Home / Browse projects / Raigarh, Maharashtra / PLANET 6

Registered No litigation declared Residential / Group Housing project

PLANET 6

By CONSTRUXUS INFRA LLP

RG-MH-29757 · RERA P52000028999 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
23 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 70%
46 of 401Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

PLANET 6 is a Residential / Group Housing project by CONSTRUXUS INFRA LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000028999 on 23 Apr 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 355 of the 401 units on this registration are recorded sold or booked, and 23 of 66 construction stages are filed complete.

At a glance

Project

  • NamePLANET 6
  • TypeResidential / Group Housing
  • Location
    • PLOT NO. K-1 (147) + K-2 (146)
    • SECTOR 3
    • PUSHPAK NAGAR
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000028999
  • ReraGenie IDRG-MH-29757

Builder

  • NameCONSTRUXUS INFRA LLP
  • Entity typePartnership
  • PartnersGANESH BECHAR PATEL, GOVIND KARMAN GAJORA, HIRABEN KARSAN VARCHAND, DURGARAM BHANAJI CHOUDHARY, SAGAR HARISHCHANDRA DOKE, ASHOKKUMAR GULABCHAND JAIN

Key dates

this monthRegisteredApr 2021First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2021
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings6 building records
  • Documents filed63 files

Current status

89%355 of 401 units booked
55.7%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA12966066
B WINGNA111162062
C WINGNA151199099
D WINGNA111155055
E WINGNA119322254
F WINGNA119353065

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 70%.

A WING56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)60%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
B WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
C WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
D WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
E WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%
F WING65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks63%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed401

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots401
Closed/Covered385
Open Space16

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,558 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation Of Maharashtra Ltd
Permissible FSI17115.6
Proposed, not sanctioned17,116 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 27 TO 30, GROW MORE TOWER, SECTOR 2, KHARGHAR, 410210
Estimated costRs 1,150.00 cr
Cost incurredRs 640.68 cr
Work done55.71%
BuildingWingEstimatedIncurred
A WINGNARs 190.00 crRs 106.78 cr
B WINGNARs 190.00 crRs 106.78 cr
C WINGNARs 190.00 crRs 106.78 cr
D WINGNARs 190.00 crRs 106.78 cr
E WINGNARs 190.00 crRs 106.78 cr
F WINGNARs 190.00 crRs 106.78 cr
-NARs 10.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerB S Sukthankar & Associates
EngineerImpact Designer
Chartered AccountantDhara Gada
Chartered AccountantPRITESH THAKARSHI GADA
PartnerRole in project
CONSTRUXUS INFRA LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16072621772Dec 2026 → Dec 2027

Reason as filed by the promoterWe, Construxus Infra LLP, the promoter of the project Planet 6 (Registration No. P52000028999) registered under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We sincerely regret the delay in completing the project. The delay was caused by several unavoidable circumstances beyond our reasonable control, which significantly affected the progress of construction. The reasons are explained below: Financial Constraints Lower-than-expected customer response resulted in delayed fund inflows, affecting working capital availability and slowing down cons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: form 2.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jul 2026
Form 1File: form 1.pdf1 Jun 2026
Form 2File: form 2.pdf1 Jun 2026
Form 3File: form 3.pdf1 Jun 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf1 Jun 2026
Form 2A (FY 2025-2026)File: form 2a.pdf28 May 2026
Form 1File: Form 1.pdf17 Jan 2026
Form 2File: From 2.pdf17 Jan 2026
Form 3File: Form 3.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf17 Jan 2026
Form 1File: From 1.pdf17 Jan 2026
Form 2File: Form 2.pdf17 Jan 2026
Form 3File: Form 3.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 25.pdf24 Oct 2025
Form 1File: Form 1_compressed.pdf22 Jul 2025
Form 2File: RERA FORM 2.pdf22 Jul 2025
Form 3File: FORM 3.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf22 Jul 2025
Form 1File: Form 1..pdf22 Jul 2025
Form 2File: FORM 2.pdf22 Jul 2025
Form 3File: FORM 3.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf22 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ASHWIN PATEL.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DURGARAM.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: GOVIND GAJORA.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: HIRA VARCHAND.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SAGAR DOKE.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: GANESH PATEL.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Ashok Jain_compressed.pdf10 Mar 2025
Declaration about Commencement CertificateFile: C C DECLARATION.pdf8 Mar 2025
CERSAI detailsFile: CERSAI REPORT.pdf8 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMATE A.pdf8 Mar 2025
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER.pdf8 Mar 2025
Deviation Report with respect to model copy of AgreementFile: AGREEMENT.pdf8 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: RATAN SIR.pdf8 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2022.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2023.pdf6 Mar 2025
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Final.pdf22 Feb 2025
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE.pdf22 Feb 2025
Proforma of Agreement for saleFile: Agreement Draft Construxus Infra LLP.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_compressed.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Stamp.pdf17 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Cons form 5.pdf2 Feb 2023
Copy of the legal title reportFile: SEARCH AND TITEL REPORT AS PER RERA_compressed.pdf16 Apr 2021
Layout approvalFile: CC DRG 1.pdf9 Apr 2021
Building plan approvalFile: CC DRG 2.pdf9 Apr 2021
PAN CardFile: Construxus Infra Pan Card.pdf9 Apr 2021
Details of encumbrancesFile: NON ENCUMBRANCE.pdf9 Apr 2021
Copy of Layout Approval (in case of layout)File: CC DRG 1.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: CC DRG 2.pdf9 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: C C Copy K-1, K-2.pdf9 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi.pdf9 Apr 2021
Proforma of Allotment letterFile: Agreement Draft Construxus Infra LLP.pdf9 Apr 2021
Declaration in FORM BFile: Form B.pdf7 Apr 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER_RERA_Construxus.pdf7 Apr 2021

How this compares with Raigarh

89%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PLANET 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR 3, PUSHPAK NAGAR5,900+ in Raigarh

2 kmPLANET 6Completed 8Lapsed / revoked 8Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 121 registered projects within 2 km.

Builder: CONSTRUXUS INFRA LLP

CONSTRUXUS INFRA LLP has 1 registration on MahaRERA, including PLANET 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PLANET 6 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLANET 6?

The registered promoter entity is CONSTRUXUS INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLANET 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PLANET 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PLANET 6?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: B S Sukthankar & Associates; Engineer: Impact Designer; Chartered Accountant: Dhara Gada; Chartered Accountant: PRITESH THAKARSHI GADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PLANET 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLANET 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLANET 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.