Oct 2025
Form 3File: FORM_03_PLOTNO_08_11zon.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE_PLOTNO_08_11zon.pdf20 Oct 2025
Form 2File: Form2_Plot01_sec8A_Jun25.pdf18 Jul 2025
Form 3File: Form_3_plot01_June2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: DoS_Plot01_Jun25.pdf18 Jul 2025
Form 1File: Form2_Plot01_sec8A_Jun25.pdf18 Jul 2025
Form 2File: Form2_Plot01_sec8A_Mar25.pdf18 Jul 2025
Form 3File: Form_3_plot01_Mar2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: DoS_Plot01_Mar25.pdf18 Jul 2025
Form 1File: Form2_Plot01_sec8A_Mar25.pdf18 Jul 2025
Other - LegalFile: Land record plot-01.pdf21 Mar 2025
Layout approvalFile: AHC_CIDCO_MD_P4-03-SL_100-Reprint1.pdf20 Mar 2025
Layout approvalFile: P1 Elevation 300.pdf20 Mar 2025
Layout approvalFile: P1 Elevation-301R.pdf20 Mar 2025
Layout approvalFile: P1 FP 100.pdf20 Mar 2025
Layout approvalFile: P1 FP 101.pdf20 Mar 2025
Layout approvalFile: P1 FP 102.pdf20 Mar 2025
Layout approvalFile: P1 FP 103.pdf20 Mar 2025
Layout approvalFile: P1 FP 104.pdf20 Mar 2025
Layout approvalFile: P1 FP 105.pdf20 Mar 2025
Layout approvalFile: P1 Sec Drawings.pdf20 Mar 2025
Layout approvalFile: P1 SL 101R.pdf20 Mar 2025
Building plan approvalFile: P1 SL 102.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 FP 104.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 SL 101R.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 Sec Drawings.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 FP 105.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 FP 103.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 FP 102.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 FP 101.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 FP 100.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 Elevation-301R.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: P1 Elevation 300.pdf20 Mar 2025
Copy of Layout Approval (in case of layout)File: AHC_CIDCO_MD_P4-03-SL_100-Reprint1.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: P1 SL 102.pdf20 Mar 2025
Other - TechnicalFile: Plinth Completion Plot-01.pdf20 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of loan plot-01.pdf20 Mar 2025
Other - TechnicalFile: Annexure A plot-01.pdf18 Mar 2025
Building plan approvalFile: AHC_CIDCO_MD_P4-03-SL_100-Reprint1.pdf15 Mar 2025
Details of encumbrances concerned to FinanceFile: TO WHOMSOEVER IT MY CONCERN PLOT_1.pdf15 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: AHC_CIDCO_MD_P4-03-SL_100-Reprint1.pdf15 Mar 2025
CERSAI detailsFile: CERSAI_Search_Report_PLOT-01 SEC-8a kk.pdf15 Mar 2025
Details of encumbrances concerned to LegalFile: TO WHOMSOEVER IT MY CONCERN PLOT_1.pdf15 Mar 2025
Other - TechnicalFile: Form B plot-01.pdf15 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format_B Plot_1.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_plot1_11.pdf21 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A Plot_1 KK.pdf21 Feb 2025
Deviation Report with respect to Allotment letterFile: No deviation decl.pdf21 Feb 2025
Deviation Report with respect to model copy of AgreementFile: No deviation decl.pdf21 Feb 2025
Declaration in FORM BFile: Format B.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_plot_1_sec_8A.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_plot_1_sec_8A.pdf20 Feb 2025
Proforma of Allotment letterFile: Allotment Letter Non PMAY.pdf6 Feb 2024
Proforma of Allotment letterFile: Allotment Letter PMAY.pdf6 Feb 2024
Proforma of Agreement for saleFile: Agreement of sale PMAY.pdf6 Feb 2024
Proforma of Agreement for saleFile: Agreement for sale Non PMAY.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Plot 01 Annex -A.pdf9 Mar 2023
Details of encumbrances concerned to FinanceFile: 01 KKW.pdf28 Feb 2023
Details of encumbrances concerned to LegalFile: 01 KKW.pdf28 Feb 2023
PAN CardFile: 1 PAN Card (1).pdf13 Feb 2023
Copy of the legal title reportFile: Land Possession Cert.pdf13 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC LETTER-2021-12-21.pdf13 Feb 2023
Declaration about Commencement CertificateFile: Form D.pdf13 Feb 2023
CERSAI detailsFile: CERSAI.pdf13 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SWAPNAPOORTI HOUSING SCHEMEPlot No-2 Sector-36 Kharghar Navi Mumbai3,590CompletedMay 2015Late, Jun 2016
VALLEY SHILP HOUSING SCHEMEPlot No-3 Sector 36 Kharghar Navi Mumbai1,224CompletedMay 2014Late, May 2015

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Plot No 1 Sec-8A, Kharkopar West on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Railway Station5,900+ in Raigarh

2 kmPlot No 1 Sec-8A, KharkoCompleted 10Lapsed / revoked 10Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED

CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED has 22 registrations on MahaRERA, including SECTOR 21 TALOJA and SECTOR 22, TALOJA. Its filings disclose 7 earlier MahaRERA projects: declares 0 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Plot No 1 Sec-8A, Kharkopar West is delayed beyond 1 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Plot No 1 Sec-8A, Kharkopar West?

The registered promoter entity is CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED, a company as per the filing. Its CIN U99999MH1970SGC014574 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Plot No 1 Sec-8A, Kharkopar West?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Plot No 1 Sec-8A, Kharkopar West?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Plot No 1 Sec-8A, Kharkopar West?

The professionals named in the filing: Architect: Hafeez Contractor; Engineer: CIDCO Ltd; Chartered Accountant: SM Bhatt. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Plot No 1 Sec-8A, Kharkopar West?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Plot No 1 Sec-8A, Kharkopar West. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Plot No 1 Sec-8A, Kharkopar West to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.