Completed No litigation declared Others project

PINNACLE

By KAILAS PRABHAKAR BANKHELE

RG-MH-41321 · RERA P52000048599 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
16 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

PINNACLE is a Others project by KAILAS PRABHAKAR BANKHELE in Raigarh, Maharashtra, registered with MahaRERA as P52000048599 on 10 Jan 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 3 months from the original filing. 16 of the 32 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NamePINNACLE
  • TypeOthers
  • Location
    • SECTOR 24
    • WAHAL
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000048599
  • ReraGenie IDRG-MH-41321

Builder

  • NameKAILAS PRABHAKAR BANKHELE
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jan 2023
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed81 files

Current status

50%16 of 32 units booked
94.1%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PINNACLENA8828432

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

PINNACLE: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area370 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Sep 2024
LandownerVillageDistrict
KALYANI SHARAD JADHAVBHAYANDARThane

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI1076.83
Proposed, not sanctioned1,075 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCBD BELAPUR NAVI MUMBAI
Estimated costRs 2.67 cr
Cost incurredRs 2.51 cr
Work done94.09%
BuildingWingEstimatedIncurred
PINNACLENARs 2.43 crRs 2.33 cr
-NARs 24.26 lakhRs 18.20 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEETAL ARCHITECTS
EngineerAGHARKAR CONSULTANTS
Chartered AccountantCA DEVYANI SHEJWAL
Chartered AccountantD P SHEJWAL AND ASSOCIATES
Chartered AccountantMANISH K RAMAWATI AND COMPANY
Chartered AccountantM.S Singh Ranjan & Co
PartnerRole in project
KAILAS PRABHAKAR BANKHELE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06012619323Dec 2025 → Mar 2026

Reason as filed by the promoter1) Delay in Redceiving Occupancy Certificate From CIDCO

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: prime oc mail SS.pdf16 Jul 2026
Occupational CertificateFile: OC.pdf1 May 2026
Occupational CertificateFile: OC PLAN.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 Prime.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 Prime.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 Prime.pdf21 Apr 2026
Layout approvalFile: Plan.pdf21 Feb 2026
Building plan approvalFile: Plan.pdf21 Feb 2026
Withdrawal Update Form 1File: Form 1 - converted.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf21 Feb 2026
Withdrawal Update Form 3File: FORM 3 Prime Dev 31-12-25.pdf21 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A 2022-23.pdf7 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf7 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf7 Jan 2026
Form 5 (FY 2023-2024)File: FORM 5 Prime Developers 23-24.pdf7 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 Prime Dev 24-25.pdf7 Jan 2026
Withdrawal Update Form 1File: Form 1 30-09-25.pdf3 Dec 2025
Withdrawal Update Form 2File: Form 2 30-09-25.pdf3 Dec 2025
Withdrawal Update Form 3File: FORM 3 Prime Dev 30-09-2025.pdf3 Dec 2025
Withdrawal Update Form 1File: Form 1 30-06-25.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2 30-06-25.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3 30-06-25 Prime Dev -.pdf30 Sep 2025
Form 1File: Form 1.pdf7 Jun 2025
Form 2File: Form 2.pdf7 Jun 2025
Form 3File: prime developer form 3 31-3-25 - new.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: prime developer kailas (sold Unsold).pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declration for QPR.pdf7 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed - converted.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Jan 2025
Layout approvalFile: PLAN.pdf7 Dec 2024
Building plan approvalFile: PLAN.pdf7 Dec 2024
Copy of Layout Approval (in case of layout)File: PLAN.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRIME 30-9-2024 SIGNED - converted.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: COMM CERT.pdf7 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Prime Developers.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Signed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Signed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGN.pdf22 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect crt.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer crt.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-06-2023.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-06-2023_1 (4 files merged).pdf14 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Prime Developers 30-06-2023.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf8 May 2023
Other - LegalFile: Image.pdf8 May 2023
PAN CardFile: kailash pan card aadhar card_1.pdf31 Dec 2022
CERSAI detailsFile: CERSAI Search Report.pdf31 Dec 2022
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organization.pdf31 Dec 2022
Layout approvalFile: PLAN.pdf30 Dec 2022
Building plan approvalFile: PLAN.pdf30 Dec 2022
Copy of the legal title reportFile: TITLE REPORT.pdf30 Dec 2022
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE and LEGAL.pdf30 Dec 2022
Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE and LEGAL.pdf30 Dec 2022
Copy of Layout Approval (in case of layout)File: PLAN.pdf30 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf30 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: COMM CERT.pdf30 Dec 2022
Declaration about Commencement CertificateFile: declaration about comm cert.pdf30 Dec 2022
Declaration in FORM BFile: Form B Promoter.pdf30 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT DRAFT NEW.pdf30 Dec 2022
Proforma of Agreement for saleFile: AFS.pdf30 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla.pdf30 Dec 2022
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf30 Dec 2022

How this compares with Raigarh

50%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 3 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PINNACLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAHAL5,900+ in Raigarh

2 kmPINNACLECompleted 125Lapsed / revoked 41Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 287 registered projects within 2 km.

Builder: KAILAS PRABHAKAR BANKHELE

KAILAS PRABHAKAR BANKHELE has 1 registration on MahaRERA, including PINNACLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PINNACLE is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PINNACLE?

The registered promoter entity is KAILAS PRABHAKAR BANKHELE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PINNACLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PINNACLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PINNACLE?

The professionals named in the filing: Architect: SHEETAL ARCHITECTS; Engineer: AGHARKAR CONSULTANTS; Chartered Accountant: CA DEVYANI SHEJWAL; Chartered Accountant: D P SHEJWAL AND ASSOCIATES; Chartered Accountant: MANISH K RAMAWATI AND COMPANY; Chartered Accountant: M.S Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PINNACLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINNACLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINNACLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.