Home / Browse projects / Pune, Maharashtra / Pharande Prowess

Registered No litigation declared Commercial project

Pharande Prowess

By Pharande Promoters and Builders

RG-MH-84142 · RERA P52100077436 · Last updated on MahaRERA portal: 12 Feb 2026

Source: official MahaRERA filing

Red flags

  • Rs 145.00 crore secured on the land, in favour of CATALYST TRUSTEESHIP LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedno revision filed
5 of 55Construction stages doneacross 5 buildings; furthest along: Basement (if any), 10%
28 of 99Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Pharande Prowess is a Commercial project by Pharande Promoters and Builders in Pune, Maharashtra, registered with MahaRERA as P52100077436 on 16 Aug 2024. Possession is promised by 30 Sep 2028. 71 of the 99 units on this registration are recorded sold or booked, and 5 of 55 construction stages are filed complete.

At a glance

Project

  • NamePharande Prowess
  • TypeCommercial
  • Location
    • Boradewadi
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100077436
  • ReraGenie IDRG-MH-84142

Builder

  • NamePharande Promoters and Builders
  • Entity typePartnership
  • GSTIN27AAHFP9748F1ZR
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAkash Rajendra Pharande, Ramesh Jayram Pharande, Ravindra Jayram Pharande, Pharande Promoters and Builders Pvt Ltd, Anil Jayram Pharande
  • Other registrations20 more →
  • Completed5 of 21
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2024PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2024
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed40 files

Current status

72%71 of 99 units booked

Figures as on 12 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WingNA1002626
B-WingNA2002828
C-WingNA2002424
D-WingNA2001515
E-WingNA20066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 12 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 10%.

A-Wing11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-Wing11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C-Wing11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D-Wing11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E-Wing11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,700 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofCATALYST TRUSTEESHIP LIMITED
Secured amountRs 145.00 crore
CERSAI search filedYes
Declared on3 May 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation (PCMC)
Permissible FSI3280.39
Proposed, not sanctioned3,280 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMALA CROSSROADS,UNIT NOS. 1 TO 4 and 26 TO 29, OPP.PCMC OFFICE.PUNE MAHARASHTRA 411017

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVoussoirs Architect and Interior Designers (Ar. Sameer Valimbe)
EngineerShubham Devram Pawar
EngineerSanket Potdar
Chartered AccountantG N Mantri & Associates
Chartered AccountantR. Devendra Kumar & Associates (CA Avtarsingh Saini)
PartnerRole in project
Pharande Promoters and Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: PHARANDE PROWESS_CA CERTIFICATE_FORM-5_2024-25.pdf12 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHARANDE PROWESS_ARCHITECT CERTIFICATE_DECEMBER-24_ FORM-1.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: PHARANDE PROWESS_SOLD-UNSOLD_DECEMBER-24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHARANDE PROWESS_ARCHITECT CERTIFICATE_SEP-24_ FORM-1.pdf9 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: SECURE UNSECURED LOAN CERTIFICATE.pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCE.pdf10 Aug 2024
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCE.pdf10 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK FORMAT-B.pdf7 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTFICATE CONFIRMATION.pdf1 Aug 2024
CERSAI detailsFile: 21) CERSAI DETAILS_R1.pdf1 Aug 2024
Proforma of Agreement for saleFile: 1 RERA Prowess Draft_Agreement 27-7-2024.pdf29 Jul 2024
Proforma of Allotment letterFile: Allotment letter Pharande Prowess.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12) ARCHITECT CERTIFICATE_FORM-1.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 22) CA CERTIFICATE_FORM-3_compressed.pdf27 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RAVINDRA SIR DIRECTOR INTEREST IN REAL ESTATE ORGANIZATION.pdf27 Jul 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AGREEMENT_compressed.pdf27 Jul 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING_ANNEXURE-A.pdf27 Jul 2024
Copy of the legal title reportFile: 4 FORMAT A Legal Title and Flow chart.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: 8 Financial Encumbrance Certificate.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: 9 Legal Encumbrance Certificate.pdf26 Jul 2024
Details of encumbrances concerned to LegalFile: 8 Financial Encumbrance Certificate.pdf26 Jul 2024
Details of encumbrances concerned to LegalFile: 9 Legal Encumbrance Certificate.pdf26 Jul 2024
Declaration in FORM BFile: 3 FORM B Pharande Prowess_compressed.pdf26 Jul 2024
Deviation Report with respect to Allotment letterFile: 2 Deviation of Allotment.pdf26 Jul 2024
Layout approvalFile: PHARANDE PROWESS SANCTION PLAN.pdf24 Jul 2024
Building plan approvalFile: PHARANDE PROWESS SANCTION PLAN.pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: PHARANDE PROWESS SANCTION PLAN.pdf24 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: PHARANDE PROWESS SANCTION PLAN.pdf24 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: PHARANDE PROWESS COMMENCEMENT CERTIFICATE_100724_compressed.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM-2.pdf23 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: AKASH SIR DIRECTOR INTEREST IN REAL ESTATE ORGANIZATION.pdf22 Jul 2024
PAN CardFile: PAN CARD.pdf20 Jul 2024
Declaration about Commencement CertificateFile: COMMENCEMENT CERTFICATE.pdf20 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANIL SIR DIRECTOR INTEREST IN REAL ESTATE ORGANIZATION.pdf20 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RAMESH SIR DIRECTOR INTEREST IN REAL ESTATE ORGANIZATION.pdf20 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT-A ACCOUNT.pdf20 Jul 2024
Other - LegalFile: 7-12 EXTRACT.pdf20 Jul 2024
Other - LegalFile: SALE DEED_1-15.pdf20 Jul 2024
Other - LegalFile: SALE DEED_16-25.pdf20 Jul 2024
Other - LegalFile: SALE DEED_26-42.pdf20 Jul 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Woodsville Phase 2Gat No 103 109 and 110 Moshi Borhadewadi Near MNGL Gas Station Off Spine Road PCMC Pune235CompletedApr 2016Late, Apr 2017
Woodsville Phase 3Gat No 725 Moshi Borhadewadi Near MNGL Gas Station Off Spine Road PCMC Pune127CompletedMar 2016Late, Apr 2017
L-Axis Phase 1 Part APlot No 12 Sector 6 Moshi Pradhikaran141CompletedMar 2016Late, Apr 2017
Woodsville Phase 1 Cluster BGat No 97 Moshi Borhadewadi Near MNGL Gas Station Off Spine Road PCMC Pune184CompletedJan 2015Late, Apr 2016
Woodsville Phase 1 Cluster AGat No 97 Moshi Borhadewadi Near MNGL Gas Station Off Spine Road PCMC Pune376CompletedSep 2012Late, Dec 2013

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pharande Prowess on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

Builder: Pharande Promoters and Builders

Pharande Promoters and Builders has 21 registrations on MahaRERA, including L Axis Phase 1 Cluster B and Woodsville Phase 3 Cluster B. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pharande Prowess is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pharande Prowess?

The registered promoter entity is Pharande Promoters and Builders, a partnership as per the filing. Its GSTIN 27AAHFP9748F1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pharande Prowess?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pharande Prowess?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pharande Prowess?

The professionals named in the filing: Architect: Voussoirs Architect and Interior Designers (Ar. Sameer Valimbe); Engineer: Shubham Devram Pawar; Engineer: Sanket Potdar; Chartered Accountant: G N Mantri & Associates; Chartered Accountant: R. Devendra Kumar & Associates (CA Avtarsingh Saini). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pharande Prowess?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pharande Prowess. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pharande Prowess to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.