Home / Browse projects / Mumbai Suburban, Maharashtra / PLATINUM PARK

Completed No litigation declared Residential / Group Housing project

PLATINUM PARK

By shreeji Developers

RG-MH-72186 · RERA P51800008722 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • 17 complaints at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Installation of Lifts, 73%
17Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

PLATINUM PARK is a Residential / Group Housing project by shreeji Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008722 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 42 months from the original filing. 17 complaints are on record with the regulator.

At a glance

Project

  • NamePLATINUM PARK
  • TypeResidential / Group Housing
  • Location
    • LALLUBHAI PARK
    • ANDHERI
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008722
  • ReraGenie IDRG-MH-72186

Builder

  • Nameshreeji Developers
  • Entity typePartnership
  • PartnersUMESH PRAVINCHANDRA BHATT, NIRU UMESH BHATT
  • Other registrations26 more →
  • Completed11 of 27
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed153 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
USHAKIRAN CHS LTDNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 73%.

USHAKIRAN CHS LTD: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.52%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.73%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes30%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes40%

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Closed/Covered93
Open Space34

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,525 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI6817.49
Proposed, not sanctioned6,817 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOKHANDWALA BRANCH ANDHERI WEST

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
shreeji Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010563Jun 2021 → Dec 2023

Reason as filed by the promoterDue to the countrywide lockdown imposed by the government in March 2020, to prevent the spread of covid 19; the pandemic, all the commercial activities were at standstill for more than a year. As the project was delayed earlier due to BMC clearance, ( there was an ambiguity for passing the proposal due to delay in final approval of DP plan of 2034.) we have suffered a lot mentally and financially. Though now the BMC clearances are in place, arranging for fresh funds is again getting delayed due to the weekend lockdowns in April and subsequent second partial lockdown in Maharashtra from April 1

EXT51800024176Jun 2021 → Dec 2024

Reason as filed by the promoterThis is with reference to our project namely “Platinum Park” having project registration number P51800008722. The Project was scheduled to be completed on 30th June 2024 and the same is also reflected as project completion date on MahaRERA website. However, the completion of the said Project is delayed for following Reasons: 1. Due to delay in getting TDR in the Open market, which led to delay in loading the same onto our Project. 2. Because of the delay in loading TDR, the corresponding permissions & approvals got delayed, further putting pressure on timely completion of the Project. 3. There

Complaints filed with MahaRERA17

Case no.ComplainantRespondentFiled
CC006000000054857MR. NIKUNJ S. DESAIM/S. SHREEJI DEVELOPERS11/06/2018
CC006000000054891MR. PARAG MANGALDAS KHATRIM/S SHREEJI DEVELOPERS14/06/2018
CC006000000054899MR. PARAG MANGALDAS KHATRIM/S. SHREEJI DEVELOPERS14/06/2018
CC006000000089574MILIND C. YEDERI & HEMLATA M. YEDERISHREEJI DEVELOPERS03/06/2019
CC006000000195375Dhiren P ShahShreeji Developers04/01/2021
CC006000000196270Samir H ShahShreeji Developers05/03/2021
CC006000000195281Rajiv V. Shah & Sanjiv V. ShahM/s Shreeji Developers19/12/2020
CC006000000374924Rajendra JainShreeji Developers31/03/2023
CC006000000396743Shreeji DevelopersParag Khatri and Varsha Khatri20/07/2023
CC006000000396744Shreeji DevelopersParag Khatri and Manesh Khatri20/07/2023
CC006000000396745Shreeji DevelopersNikunj S Desai and Binisha Naik20/07/2023
CC006000000408340RIddhi H TurakhiaSHREEJI DEVELOPERS04/12/2023
CC006000000408341MIHIR TURAKHIASHREEJI DEVELOPERS04/12/2023
CC006000000408347CHAITANYA TURAKHIASHREEJI DEVELOPERS04/12/2023
CC006000000408348DHARMESH TURAKHIASHREEJI DEVELOPERS04/12/2023
CC006000000408349JAY H TURAKHIASHREEJI DEVELOPERS04/12/2023
CC006000000408344AVANI S SHAHSHREEJI DEVELOPERS04/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2025

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 24012025.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 12 Full OC 22012025.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 Mar 2023.pdf28 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 June 2023.pdf28 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 Sept 2023.pdf28 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 Dec 2023.pdf28 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 Mar 2024.pdf28 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 Dec 2022.pdf28 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 Mar 2023.pdf28 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Form 2 June 2023.pdf28 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Form 2 Sept 2023.pdf28 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2 Dec 2023.pdf28 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Form 2 Mar 2024.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 0 Form 2A Mar 2022.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Form 2A Mar 2023.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5 Form 2A Mar 2024.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: 1 DISCLOSER Dec 2022.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: 2 DISCLOSER Mar 2023.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: 3 DISCLOSER June 2023.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: 4 DISCLOSER Sept 2023.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: 5 DISCLOSER Dec 2023.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: 6 DISCLOSER Mar 2024.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: Shreeji Disclosure of Inventory 14062024.pdf28 Jun 2024
Certificates of CA (Form 3)File: 1 Form 3 Dec 2022.pdf28 Jun 2024
Certificates of CA (Form 3)File: 2 Form 3 Mar 2023.pdf28 Jun 2024
Certificates of CA (Form 3)File: 3 Form 3 June 2023.pdf28 Jun 2024
Certificates of CA (Form 3)File: 4 Form 3 Sept 2023.pdf28 Jun 2024
Certificates of CA (Form 3)File: 5 Form 3 Dec 2023.pdf28 Jun 2024
Certificates of CA (Form 3)File: 6 Form 3 Mar 2024.pdf28 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Mar 2023.pdf28 Jun 2024
Declaration about Commencement CertificateFile: Shreeji Disclosure of Inventory 14062024.pdf18 Jun 2024
Disclosure of sold/ booked inventoryFile: Shreeji Disclosure of Inventory 14062024.pdf18 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 11 Further CC Upto 13th Floor 04122023.pdf5 Dec 2023
Declaration about Commencement CertificateFile: Declaration about CC 04122023.pdf5 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC Upto Top of 12th Floor 31052023.pdf31 May 2023
Declaration about Commencement CertificateFile: Declaration about CC 31052023 upto 12floors.pdf31 May 2023
Building plan approvalFile: 01 IOD Full Potential 13 Floors.pdf4 May 2023
Building plan approvalFile: 02 IOD Full Potential 13 Floors.pdf4 May 2023
Building plan approvalFile: 03 IOD Full Potential 13 Floors.pdf4 May 2023
Building plan approvalFile: 04 IOD Full Potential 13 Floors.pdf4 May 2023
Building plan approvalFile: 05 IOD Full Potential 13 Floors.pdf4 May 2023
Building plan approvalFile: 06 IOD Full Potential 13 Floors.pdf4 May 2023
Building plan approvalFile: 07 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 01 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 02 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 03 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 04 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 05 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 06 IOD Full Potential 13 Floors.pdf4 May 2023
Building Plan Approval (IOD)File: 07 IOD Full Potential 13 Floors.pdf4 May 2023
OtherFile: RETIERMENT DEED_compressed.pdf18 Apr 2023
Other - TechnicalFile: CFO NOC 27072022.pdf5 Apr 2023
Other - TechnicalFile: UK Concession - 10012023.pdf5 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Organisation Details Dec 2022.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SD-FORM-2A-QUALITY CERT-31-03-2022.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: No Seperate Bank Account.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 17062022.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 15092022.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 18122022.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE 30062022.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE 31032022.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE 30092022.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5-CA CERTIFICATE-31-03-2022.pdf16 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC upto Top of 10th Flr 28092022.pdf28 Sep 2022
Copy of the legal title reportFile: Title Report.pdf14 Sep 2022
Building plan approvalFile: UK Amended IOD 07092022.pdf8 Sep 2022
Building plan approvalFile: IOD DRAWING - 08-09-2022.pdf8 Sep 2022
Building Plan Approval (IOD)File: UK Amended IOD 07092022.pdf8 Sep 2022
Building Plan Approval (IOD)File: IOD DRAWING - 08-09-2022.pdf8 Sep 2022
OtherFile: Platinum Shreeji Usha Kiran TPDMA 1.pdf29 Aug 2022
OtherFile: Platinum Shreeji Usha Kiran TPDMA 2.pdf29 Aug 2022
Building plan approvalFile: 1 Amended IOD approval letter dt 21012022.pdf24 Jun 2022
Building plan approvalFile: 2 Drawing.pdf24 Jun 2022
Building plan approvalFile: 3 Drawing2.pdf24 Jun 2022
Building Plan Approval (IOD)File: 1 Amended IOD approval letter dt 21012022.pdf24 Jun 2022
Building Plan Approval (IOD)File: 2 Drawing.pdf24 Jun 2022
Building Plan Approval (IOD)File: 3 Drawing2.pdf24 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 4 2315970 FurtherCC signed 23032022.pdf5 May 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf5 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SD-FORM-1-ARCHITECT CERT-MARCH-22.pdf5 May 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PLATINUM PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI6,700+ in Mumbai Suburban

2 kmPLATINUM PARKCompleted 92Lapsed / revoked 59Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 271 registered projects within 2 km.

Builder: shreeji Developers

SHREEJI DEVELOPERS has 27 registrations on MahaRERA, including SAHAJANAND INTEGRITY and SHREEJI DREAMS. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PLATINUM PARK is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLATINUM PARK?

The registered promoter entity is shreeji Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLATINUM PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PLATINUM PARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PLATINUM PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in PLATINUM PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLATINUM PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLATINUM PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.