Phase III - J1 Building
RG-MH-21384 · RERA P52100011749 · Last updated on MahaRERA portal: 30 Jan 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 75 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Phase III - J1 Building is a Residential / Group Housing project by Shree Sai Associates in Pune, Maharashtra, registered with MahaRERA as P52100011749 on 31 Aug 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 75 months from the original filing. 6 complaints are on record with the regulator.
At a glance
Project
- NamePhase III - J1 Building
- TypeResidential / Group Housing
- Location
- Chakan Khed road
- Chakan
- Chakan (CT)
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100011749
- ReraGenie IDRG-MH-21384
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Dec 2019)
- Buildings2 building records
- Documents filed41 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Phase III - 1st to 7th Floors | NA | 7 | 0 | 0 | 0 | 0 |
| Phase III - 8th to 11th Floors | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.
Phase III - 1st to 7th Floors30%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Phase III - 8th to 11th Floors58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 30 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 20% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed220
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Phase III - 1st to 7th Floors | 110 | 110 |
| Phase III - 8th to 11th Floors | 110 | 110 |
Land and ownership9
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sunil Yeshwant Wadekar | Chakan (CT) | Pune |
| Ajij Sajjubhai Sikilkar | Chakan (CT) | Pune |
| Salim Sajjubhai Sikilkar | Chakan (CT) | Pune |
| Dattatraya Tukaram Kandage | Chakan (CT) | Pune |
| Shankar Tukaram Kandage | Chakan (CT) | Pune |
| Ananda Bala Dhadge | Chakan (CT) | Pune |
| Kisar Ranu Kandage | Chakan (CT) | Pune |
| Chandrakant Ranu Kandage | Chakan (CT) | Pune |
| Vilas Genubhau Kandage | Chakan (CT) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Deepak Honkan |
| Partner | Role in project |
|---|---|
| Shree Sai Associates | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Promoter has applied for partial completion of the project (Please review documents attached). Major portion of the project is complete, and the common amenities are being completed. However, the promoter requests for additional time to complete the balance 10% work, due to the following reasons: 1) There was a lot of strain on cash flows due to reduced customer bookings and economic slowdown in the market. Therefore, payments to contractors was delayed, 2) Banks and financial institutions were not giving any grace period, and significant cash flows from the customers were utilised to repa
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 55.26% allottees for purpose of extension of RERA registration period of the said project.
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000011482 | Om Prakash | SHREE SAI ASSOCIATES | 04/08/2018 |
| CC005000000011685 | Hemchandra Sahu | Shree Sai Associates | 04/08/2018 |
| CC005000000011701 | Vaibhav Bendre | Shree Sai Associates | 04/08/2018 |
| CC005000000011867 | Kanchan Kumar | SHREE SAI ASSOCIATES | 04/08/2018 |
| CC005000000011854 | PRAFUL CHAND KESHWAR RAI | SHREE SAI ASSOCIATES | 04/08/2018 |
| CC005000000011868 | SANDEEP KSHIRASAGAR | SHREE SAI ASSOCIATES | 04/08/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed41
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CERSAI detailsFile: CERSAI.pdf | 30 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Ganesh.pdf | 30 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 30 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - J1.pdf | 29 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Merged.pdf | 29 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 -2017-2019.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5- 2018-2019.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-2019-2020.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM -5 J1.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 18 Jan 2024 |
| Certificates of CA (Form 3)File: Form-3 J1 SEPT 2023_11zon.pdf | 12 Jan 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration J1 Building.pdf | 22 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29 Latest.pdf | 22 Dec 2023 |
| Certificates of CA (Form 3)File: Form - 3 21-22_11zon.pdf | 22 Dec 2023 |
| Certificates of CA (Form 3)File: Form - 3 21-22_11zon.pdf | 22 Nov 2023 |
| Certificates of CA (Form 3)File: FORM -3_11zon.pdf | 16 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 architecht J1 I1.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM -2A 2019-20.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 2020-21.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM -2A 2021-22.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A 2022-23.pdf | 29 Aug 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration.pdf | 26 Jul 2023 |
| Declaration in FORM BFile: Form B Phase III Promoter.pdf | 17 May 2023 |
| Disclosure of sold/ booked inventoryFile: circular 29.pdf | 9 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Phase3 - Form5 upto FY2018-19.pdf | 13 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Phase3 - Form5 upto FY2018-19.pdf | 13 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Phase3-Form5_FY2019-20.pdf | 13 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Phase III_Commencement certificate.pdf | 30 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Phase III_NOC.pdf | 30 Apr 2018 |
| Building plan approvalFile: I1 and J1 HPSCANNER0122.pdf | 3 Aug 2017 |
| Layout approvalFile: Layout HPSCANNER0123 (1).pdf | 3 Aug 2017 |
| Copy of the legal title reportFile: Phase III.pdf | 3 Aug 2017 |
| Details of encumbrancesFile: Phase 3.pdf | 3 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Layout HPSCANNER0123 (1).pdf | 3 Aug 2017 |
| Building Plan Approval (IOD)File: I1 and J1 HPSCANNER0122.pdf | 3 Aug 2017 |
| Declaration in FORM BFile: Promoters.pdf | 3 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase III.pdf | 3 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase III.pdf | 3 Aug 2017 |
| Certificates of CA (Form 3)File: Phase III.pdf | 3 Aug 2017 |
| Proforma of Allotment letterFile: PHASE III RERA Draft 12950 SqMtr.pdf | 3 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 41 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Phase III - J1 Building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chakan13,700+ in Pune
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: Shree Sai Associates
SHREE SAI ASSOCIATES has 12 registrations on MahaRERA, including SHREE SAI ENCLAVE and SHREE SAI PARK. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Phase III - J1 Building shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Phase III - J1 Building is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Phase III - J1 Building?
The registered promoter entity is Shree Sai Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Phase III - J1 Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Phase III - J1 Building?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Phase III - J1 Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Phase III - J1 Building?
The professionals named in the filing: Architect: Deepak Honkan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Phase III - J1 Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback