Phase I - Buildings A, A1, P and S,T,U Combined wing

By Shree Sai Associates

RG-MH-24438 · RERA P52100010202 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 108 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 108 months from the original
36 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
132 of 245Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Phase I - Buildings A, A1, P and S,T,U Combined wing is a Residential / Group Housing project by Shree Sai Associates in Pune, Maharashtra, registered with MahaRERA as P52100010202 on 24 Aug 2017. Possession is promised by 31 Dec 2030. The completion date has moved by 108 months from the original filing. 113 of the 245 units on this registration are recorded sold or booked, and 36 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePhase I - Buildings A, A1, P and S,T,U Combined wing
  • TypeResidential / Group Housing
  • Location
    • -
    • Chakan (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010202
  • ReraGenie IDRG-MH-24438

Builder

  • NameShree Sai Associates
  • Entity typePartnership
  • PartnersGanesh Laxman Zagade, Hrishikesh Chandrakant Zagade
  • Other registrations11 more →
  • Completed3 of 12
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Aug 2017
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Dec 2021)
  • Buildings4 building records
  • Documents filed87 files

Current status

46%113 of 245 units booked
100.0%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Phase I - A BuildingNA4435035
Phase I - A1 BuildingNA8728028
Phase I - P BuildingNA4456056
Phase I - Buildings S, T and U - CombinedNA871260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Phase I - A Building90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Phase I - A1 Building90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Phase I - P Building90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Phase I - Buildings S, T and U - Combined90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed504

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots504
Closed/Covered504
BuildingClosed/CoveredTotal
Phase I - A Building5656
Phase I - A1 Building7070
Phase I - P Building126126
Phase I - Buildings S, T and U - Combined252252

Land and ownership70

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,301 sq m
Land owned byThe promoter, with other names on the file
Named landowners70
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Mar 2026
LandownerVillageDistrict
Kisan Sitaram ChakateChakan (CT)Pune
Usha Vijay BhondveChakan (CT)Pune
Sachin Pandurang JagtapChakan (CT)Pune
Shakuntala Pandurang JagtapChakan (CT)Pune
Prabhakar Gopala ShindeChakan (CT)Pune
Subhash Gangaram TalekarChakan (CT)Pune
Kundlik Babanrao SatkarChakan (CT)Pune
Ramdas Namdev TupeChakan (CT)Pune
Bhagvan Kondiba GaikwadChakan (CT)Pune
Shankar Nathu SatkarChakan (CT)Pune
Arun Baburao SavantChakan (CT)Pune
Dhondu Tukaram ShindeChakan (CT)Pune
Shankar Ramchandra ShivekarChakan (CT)Pune
Gabaji Tukaram LoteChakan (CT)Pune
Chhaya Tukaram KasabiChakan (CT)Pune
Sabaji Ganpat MedgeChakan (CT)Pune
Damodar Ganpat PingleChakan (CT)Pune
Raghunath Dhondiba MedgeChakan (CT)Pune
Sudam Appaji BhokseChakan (CT)Pune
Balasaheb Bhikaji KhengaleChakan (CT)Pune
Baban Jijaba TalekarChakan (CT)Pune
Suresh Gopala ShindeChakan (CT)Pune
Anjana Shantaram MedgeChakan (CT)Pune
Dattu Rambhau BaccheChakan (CT)Pune
Ganpat Tabaji KalokheChakan (CT)Pune
Baburam Sakharam ShindeChakan (CT)Pune
Savitra Baluram ShindeChakan (CT)Pune
ShantaramTukaram ShindeChakan (CT)Pune
Tarabai Shantaram SawantChakan (CT)Pune
Namdev Krushnaji SawantChakan (CT)Pune
Ramdas Barku NikamChakan (CT)Pune
Lata Ramchandra KhamkarChakan (CT)Pune
Rambhau Dada PandeChakan (CT)Pune
Raghunath Dwarku MaratheChakan (CT)Pune
Shivkumar Sudamrao OkaseChakan (CT)Pune
Sanjay Eknath PawarChakan (CT)Pune
Dhananjay Shankarrao SawantChakan (CT)Pune
Purshottam Shankarrao SawantChakan (CT)Pune
Surekha Shivajirao DhamaleChakan (CT)Pune
Ujwala Shantaram ShindeChakan (CT)Pune
Dasharath Ganpath GoreChakan (CT)Pune
Devaram Ganapat goreChakan (CT)Pune
Sitaram Ganpat GoreChakan (CT)Pune
Rajaram Ganpat GoreChakan (CT)Pune
Sunil Jayaram GoreChakan (CT)Pune
Anil Jayaram GoreChakan (CT)Pune
Chaya Gangadhar KhedkarChakan (CT)Pune
Laxmibai Jayaram GoreChakan (CT)Pune
Surajsingh Mahadevsingh ParadeshiChakan (CT)Pune
Kiran Mahadevsingh ParadeshiChakan (CT)Pune
Narayan Yashwant ZagadeChakan (CT)Pune
Laxman Namdeo ZagadeChakan (CT)Pune
Chandrakant MuralidharZagadeChakan (CT)Pune
Madhav Ram ZagadeChakan (CT)Pune
Mukund Ram ZagadeChakan (CT)Pune
Shakuntala Ram ZagadeChakan (CT)Pune
Sandip Rajaram ZagadeChakan (CT)Pune
Sameer Rajaram ZagadeChakan (CT)Pune
Seema Rajaram ZagadeChakan (CT)Pune
Shoukat Kadarmiya SikilkarChakan (CT)Pune
Akhtar Kadarmiya SikilkarChakan (CT)Pune
Ruksana Bashir AttarChakan (CT)Pune
Hajarabi Kadarmiya SikilkarChakan (CT)Pune
Shahida Kusubaddin SikilkarChakan (CT)Pune
Nasim Gulamhussain SikilkarChakan (CT)Pune
Mustakh Gulamhussain SikilkarChakan (CT)Pune
Khajabhai Jafar PathanChakan (CT)Pune
Taj Sirajuddin KureshiChakan (CT)Pune
Mussa Rasul ShaikhChakan (CT)Pune
Sitaram Kondiba VahileChakan (CT)Pune

Approvals and building plan

Sanctioning authorityGrampanchayat Chakan
Permissible FSI11300.93
Proposed, not sanctioned6,938 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChakan Khed
Estimated costRs 28.26 cr
Cost incurredRs 28.26 cr
Work done100.0%
BuildingWingEstimatedIncurred
Phase I - A BuildingNARs 7.06 crRs 7.06 cr
Phase I - A1 BuildingNARs 7.06 crRs 7.06 cr
Phase I - P BuildingNARs 7.06 crRs 7.06 cr
Phase I - Buildings S, T and U - CombinedNARs 7.06 crRs 7.06 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak Honkan
EngineerShirke Consultants Pvt. Ltd.
Chartered AccountantPravin Pise and Associates
PartnerRole in project
Shree Sai Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28032620421Dec 2021 → Dec 2030

Reason as filed by the promoterThe project completion has been delayed due to circumstances beyond the control of the promoter. The project was adversely affected by delays in statutory approvals, disruption in availability of labor and construction materials, and interruptions caused by external factors. In addition, unforeseen administrative and operational challenges impacted the planned construction schedule. Despite these difficulties, the promoter has continued construction activities and remains fully committed to completing the project at the earliest. The extension is sought to ensure timely completion with require

Litigation declared2

CaseCourtStatus
3812/2014/2014Chief Judicial MagistrateHearing pending
3812/2014/2014Chief Judicial MajistrateOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502639SWAPNANAGRI SAHKARI GRUHNIRMAN SANGH MARYADITShree Sai Associates30/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - March 2024.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate FY 2023-24.pdf6 May 2026
Form 3File: F3-MARCH-24.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 1File: Form 1 - March 2024.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate FY 2023-24.pdf6 May 2026
Form 3File: F3-MARCH-24.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 1File: Form 1 - March 2024.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate FY 2023-24.pdf6 May 2026
Form 3File: F3-MARCH-24.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 1File: Form 1 - March 2024.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate FY 2023-24.pdf6 May 2026
Form 3File: F3-MARCH-24.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 1File: Form 1 - June 2025.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate JUNE 25.pdf6 May 2026
Form 3File: F3-JUNE-25.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 1File: Form 1 - Sep 2025.pdf6 May 2026
Form 3File: F3-SEPT-25.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate SEPT 25.pdf6 May 2026
Form 1File: Form 1 - Dec 2025.pdf6 May 2026
Form 3File: F3-DEC-25.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Form 2File: Form 2 - Dec 2025.pdf6 May 2026
Form 1File: Form 1 - Mar 2025.pdf6 May 2026
Form 2File: Form 2 - Engineer Certificate FY 2024-25.pdf6 May 2026
Form 3File: Form 3 CA Certificate FY 2024-25.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - March 2024.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - June 2025.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - Sep 2025 (1).pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf6 May 2026
Withdrawal Update Form 1File: Form 1 - March 2026.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate FY 2023-24.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate JUNE 25.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate SEPT 25.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf6 May 2026
Withdrawal Update Form 3File: F3-MARCH-24.pdf6 May 2026
Withdrawal Update Form 3File: Form 3- CA Certificate JUNE 25.pdf6 May 2026
Withdrawal Update Form 3File: F3-SEPT-25 (1).pdf6 May 2026
Withdrawal Update Form 3File: F3-SEPT-25 (1).pdf6 May 2026
Withdrawal Update Form 3File: F3-SEPT-25 (1).pdf6 May 2026
Withdrawal Update Form 3File: F3-DEC-25.pdf6 May 2026
Withdrawal Update Form 3File: Form 3 - March 2026 (2).pdf6 May 2026
CERSAI detailsFile: phase i- cersai.pdf1 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: phase i- format A.pdf1 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: phase i- annexure A.pdf1 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: phase i- 2A 23-24.pdf1 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A P S T U A1 Phase.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-2020-2021.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FROM 5 - 2021-2022.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5- 2022-2023.pdf17 Jan 2024
Certificates of CA (Form 3)File: FORM -3 A,AI,P,S,T,U SEPT 2023.pdf11 Jan 2024
Declaration about Commencement CertificateFile: 1 Declaration.pdf26 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-(Phase I A,A1,P,STU-compressed.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: A1 19-20.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A1 20-21.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: A1 21-22.pdf15 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: A1 22-23.pdf15 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-(Phase I A,A1,P,STU-compressed.pdf13 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Phase_1_Form_5 upto FY_2018-19.pdf19 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Phase_1_Form_5 upto FY_2018-19.pdf19 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Phase_1_Form_5 FY_2019-20.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Phase III_Commencement certificate.pdf30 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Phase III_NOC.pdf30 Apr 2018
Building plan approvalFile: A and A1 Compressed.pdf3 Aug 2017
Building plan approvalFile: P and STU compressed1.pdf3 Aug 2017
Layout approvalFile: Layout.pdf3 Aug 2017
Copy of the legal title reportFile: Phase 1.pdf3 Aug 2017
Details of encumbrancesFile: Phase 1.pdf3 Aug 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf3 Aug 2017

How this compares with Pune

46%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 108 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Phase I - Buildings A, A1, P and S,T,U Combi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chakan (CT)13,700+ in Pune

2 kmPhase I - Buildings A, ACompleted 2Lapsed / revoked 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Shree Sai Associates

SHREE SAI ASSOCIATES has 12 registrations on MahaRERA, including SHREE SAI ENCLAVE and SHREE SAI PARK. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Phase I - Buildings A, A1, P and S,T,U Combined wing is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Phase I - Buildings A, A1, P and S,T,U Combined wing?

The registered promoter entity is Shree Sai Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Phase I - Buildings A, A1, P and S,T,U Combined wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Phase I - Buildings A, A1, P and S,T,U Combined wing?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Phase I - Buildings A, A1, P and S,T,U Combined wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Phase I - Buildings A, A1, P and S,T,U Combined wing?

The professionals named in the filing: Architect: Deepak Honkan; Engineer: Shirke Consultants Pvt. Ltd.; Chartered Accountant: Pravin Pise and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Phase I - Buildings A, A1, P and S,T,U Combined wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Phase I - Buildings A, A1, P and S,T,U Combined wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Phase I - Buildings A, A1, P and S,T,U Combi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.