PLATINUM VISTA
RG-MH-87603 · RERA P51800049496 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PLATINUM VISTA is a Residential / Group Housing project by PLATINUMCORP SKYTOWERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049496 on 15 Feb 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 12 of the 12 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NamePLATINUM VISTA
- TypeResidential / Group Housing
- Location
- S V ROAD
- KHAR WEST
- Bandra
- Andheri
- Mumbai Suburban
- 400052
- Pincode400052
- RERA no.P51800049496
- ReraGenie IDRG-MH-87603
Builder
- NamePLATINUMCORP SKYTOWERS LLP
- Entity typeOthers
- Designated PartnerPLATINUMCORP DREAM HOMES LLP Platinumcorp Dream Homes LLP
- Designated PartnerPLATINUMCORP VASTU NIRMAN LLP Platinumcorp Vastu Nirman LLP
- PartnerROHIT MOHAN PUGALIA Pugalia
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Feb 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 26 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PLATINUM VISTA | NA | 21 | 0 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
PLATINUM VISTA: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 54% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 51% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 34% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| EXCELL AUTOVISTA PRIVATE LIMITED | Kharghar | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PLATINUM VISTA | NA | Rs 29.48 cr | Rs 24.66 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASPIRE ARCHITECT & CONSULTANTS |
| Engineer | U D CHANDE LLP |
| Engineer | Dinesh J Mehta |
| Chartered Accountant | CA PUNIT GUPTA |
| Chartered Accountant | Virendra Agarwal & Associates |
| Partner | Role in project |
|---|---|
| PLATINUMCORP SKYTOWERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: RERA Form-5 Skytowers-FY 25-26-Final_Signed.pdf | 26 Jun 2026 |
| Form 2A (FY 2025-2026)File: Form-2A Quality Assurance-PC Skytowers-31032026.pdf | 12 Jun 2026 |
| Commencement certificateFile: 22 - Full CC 17 Apr 2026.pdf | 20 Apr 2026 |
| Building plan approvalFile: 21 - Sona Villa Part occ issued copy 18-11-2025.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 PC Sky Mar 2026 (1).pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 PC Sky Mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 PC Sky Mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 PC Sky Dec 2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 PC Sky Dec 2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 PC Sky Dec 2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 PC Sky Sep 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 PC Sky Sep 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 PC Sky Sep 2025.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: RERA Form-5 Skytowers-FY 24-25-Final.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 PC Skytowers Mar 2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 PC Sky June 2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 PC Sky June 2025.pdf | 22 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A skytowers.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers Mar 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers Mar 2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers Mar 2025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure PC Skytowers Mar 2025.pdf | 18 Apr 2025 |
| Building plan approvalFile: 1.pdf | 13 Mar 2025 |
| Building plan approvalFile: 2 1.pdf | 13 Mar 2025 |
| Building plan approvalFile: 2 2.pdf | 13 Mar 2025 |
| Building plan approvalFile: 2 3.pdf | 13 Mar 2025 |
| Building plan approvalFile: 2 4.pdf | 13 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Sonavilla Full CC 12032025.pdf | 13 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 13 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 1.pdf | 13 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 2.pdf | 13 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 3.pdf | 13 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 4.pdf | 13 Mar 2025 |
| Declaration about Commencement CertificateFile: 2 Declaration of CC 12032025.pdf | 13 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers Dec 2024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers Dec 2024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers Dec 2024.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure PC Skytowers Dec 2024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers Sept 2024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers Sept 2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers Sept 2024.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure PC Skytowers Sept 2024.pdf | 19 Oct 2024 |
| Form 5 (FY 2023-2024)File: RERA Form-5 PC Skytowers LLP.pdf | 1 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PC Skytowers June 2024.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers June 2024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PC Skytowers June 2024.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance PC Skytowers LLP Mar 2024.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory PSkytowers June 2024.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Mar 2024.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Skytower Mar 2024.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Platinum Vista Mar 2024.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 P Skytowers Mar 2024.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA certificate Mar 2024 Vista.pdf | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Platinum Vista Dec 2023.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Platinum Vista Dec 2023.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Vista Dec 2023.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory Vista Dec 2023.pdf | 17 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC 14 Upper Floors 24112023.pdf | 29 Nov 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Form D 29112023.pdf | 29 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Platinum Vista Sept 2023.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Platinum Vista Sept 2023.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Vista Sept 2023.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Sona Villa Sept 2023.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PC Skytowers LLP 31032023.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062023.pdf | 8 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - RERA certificate - 31-03-2023.pdf | 5 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062023.pdf | 5 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Vista.pdf | 5 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032023.pdf | 5 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062023.pdf | 5 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Platinumcorp Sky Towers LLP 31032023.pdf | 5 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Platinum Vista 31032023.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Platinum Vista 30062023.pdf | 17 Jul 2023 |
| Other - TechnicalFile: 10 CFO NOC Letter Dt 22032023.pdf | 4 Apr 2023 |
| Other - TechnicalFile: 10 CFO Drawing Last Pg.pdf | 4 Apr 2023 |
| CERSAI detailsFile: CERSAI Report New.pdf | 13 Feb 2023 |
| Proforma of Agreement for saleFile: FINAL AOS - 13-02-2023.pdf | 13 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance to Finance.pdf | 10 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance to Finance.pdf | 10 Feb 2023 |
| Layout approvalFile: Building Plan.pdf | 9 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PLATINUM VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHAR WEST6,700+ in Mumbai Suburban
Rustomjee Crescent
KEYVIHAR REALTORS PRIVATE LIMITED
Nebula Empress
M/s Shiv Sai developer
Joy Legend Wing B
Bhavin Jayant Soni
PLATINUM OCEANIC
PLATINUMCORP LIFESCAPES LLP
Venue 52
Wadhwa Dreamscapes Private limited
LA52
Galani Ajwani Developers LLP
See every Mumbai Suburban project, with the district possession charts
Builder: PLATINUMCORP SKYTOWERS LLP
PLATINUMCORP SKYTOWERS LLP has 1 registration on MahaRERA, including PLATINUM VISTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that PLATINUM VISTA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PLATINUM VISTA is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PLATINUM VISTA?
The registered promoter entity is PLATINUMCORP SKYTOWERS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PLATINUM VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PLATINUM VISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PLATINUM VISTA?
The professionals named in the filing: Architect: ASPIRE ARCHITECT & CONSULTANTS; Engineer: U D CHANDE LLP; Engineer: Dinesh J Mehta; Chartered Accountant: CA PUNIT GUPTA; Chartered Accountant: Virendra Agarwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PLATINUM VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback