Registered No litigation declared Plotted project

Phoenix Park

By Luxora Infrastructure Private Limited

RG-MH-19069 · RERA P50500078104 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
55 of 172Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Phoenix Park is a Plotted project by Luxora Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500078104 on 25 Nov 2024. Possession is promised by 31 Jul 2027. 117 of the 172 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePhoenix Park
  • TypePlotted
  • Location
    • Pipla Phata Road
    • Mouza-Pipla
    • Besa
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • RERA no.P50500078104
  • ReraGenie IDRG-MH-19069

Builder

  • NameLuxora Infrastructure Private Limited
  • Entity typeCompany
  • CINU70100MH2007PTC166943
  • GSTIN27AABCL2854K2ZA
  • DirectorsDeepak Mahadeo Vasandani, Tarun Hundalani
  • Other registrations22 more →
  • Completed8 of 23
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2024PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Jul 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed73 files

Current status

68%117 of 172 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes30%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes30%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area41,292 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBESA-PIPLA NAGARPANCHAYAT

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURAJ HOUSE, SHOP NO 1 AND 2, GR FLOOR, PATLIPADA, GHODBUNDER ROAD THANE MAHARASHTRA 400607

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Eleven
EngineerStudio Eleven
EngineerJeevan Ramkrishna Kute
Chartered AccountantJain Nirmal Kumar & Associates
Chartered AccountantNeha Joshi
PartnerRole in project
Luxora Infrastructure Private Limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500239Mrinal KatkarLuxora Infrastructure Private Limited29/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: QA_Cert_Phoenix Park_Mar_26.pdf18 Jun 2026
Withdrawal Update Form 1File: Arch_Cert_Upload_Phoenix Park_Mar_26.pdf4 May 2026
Withdrawal Update Form 2File: Engg_Cert_Upload_Phoenix Park_Mar_26.pdf4 May 2026
Withdrawal Update Form 3File: CA_Cert_Upload_Phoenix Park_Mar_26.pdf4 May 2026
Form 5 (FY 2024-2025)File: Form 5_Upload_Phoenix Park_FY24_25.pdf5 Feb 2026
Withdrawal Update Form 1File: Arch_Cert_Upload_PP_Dec_25.pdf24 Jan 2026
Withdrawal Update Form 2File: Engg_Cert_Upload_PP_Dec_25.pdf24 Jan 2026
Withdrawal Update Form 3File: CA_Cert_Phoenix Park_Dec_25.pdf24 Jan 2026
Withdrawal Update Form 1File: Arch_Cert_Phoenix Park_Sep_25.pdf27 Nov 2025
Withdrawal Update Form 2File: Engg_Cert_Phoenix_Park_Upload_Sep_25.pdf27 Nov 2025
Withdrawal Update Form 3File: CA_Cert_Phoenix Park_Sep_25.pdf27 Nov 2025
Withdrawal Update Form 1File: Arch_Cert_Phoenix Park_Sep_25.pdf24 Nov 2025
Withdrawal Update Form 2File: Engg_Cert_Phoenix_Park_Upload_Sep_25.pdf24 Nov 2025
Withdrawal Update Form 3File: CA_Cert_Phoenix Park_Sep_25.pdf24 Nov 2025
Withdrawal Update Form 1File: Arch_Cert_Phoenix Park_Jun_25_Signed.pdf30 Jul 2025
Withdrawal Update Form 2File: Engg_Cert_Phoenix Park_Jun_25_Signed.pdf30 Jul 2025
Withdrawal Update Form 3File: CA_Cert_Phoenix Park_Jun_25.pdf30 Jul 2025
Form 2A (FY 2024-2025)File: QA_Cert_Phoenix Park_Mar_25.pdf11 Jun 2025
Form 1File: FORM-1.pdf2 Jun 2025
Form 2File: FORM-2.pdf2 Jun 2025
Form 3File: FORM-3.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory.pdf2 Jun 2025
Withdrawal Update Form 1File: FORM-1.pdf31 May 2025
Withdrawal Update Form 2File: FORM-2.pdf31 May 2025
Withdrawal Update Form 3File: FORM-3.pdf31 May 2025
Other - TechnicalFile: PHOE NIX PARK CC.pdf22 Nov 2024
Other - TechnicalFile: annexure A Phoenix park.pdf22 Nov 2024
Building plan approval or NA orderFile: Sanction Plan v1-2.pdf16 Nov 2024
Building plan approval or NA orderFile: Sanction Plan v1-1_11zon.pdf16 Nov 2024
Layout approvalFile: Sanction Plan v1-2.pdf16 Nov 2024
Layout approvalFile: Sanction Plan v1-1_11zon.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan v1-1_11zon.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan v1-2.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Phoenix Park_Reg.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan v1-1_11zon.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan v1-2.pdf16 Nov 2024
Other - TechnicalFile: 4 Other - Legal (1)-37.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: LUXORA BEYOND COMPARE.pdf16 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 8)Format A.pdf15 Nov 2024
Proforma of Agreement for saleFile: Agreement to Sale.pdf15 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Phoenix Park.pdf15 Nov 2024
Copy of the legal title reportFile: 13)Legal Title_Phoenix Park.pdf30 Oct 2024
Details of encumbrances concerned to FinanceFile: 5)Financial Encumbrance.pdf30 Oct 2024
Details of encumbrances concerned to FinanceFile: 6)Legal Encumbrance.pdf30 Oct 2024
Proforma of Allotment letterFile: 1)Allotment Letter.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_page-0001.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert.pdf30 Oct 2024
Other - LegalFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)_-1-13.pdf30 Oct 2024
Other - LegalFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)_-14-26.pdf30 Oct 2024
Other - LegalFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)-27-39.pdf30 Oct 2024
Other - LegalFile: Sale Deed Khasra No 63-1,63-2,64-1,64-2,66-1,66-2,108-3,80-2 (GOPL- 217070000).pdf30 Oct 2024
Declaration about Commencement CertificateFile: Form D.pdf30 Oct 2024
CERSAI detailsFile: 7)CERSAI Declaration.pdf30 Oct 2024
Deviation Report with respect to Allotment letterFile: 4)Deviation Allotment Letter.pdf30 Oct 2024
Details of encumbrances concerned to LegalFile: 5)Financial Encumbrance.pdf30 Oct 2024
Details of encumbrances concerned to LegalFile: 6)Legal Encumbrance.pdf30 Oct 2024
Other - FinanceFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)_-1-13.pdf30 Oct 2024
Other - FinanceFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)_-14-26.pdf30 Oct 2024
Other - FinanceFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)-27-39.pdf30 Oct 2024
Other - FinanceFile: Sale Deed Khasra No 63-1,63-2,64-1,64-2,66-1,66-2,108-3,80-2 (GOPL- 217070000).pdf30 Oct 2024
Other - TechnicalFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)-27-39.pdf30 Oct 2024
Other - TechnicalFile: Sale Deed Khasra No 63-1,63-2,64-1,64-2,66-1,66-2,108-3,80-2 (GOPL- 217070000).pdf30 Oct 2024
Other - TechnicalFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)_-14-26.pdf30 Oct 2024
Other - TechnicalFile: Sale Deed khasra No 63-3,68,76 (COPL- 116045300)_-1-13.pdf30 Oct 2024
Other - TechnicalFile: Disclosure_signed.pdf30 Oct 2024
Other - TechnicalFile: 12)Annexure A.pdf30 Oct 2024
Deviation Report with respect to model copy of AgreementFile: 3)Deviation Agreement for Sale.pdf30 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: 9)Disclosure for Secured_Unsecured Finance.pdf30 Oct 2024
Declaration in FORM BFile: 10)Form B.pdf29 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_DV.pdf25 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_TH.pdf25 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order 17 Acre.pdf21 Oct 2024
PAN CardFile: LIPL_PAN.pdf19 Oct 2024

How this compares with Nagpur

68%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Phoenix Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza-Pipla2,800+ in Nagpur

Builder: Luxora Infrastructure Private Limited

Luxora Infrastructure Private Limited has 23 registrations on MahaRERA, including Treeline 5 and Vista 3B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Phoenix Park is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Phoenix Park?

The registered promoter entity is Luxora Infrastructure Private Limited, a company as per the filing. Its CIN U70100MH2007PTC166943 and GSTIN 27AABCL2854K2ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Phoenix Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Phoenix Park?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Phoenix Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Phoenix Park?

The professionals named in the filing: Architect: Studio Eleven; Engineer: Studio Eleven; Engineer: Jeevan Ramkrishna Kute; Chartered Accountant: Jain Nirmal Kumar & Associates; Chartered Accountant: Neha Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Phoenix Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Phoenix Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Phoenix Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.