Home / Browse projects / Nagpur, Maharashtra / PIONEER TAMARIND COURT- PLOT NO.3
PIONEER TAMARIND COURT- PLOT NO.3
By Tarangan Infraventures Private Limited
RG-MH-00520 · RERA P50500000429 · Last updated on MahaRERA portal: 20 Oct 2021
Source: official MahaRERA filing
Red flags
- Completion date moved by 10 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PIONEER TAMARIND COURT- PLOT NO.3 is a Residential / Group Housing project by Tarangan Infraventures Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500000429 on 17 Jul 2017. The registration is recorded completed; possession was promised by 30 Oct 2020. The completion date has moved by 10 months from the original filing.
At a glance
Project
- NamePIONEER TAMARIND COURT- PLOT NO.3
- TypeResidential / Group Housing
- Location
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440005
- Pincode440005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500000429
- ReraGenie IDRG-MH-00520
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Jul 2017
- Promised completion30 Oct 2020
- Revised completionRevised to 30 Oct 2020 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PIONEER TAMARIND COURT- PLOT NUMBER 3 | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
PIONEER TAMARIND COURT- PLOT NUMBER 3: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed111
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | EMANATE DESIGN |
| Engineer | P S PATANKAR |
| Partner | Role in project |
|---|---|
| Tarangan Infraventures Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project is 100% completed and the promoter is planning to apply for Completion certificate by the 10th of Jan 2020 (i.e. is within 10 days of application for extension as after the receipt of revise sanction plan before 10th of Jan 2020, hence requesting you to grant us an extension of 1 month i.e. is up to 31st Jan 2020 as per the provision of the Act
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Feb 2021
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-1.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-2.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-3.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-4.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-5.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-6.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-7.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-8.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-9.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-10.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-11.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-12.pdf | 20 Oct 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PTC DOD Part-13.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-1.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-2.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-3.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-4.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-5.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-6.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-7.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-8.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-9.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-10.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-11.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-12.pdf | 20 Oct 2021 |
| Status of ConveyanceFile: PTC DOD Part-13.pdf | 20 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2A JUNE 2021_compressed.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A MARCH 2020_compressed.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A MARCH 2021_compressed.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JUNE 2021_compressed.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot no3_Dec19.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot no3Sep20.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3_Plot no3_Sep19.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3_Plot no3_March21.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot nO3June21.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot n3June20.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot n3June20.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form3Plot3Dec20.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot n3Dec18.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form3Plot noDec19.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Pioneer Tamarind Court-Form-3Plot no3March20.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: PTC-Plot no-3_Form-5_March19.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: PTC -Plot no-3_FORM-5_MARCH20.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PTC-Plot no-3_FORM-5_MARCH21.pdf | 15 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TAMARIND COURT.pdf | 14 Aug 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Tamarind Court Rera (form4).pdf | 16 Jun 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: TAMARIND_COURT-_NOC.pdf | 27 Feb 2021 |
| Certificates of CA (Form 5)File: PLot NO 3.pdf | 29 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERT.pdf | 13 Mar 2018 |
| Certificates of CA (Form 3)File: CA CERT.pdf | 13 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Certificate.pdf | 13 Jul 2017 |
| Layout approvalFile: Layout Map.pdf | 10 Jul 2017 |
| Building plan approvalFile: BUILDING PLAN PLOT NO 3.pdf | 10 Jul 2017 |
| PAN CardFile: PAN_Card_of_Tarangan_Infraventures.pdf | 10 Jul 2017 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 10 Jul 2017 |
| Details of encumbrancesFile: ENCUMB CERTIFICATE.pdf | 10 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Map.pdf | 10 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING PLAN PLOT NO 3.pdf | 10 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMIT PLOT NO 3.pdf | 10 Jul 2017 |
| Declaration in FORM BFile: FORM B.pdf | 10 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 10 Jul 2017 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 10 Jul 2017 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 10 Jul 2017 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PIONEER SOLITAIRE | PLOT NO 4 MADHAV NAGAR NAGPUR | 12 | Completed | Jul 2015 | Late, Sep 2015 |
| PIONEER WOODS II | 199 2 WANADONGRI HINGNA ROAD NAGPUR | 167 | Completed | Mar 2015 | Late, Aug 2015 |
| PIONEER DAFFODILS | KH NO 119-121 PART JAITALA NAGPUR | 79 | Completed | Jul 2014 | Late, Aug 2014 |
| PIONEER WOODS | 198 3 WANADONGRI HIGNA ROAD NAGPUR | 108 | Completed | Jul 2014 | Apr 2014 |
| PIONEER WOODS | 198 PART WANADONGRI HINGNA ROAD NAGPUR 441110 | 108 | Completed | Jul 2014 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
Keep PIONEER TAMARIND COURT- PLOT NO.3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nagpur (M Corp.)2,800+ in Nagpur
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
One Rise
MAHALAXMI INFRAPROJECTS PRIVATE LIMITED
Construction of 288 EWS & 36 LIG Flats at Belt
MHADA(Nagpur Board)
FORTUNE SIRI
Radiance Erectors Pvt. Ltd
Harmony Spaces
VAS ASSOCIATES AND BUILDERS
Rachana Sahira Wing A
Rachana construction Co. (Nagpur) Pvt. Ltd
SHIVTHIRTH NAGAR 3
ASHISH KALODE & OTHERS
See every Nagpur project, with the district possession charts
Builder: Tarangan Infraventures Private Limited
Tarangan Infraventures Private Limited has 3 registrations on MahaRERA, including PIONEER TULIP and PIONEER TAMARIND COURT- PLOT NO.3. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if PIONEER TAMARIND COURT- PLOT NO.3 is delayed beyond 30 Oct 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PIONEER TAMARIND COURT- PLOT NO.3?
The registered promoter entity is Tarangan Infraventures Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PIONEER TAMARIND COURT- PLOT NO.3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PIONEER TAMARIND COURT- PLOT NO.3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PIONEER TAMARIND COURT- PLOT NO.3?
The professionals named in the filing: Architect: EMANATE DESIGN; Engineer: P S PATANKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PIONEER TAMARIND COURT- PLOT NO.3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback