Home / Browse projects / Mumbai Suburban, Maharashtra / PLATINUM VISTA

Registration lapsed No litigation declared Residential / Group Housing project

PLATINUM VISTA

By PLATINUMCORP SKYTOWERS LLP

RG-MH-87603 · RERA P51800049496 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
0 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

PLATINUM VISTA is a Residential / Group Housing project by PLATINUMCORP SKYTOWERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049496 on 15 Feb 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 12 of the 12 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePLATINUM VISTA
  • TypeResidential / Group Housing
  • Location
    • S V ROAD
    • KHAR WEST
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • RERA no.P51800049496
  • ReraGenie IDRG-MH-87603

Builder

  • NamePLATINUMCORP SKYTOWERS LLP
  • Entity typeOthers
  • Designated PartnerPLATINUMCORP DREAM HOMES LLP Platinumcorp Dream Homes LLP
  • Designated PartnerPLATINUMCORP VASTU NIRMAN LLP Platinumcorp Vastu Nirman LLP
  • PartnerROHIT MOHAN PUGALIA Pugalia

Key dates

4 months past promisethis monthRegisteredFeb 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Feb 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Current status

100%12 of 12 units booked
83.6%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLATINUM VISTANA21012012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

PLATINUM VISTA: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises54%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks51%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.34%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area659 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on10 Jun 2025
LandownerVillageDistrict
EXCELL AUTOVISTA PRIVATE LIMITEDKhargharRaigarh

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI3558.0
Proposed, not sanctioned2,221 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG 1 WOODROSE SWAMI SAMARTH NAGAR LOHANDWALA COMPLEX ANDHERI WEST MUMBAI 400 053
Estimated costRs 29.48 cr
Cost incurredRs 24.66 cr
Work done83.64%
BuildingWingEstimatedIncurred
PLATINUM VISTANARs 29.48 crRs 24.66 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASPIRE ARCHITECT & CONSULTANTS
EngineerU D CHANDE LLP
EngineerDinesh J Mehta
Chartered AccountantCA PUNIT GUPTA
Chartered AccountantVirendra Agarwal & Associates
PartnerRole in project
PLATINUMCORP SKYTOWERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: RERA Form-5 Skytowers-FY 25-26-Final_Signed.pdf26 Jun 2026
Form 2A (FY 2025-2026)File: Form-2A Quality Assurance-PC Skytowers-31032026.pdf12 Jun 2026
Commencement certificateFile: 22 - Full CC 17 Apr 2026.pdf20 Apr 2026
Building plan approvalFile: 21 - Sona Villa Part occ issued copy 18-11-2025.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 PC Sky Mar 2026 (1).pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 PC Sky Mar 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 PC Sky Mar 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 PC Sky Dec 2025.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2 PC Sky Dec 2025.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 PC Sky Dec 2025.pdf16 Jan 2026
Withdrawal Update Form 1File: Form 1 PC Sky Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 PC Sky Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 PC Sky Sep 2025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: RERA Form-5 Skytowers-FY 24-25-Final.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1 PC Skytowers Mar 2025.pdf22 Jul 2025
Withdrawal Update Form 2File: Form 2 PC Sky June 2025.pdf22 Jul 2025
Withdrawal Update Form 3File: Form 3 PC Sky June 2025.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A skytowers.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers Mar 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers Mar 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers Mar 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure PC Skytowers Mar 2025.pdf18 Apr 2025
Building plan approvalFile: 1.pdf13 Mar 2025
Building plan approvalFile: 2 1.pdf13 Mar 2025
Building plan approvalFile: 2 2.pdf13 Mar 2025
Building plan approvalFile: 2 3.pdf13 Mar 2025
Building plan approvalFile: 2 4.pdf13 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Sonavilla Full CC 12032025.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 1.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 2.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 3.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 4.pdf13 Mar 2025
Declaration about Commencement CertificateFile: 2 Declaration of CC 12032025.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers Dec 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers Dec 2024.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure PC Skytowers Dec 2024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers Sept 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers Sept 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers Sept 2024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure PC Skytowers Sept 2024.pdf19 Oct 2024
Form 5 (FY 2023-2024)File: RERA Form-5 PC Skytowers LLP.pdf1 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers June 2024.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance PC Skytowers LLP Mar 2024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory PSkytowers June 2024.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Mar 2024.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skytower Mar 2024.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Platinum Vista Mar 2024.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 P Skytowers Mar 2024.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA certificate Mar 2024 Vista.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Platinum Vista Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Platinum Vista Dec 2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Vista Dec 2023.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Inventory Vista Dec 2023.pdf17 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC 14 Upper Floors 24112023.pdf29 Nov 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Form D 29112023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Platinum Vista Sept 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Platinum Vista Sept 2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Vista Sept 2023.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Disclosure Sona Villa Sept 2023.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers LLP 31032023.pdf8 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062023.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - RERA certificate - 31-03-2023.pdf5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062023.pdf5 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Vista.pdf5 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032023.pdf5 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062023.pdf5 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Platinumcorp Sky Towers LLP 31032023.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Platinum Vista 31032023.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Platinum Vista 30062023.pdf17 Jul 2023
Other - TechnicalFile: 10 CFO NOC Letter Dt 22032023.pdf4 Apr 2023
Other - TechnicalFile: 10 CFO Drawing Last Pg.pdf4 Apr 2023
CERSAI detailsFile: CERSAI Report New.pdf13 Feb 2023
Proforma of Agreement for saleFile: FINAL AOS - 13-02-2023.pdf13 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance to Finance.pdf10 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance to Finance.pdf10 Feb 2023
Layout approvalFile: Building Plan.pdf9 Feb 2023

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PLATINUM VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAR WEST6,700+ in Mumbai Suburban

Builder: PLATINUMCORP SKYTOWERS LLP

PLATINUMCORP SKYTOWERS LLP has 1 registration on MahaRERA, including PLATINUM VISTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that PLATINUM VISTA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PLATINUM VISTA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLATINUM VISTA?

The registered promoter entity is PLATINUMCORP SKYTOWERS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLATINUM VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PLATINUM VISTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PLATINUM VISTA?

The professionals named in the filing: Architect: ASPIRE ARCHITECT & CONSULTANTS; Engineer: U D CHANDE LLP; Engineer: Dinesh J Mehta; Chartered Accountant: CA PUNIT GUPTA; Chartered Accountant: Virendra Agarwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PLATINUM VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLATINUM VISTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLATINUM VISTA to a free account