Home / Browse projects / Nagpur, Maharashtra / Planwise Sapphire

Registered No litigation declared Residential / Group Housing project

Planwise Sapphire

By Planwise Structures And Spaces Private LImited

RG-MH-18846 · RERA P50500077663 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 80%
10 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Planwise Sapphire is a Residential / Group Housing project by Planwise Structures And Spaces Private LImited in Nagpur, Maharashtra, registered with MahaRERA as P50500077663 on 21 Oct 2024. Possession is promised by 30 Apr 2027. 6 of the 16 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NamePlanwise Sapphire
  • TypeResidential / Group Housing
  • Location
    • C.S. No.37
    • Kh. No.97
    • F.P. No.32
    • Mouza-Bhamti
    • Swawalambi nagar
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440022
  • Pincode440022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500077663
  • ReraGenie IDRG-MH-18846

Builder

  • NamePlanwise Structures And Spaces Private LImited
  • Entity typeCompany
  • DirectorAnushree Shrikant Mukte
  • Managing DirectorShrikant Mukte

Key dates

this monthRegisteredOct 2024PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

38%6 of 16 units booked
53.9%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Planwise SapphireNA4416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.

Planwise Sapphire: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Open Space16

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area683 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
Declared on23 Jun 2025
LandownerVillageDistrict
VIRENDRA KUMAR SONINagpur (M Corp.)Nagpur
SHAHAJI VINAYAK PAWARNagpur (M Corp.)Nagpur
Vidya Singh PawarNagpur (M Corp.)Nagpur
Rajesh Singh PawarNagpur (M Corp.)Nagpur
Savita PhadkeNagpur (M Corp.)Nagpur
Ashish TiwariNagpur (M Corp.)Nagpur
Priya SondhiNagpur (M Corp.)Nagpur
Jeevanasha MachhariyalNagpur (M Corp.)Nagpur
BHALLAMUDI VENKATA RAMANA MURTYNagpur (M Corp.)Nagpur
PRASAD GAJANAN VAISHAMPAYANNagpur (M Corp.)Nagpur
Tanaji DeshmukhNagpur (M Corp.)Nagpur
Anaya DamleNagpur (M Corp.)Nagpur
Kalpana JoshiNagpur (M Corp.)Nagpur
Manish KokneNagpur (M Corp.)Nagpur
Monali GhateNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI1716.0
Proposed, not sanctioned1,716 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCivil lines
Estimated costRs 13.00 cr
Cost incurredRs 7.00 cr
Work done53.86%
BuildingWingEstimatedIncurred
Planwise SapphireNARs 12.64 crRs 7.00 cr
-NARs 35.46 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRD Architects & Consultants AR Rahul Deshpande
ArchitectR.D.ARCHITECTS & CONSULTANTS
EngineerSoham Consortium
EngineerAhmad kashif Iqbal
Chartered AccountantA A S C & Associates
Chartered AccountantMJM Associates
Chartered AccountantPriyanka Parse
PartnerRole in project
Planwise Structures And Spaces Private LImited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: plan wise form 1.pdf7 Aug 2026
Withdrawal Update Form 1File: plan wise form 1.pdf7 Aug 2026
Withdrawal Update Form 2File: planwise form 2.pdf7 Aug 2026
Withdrawal Update Form 2File: planwise form 2.pdf7 Aug 2026
Withdrawal Update Form 3File: Form 3 Planwise Sapphire AprJun 2026.pdf7 Aug 2026
Withdrawal Update Form 3File: Form 3_.pdf7 Aug 2026
Form 2A (FY 2025-2026)File: Plan wise Form 2 A 2025-26.pdf30 Jul 2026
Withdrawal Update Form 1File: plan wise form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: plan wise form 2 11.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 Planwise Sapphire AprJun 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Plan wise SAPPHIRE Form 1 Oct - Dec 2025.pdf11 Apr 2026
Withdrawal Update Form 1File: Form 1 Jan to Mar 2026 planwise.pdf11 Apr 2026
Withdrawal Update Form 2File: Form 2 Oct to Dec 2026 planwise.pdf11 Apr 2026
Withdrawal Update Form 2File: Form 2 Jan to Mar 2026 planwise.pdf11 Apr 2026
Withdrawal Update Form 3File: Form 3 - Q3 FY 25-26 (Planwise Sapphire).pdf11 Apr 2026
Withdrawal Update Form 3File: Form 3 - Q4 FY 25-26 (Planwise Sapphire).pdf11 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2 A 2024- 25 plan wise.pdf4 Feb 2026
Form 5 (FY 2024-2025)File: form -5 of planwise signed.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 Apr to Jun 2025 plan wise signed.pdf19 Nov 2025
Withdrawal Update Form 1File: Form 1 July to Sept 2025 (1) plan wise signed.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 Apr to Jun 2025 plan wise signed.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 Jul to Sep 2025 plan wise signed.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 Updated July to Sept 25 signed PLANWISE_compressed.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 Updated July to Sept 25 signed PLANWISE_compressed.pdf19 Nov 2025
Withdrawal Update Form 1File: form 1_new.pdf25 Jun 2025
Withdrawal Update Form 2File: form 2.pdf25 Jun 2025
Withdrawal Update Form 3File: Form 3 Plan Signed_Compressed.pdf25 Jun 2025
Form 1File: Form 1_(31-12-24)_signed.pdf18 Jun 2025
Form 2File: Form 2_(31-12-24)_signed.pdf18 Jun 2025
Form 3File: Form 3 _(31-12-24)_signed.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: DSBI_(31-12-24)_signed.pdf18 Jun 2025
Form 1File: form 1(2).pdf18 Jun 2025
Form 2File: form 2.pdf18 Jun 2025
Form 3File: Form 3 Plan Signed_Compressed.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: disclosure.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Plan Signed_Compressed.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan - Mar 25_Compressed.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: DSBI_(31-12-24)_signed.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_(31-12-24)_signed.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _(31-12-24)_signed.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_(31-12-24)_signed.pdf22 Feb 2025
Other - LegalFile: Revised commencement certificate.pdf12 Aug 2024
CERSAI detailsFile: Dec for no sec interest.pdf12 Aug 2024
Details of encumbrances concerned to FinanceFile: Financial encumbrance.pdf8 Aug 2024
Details of encumbrances concerned to FinanceFile: Non-Encumberance.pdf8 Aug 2024
Details of encumbrances concerned to LegalFile: Financial encumbrance.pdf8 Aug 2024
Details of encumbrances concerned to LegalFile: Non-Encumberance.pdf8 Aug 2024
Other - LegalFile: LEASE DEEDS NIRMAL New 2 Nos-16-30_compressed.pdf27 Jun 2024
Other - LegalFile: LEASE DEEDS NIRMAL New 2 Nos-1-15_compressed.pdf27 Jun 2024
Other - LegalFile: LEASE DEEDS NIRMAL New 2 Nos-31-45_compressed.pdf27 Jun 2024
Other - LegalFile: LEASE DEEDS NIRMAL New 2 Nos-46-60_compressed.pdf27 Jun 2024
Other - LegalFile: LEASE DEEDS NIRMAL New 2 Nos-61-71_compressed.pdf27 Jun 2024
CERSAI detailsFile: Dec for no charges.pdf27 Jun 2024
Building plan approvalFile: Sanction_Plan compressed.pdf12 Jun 2024
Layout approvalFile: Sanction_Plan compressed.pdf12 Jun 2024
Copy of Layout Approval (in case of layout)File: Sanction_Plan compressed.pdf12 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf12 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Explanation for CA certificate.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction_Plan compressed.pdf12 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf3 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Dec about separate account.pdf22 May 2024
Other - TechnicalFile: Annexure A - Signed.pdf22 May 2024
Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf20 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Reports AFS.pdf20 May 2024
CERSAI detailsFile: Cersai.pdf18 May 2024
Proforma of Agreement for saleFile: Agreement to sale (2).pdf18 May 2024
PAN CardFile: COMPANY PAN.pdf17 May 2024
Copy of the legal title reportFile: Search Report.pdf17 May 2024
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf17 May 2024
Declaration in FORM BFile: Form B promoter.pdf17 May 2024
Declaration in FORM BFile: Form B.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf17 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement cert.pdf17 May 2024
Declaration about Commencement CertificateFile: Declaration About Commencement.pdf17 May 2024

How this compares with Nagpur

38%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Planwise Sapphire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Swawalambi nagar2,800+ in Nagpur

2 kmPlanwise SapphireCompleted 13Lapsed / revoked 7Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Planwise Structures And Spaces Private LImited

Planwise Structures And Spaces Private LImited has 1 registration on MahaRERA, including Planwise Sapphire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Planwise Sapphire is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Planwise Sapphire?

The registered promoter entity is Planwise Structures And Spaces Private LImited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Planwise Sapphire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Planwise Sapphire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Planwise Sapphire?

The professionals named in the filing: Architect: RD Architects & Consultants AR Rahul Deshpande; Architect: R.D.ARCHITECTS & CONSULTANTS; Engineer: Soham Consortium; Engineer: Ahmad kashif Iqbal; Chartered Accountant: A A S C & Associates; Chartered Accountant: MJM Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Planwise Sapphire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Planwise Sapphire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Planwise Sapphire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.